Volunteer Projects — Pacific Crest Trail Association
Hood River Ranger District
10/1/1999 to 9/30/2000
Activity Summary |
Scouting: | 40 |
Signing: | 4 |
Trail Maintenance (PCT): | 448 |
Total Volunteer Hours: | 492 |
Activity Detail (most recent on top) |
Project Date: | 8/26/2000 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Top Spur to 1.5 Miles North |
Description: | Removed one tree, performed brushing and tread maintenance. |
Volunteers |
Hours |
Hayden, Andy | 8 |
Konner, Jack | 8 |
Logan, Kathy | 8 |
Matson, Al | 8 |
Nyberg, Carl | 8 |
Owen, Kim | 8 |
Owen, Pam | 8 |
Schemm, George | 8 |
Vhay, John | 8 |
Project Total: 72 |
Project Date: | 8/7/2000 |
District: | Hood River Ranger District |
Leader: | Dave Cobb |
Location: | Lolo Pass north |
Description: | Removed three large blowdown in the 2.5 miles from Lolo Pass. |
Volunteers |
Hours |
Hammack, Brice | 8 |
Martiny, Chuck | 8 |
Project Total: 16 |
Project Date: | 8/5/2000 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Wahtum Lake to Inspriration Point |
Description: | Logged out six trees, reconstructed tread and performed brushing. |
Volunteers |
Hours |
Konner, Jack | 8 |
Logan, Kathy | 8 |
Owen, Kim | 8 |
Payne, Steve | 8 |
Schemm, George | 8 |
Van Zant, Mary | 8 |
Vetter, Dick | 8 |
Walker, Richard | 8 |
Project Total: 64 |
Project Date: | 8/1/2000 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Wahtum Lake to Inspiration Point |
Description: | Scouting for August 5 work project. |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |
Project Date: | 7/22/2000 |
District: | Hood River Ranger District |
Leader: | Dave Cobb |
Location: | Lolo Pass to Salvation Springs (.5 mile past) |
Description: | Logged out 23 trees. Three large trees remain. One on scree slope one mile north of Lolo Pass and two others one mile past that. Rootwad by the two other trees. Needs brushing and tread work, especially at Lolo Pass. |
Volunteers |
Hours |
Cobb, Dave | 8 |
Kenyon, Don | 8 |
Kenyon, Sherri | 8 |
Martiny, Chuck | 8 |
Project Total: 32 |
Project Date: | 7/15/2000 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Lolo Pass to Top Spur |
Description: | Seven volunteers filled holes in the trail, cleaned two water bars and brushed. Two short sections remain on the high ridge whee elderberry has grown over the trail. |
Volunteers |
Hours |
Ballard, Danial | 8 |
Ballard, Greg | 8 |
Cobb, Roberta | 8 |
Harris, Breck | 8 |
Harris, Scott | 8 |
Mattice, Paul | 8 |
Wismer, Kyle | 8 |
Project Total: 56 |
Project Date: | 7/14/2000 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Lolo Pass to Top Spur |
Description: | Completed sign inventory and prepped for upcoming work project. |
Volunteers |
Hours |
Cobb, Roberta | 4 |
Project Total: 4 |
Project Date: | 7/8/2000 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Chinidere Mountain to North Hatfield Wilderness boundary |
Description: | Five volunteers performed tread maintenance and logged out 12 trees on an overnight trip. Two equestrian volunteers packed in camping gear to Benson camp. Trail is now in excellent condition. |
Volunteers |
Hours |
Hoeye, Rob | 16 |
Konner, Jack | 16 |
McNatt, Cindy | 8 |
McNatt, Frank | 8 |
Nyberg, Carl | 16 |
Rueter, John | 16 |
Vetter, Dick | 16 |
Project Total: 96 |
Project Date: | 7/8/2000 |
District: | Hood River Ranger District |
Leader: | Dave Cobb |
Location: | Hatfield Wilderness boundary to Buck Peak |
Description: | Three volunteers logged out 25 trees on an overnight trip. Four trees remain (2 are 2 miles south of Bull Run boundary and 2 are at switchbacks by spring. One root wad remains to be removed. |
Volunteers |
Hours |
Cobb, Dave | 16 |
Hilands, Bill | 16 |
Hubatch, Robert | 16 |
Project Total: 48 |
Project Date: | 6/24/2000 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Chinidere Mountain to north Hatfield Wilderness boundary |
Description: | Three volunteers scouted the section of PCT that was officially completed under contract with the Forest Service last year. Moved many logs off the trail by hand and ten remain to be bucked (using crosscut saws). Inventoried existing signage against the 1994 Mount Hood sign plan. |
Volunteers |
Hours |
Konner, Jack | 8 |
Schaefer, Kary | 8 |
Smith, Bernie | 8 |
Project Total: 24 |
Project Date: | 6/23/2000 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Lolo Pass to Top Spur |
Description: | Four volunteers logged out 8 trees, performed light brushing and filled some holes in the trail. One log remains because it is buried in snow. |
Volunteers |
Hours |
Cobb, Roberta | 8 |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Vetter, Dick | 8 |
Project Total: 32 |
Project Date: | 6/23/2000 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass to Wapinitia Pass |
Description: | Four volunteers logged out 40 trees and performed light brushing. |
Volunteers |
Hours |
Hammack, Brice | 8 |
Hanson, Lorena | 8 |
McLaughlin, Larry | 8 |
Walker, Richard | 8 |
Project Total: 32 |
Project Date: | 4/4/2000 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Hatfield Wilderness to .5 mi. south of lookout |
Description: | One volunteer scouted south until snow stopped him about .5 mile south of the lookout. The trail is in good shape. There is one medium sized log blocking half of the trail ten or twenty yards into the Wilderness boundary. It could be pushed off by 2 or three people. There are no logs across the trail between the Herman Creek trail junction and the Hatfield Wilderness boundary. |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |