Volunteer Projects — Pacific Crest Trail Association
Hood River Ranger District
10/1/1999 to 9/30/2000

Activity Summary

Scouting: 40
Signing: 4
Trail Maintenance (PCT): 448


Total Volunteer Hours: 492

Activity Detail (most recent on top)

Project Date: 8/26/2000
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Top Spur to 1.5 Miles North
Description: Removed one tree, performed brushing and tread maintenance.

Volunteers

Hours
Hayden, Andy 8
Konner, Jack 8
Logan, Kathy 8
Matson, Al 8
Nyberg, Carl 8
Owen, Kim 8
Owen, Pam 8
Schemm, George 8
Vhay, John 8

Project Total: 72

Project Date: 8/7/2000
District: Hood River Ranger District
Leader: Dave Cobb
Location: Lolo Pass north
Description: Removed three large blowdown in the 2.5 miles from Lolo Pass.

Volunteers

Hours
Hammack, Brice 8
Martiny, Chuck 8

Project Total: 16

Project Date: 8/5/2000
District: Hood River Ranger District
Leader: Jack Konner
Location: Wahtum Lake to Inspriration Point
Description: Logged out six trees, reconstructed tread and performed brushing.

Volunteers

Hours
Konner, Jack 8
Logan, Kathy 8
Owen, Kim 8
Payne, Steve 8
Schemm, George 8
Van Zant, Mary 8
Vetter, Dick 8
Walker, Richard 8

Project Total: 64

Project Date: 8/1/2000
District: Hood River Ranger District
Leader: Jack Konner
Location: Wahtum Lake to Inspiration Point
Description: Scouting for August 5 work project.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 7/22/2000
District: Hood River Ranger District
Leader: Dave Cobb
Location: Lolo Pass to Salvation Springs (.5 mile past)
Description: Logged out 23 trees. Three large trees remain. One on scree slope one mile north of Lolo Pass and two others one mile past that. Rootwad by the two other trees. Needs brushing and tread work, especially at Lolo Pass.

Volunteers

Hours
Cobb, Dave 8
Kenyon, Don 8
Kenyon, Sherri 8
Martiny, Chuck 8

Project Total: 32

Project Date: 7/15/2000
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Lolo Pass to Top Spur
Description: Seven volunteers filled holes in the trail, cleaned two water bars and brushed. Two short sections remain on the high ridge whee elderberry has grown over the trail.

Volunteers

Hours
Ballard, Danial 8
Ballard, Greg 8
Cobb, Roberta 8
Harris, Breck 8
Harris, Scott 8
Mattice, Paul 8
Wismer, Kyle 8

Project Total: 56

Project Date: 7/14/2000
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Lolo Pass to Top Spur
Description: Completed sign inventory and prepped for upcoming work project.

Volunteers

Hours
Cobb, Roberta 4

Project Total: 4

Project Date: 7/8/2000
District: Hood River Ranger District
Leader: Jack Konner
Location: Chinidere Mountain to North Hatfield Wilderness boundary
Description: Five volunteers performed tread maintenance and logged out 12 trees on an overnight trip. Two equestrian volunteers packed in camping gear to Benson camp. Trail is now in excellent condition.

Volunteers

Hours
Hoeye, Rob 16
Konner, Jack 16
McNatt, Cindy 8
McNatt, Frank 8
Nyberg, Carl 16
Rueter, John 16
Vetter, Dick 16

Project Total: 96

Project Date: 7/8/2000
District: Hood River Ranger District
Leader: Dave Cobb
Location: Hatfield Wilderness boundary to Buck Peak
Description: Three volunteers logged out 25 trees on an overnight trip. Four trees remain (2 are 2 miles south of Bull Run boundary and 2 are at switchbacks by spring. One root wad remains to be removed.

Volunteers

Hours
Cobb, Dave 16
Hilands, Bill 16
Hubatch, Robert 16

Project Total: 48

Project Date: 6/24/2000
District: Hood River Ranger District
Leader: Jack Konner
Location: Chinidere Mountain to north Hatfield Wilderness boundary
Description: Three volunteers scouted the section of PCT that was officially completed under contract with the Forest Service last year. Moved many logs off the trail by hand and ten remain to be bucked (using crosscut saws). Inventoried existing signage against the 1994 Mount Hood sign plan.

Volunteers

Hours
Konner, Jack 8
Schaefer, Kary 8
Smith, Bernie 8

Project Total: 24

Project Date: 6/23/2000
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Lolo Pass to Top Spur
Description: Four volunteers logged out 8 trees, performed light brushing and filled some holes in the trail. One log remains because it is buried in snow.

Volunteers

Hours
Cobb, Roberta 8
Goodwin, Katie 8
Goodwin, Ron 8
Vetter, Dick 8

Project Total: 32

Project Date: 6/23/2000
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass to Wapinitia Pass
Description: Four volunteers logged out 40 trees and performed light brushing.

Volunteers

Hours
Hammack, Brice 8
Hanson, Lorena 8
McLaughlin, Larry 8
Walker, Richard 8

Project Total: 32

Project Date: 4/4/2000
District: Hood River Ranger District
Leader: Jack Konner
Location: Hatfield Wilderness to .5 mi. south of lookout
Description: One volunteer scouted south until snow stopped him about .5 mile south of the lookout. The trail is in good shape. There is one medium sized log blocking half of the trail ten or twenty yards into the Wilderness boundary. It could be pushed off by 2 or three people. There are no logs across the trail between the Herman Creek trail junction and the Hatfield Wilderness boundary.

Volunteers

Hours
Konner, Jack 8

Project Total: 8