Activity Detail (most recent on top)

Project Date: 8/25/2001
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Brushing from 4200' to 4800'. Brushing remains to be done from 4900' to 5200'. Overnight 8/25 to 8/26.

Volunteers

Hours
Artman, Alan 13
Carr, Pete 20
Conover, Scott 20
Greene, Allen (Skip) 14
Harris, Scott 15
Matson, Al 19
Owen, Kim 19
Owen, Pam 19
Scroggins, Tom 19

Project Total: 158

Project Date: 8/15/2001
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Brushed out huckleberry and vine maple.

Volunteers

Hours
Arkes, Bob 10
Basque, Andy 10
Dalton, Oliver 9
Gibson, Bus 9
Goodwin, Katie 9
Goodwin, Ron 9
Greene, Allen (Skip) 10
Hilands, Bill 10
Martiny, Chuck 10
Nail, Don 11
White, Hal 9

Project Total: 106

Project Date: 7/28/2001
District: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Road 58
Description: Repaired drainage dips and water bar. Got the saw bar stuck on the first tree attempted. Bruce Thompson from USFS accompanied. Five trees to be logged out by USFS on 7/30.

Volunteers

Hours
Plant, Steve 8
Price, Tracy 8

Project Total: 16

Project Date: 7/21/2001
District: Hood River Ranger District
Leader: Jack Konner
Location: Wahtum Lake to Herman Creek Trail Junction
Description: Logged out five trees with crosscut and axe and five by hand. Repaired three water bars, brushed four miles of trail and filled numerous holes. Two volunteers walked Hatfield Wilderness to the Gorge and replaced all missing PCT logos.

Volunteers

Hours
Artman, Alan 10
Cleek, Billie 11
Conover, Scott 11
Hammack, Brice 11
Konner, Jack 11
Nyberg, Carl 14

Project Total: 68

Project Date: 7/18/2001
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Logged out eight trees. Repaired 20 drain dips and 38 water bars. Brushed one half mile of trail. Filled in 20' of sandy trail with sandbags hauled from 20'. Widened 100' of tread. Posted 3.5" logo.

Volunteers

Hours
Christy, Don 10
Goodwin, Katie 10
Goodwin, Ron 10
Hugo, Merrill 11
Nail, Don 11
Nemchick, Hal 11
Queen, Gene 10
White, Hal 10

Project Total: 83

Project Date: 7/13/2001
District: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 18 trees and performed brushing.

Volunteers

Hours
Baker, Frances 16
Baker, Jim 12
Goulet, Becky 16
Goulet, Rachelle 16
Goulet, Rachenda 16
Goulet, Ron 16
Goulet, Ryan 16
Gray, Don 16
Gray, Loise 12
Strahm, Ernie 16
Strahm, Lori 16
Whitman, Howard 16

Project Total: 184

Project Date: 7/7/2001
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Jude Lake to Road 42
Description: Logged out 12 trees and cleaned 34 water bars. Sign inventory done.

Volunteers

Hours
Arnold, John 7
Peasley, Jack 7
Peasley, Vicki 11
Roe, David 7
Roe, Eric 7
Wolf, Becky 7

Project Total: 46

Project Date: 7/7/2001
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Jude Lake to Road 42
Description: Logged out many trees and brushed six miles.

Volunteers

Hours
Clark, Anthony 10
Clark, Sheila 10
Ivy, Eugene 10
Lister, Norlene 5
Mecklem, Nancy 13
Mecklem, Tony 13
Meng, Don 10
Meng, Laurie 10
Meng, Mickell 10
Moore, Dorothy 5
Moore, Mike 10
Mossman, Sharon 10
Mossman, Tom 5
Rambus, Amanda 10
Rocha, Dan 13
Schlitt, Barbara 5
Turnacliff, Angie 10
Walsh, Ed 10
Wirth, Rebecca 13

Project Total: 182

Project Date: 7/6/2001
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Jude Lake to Road 42
Description: Logged out and two miles of brushing.

Volunteers

Hours
Lister, Norlene 9
Mossman, Tom 10
Schlitt, Barbara 10
Smore, Dorothy 10

Project Total: 39

Project Date: 7/6/2001
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Jude Lake to Road 42
Description: Logged out 85 trees and cleaned 22 drainage dips.

Volunteers

Hours
Crompton, Al 10
Peasley, Jack 9
Peasley, Vicki 9
Roe, David 9
Roe, Eric 9
Wirth, Rebecca 10
Wolf, Becky 10

Project Total: 66

Project Date: 7/5/2001
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Logged out three trees and brushed out for 0.2 mile.

Volunteers

Hours
Goodwin, Ron 9
White, Hal 9

Project Total: 18

Project Date: 6/30/2001
District: Zig Zag Ranger District
Leader: Roberta Cobb
Location: Sandy River
Description: Cleared two fords across Sandy River and built ramps for horses and people to climb out of riverbank. Marked trail with cairns. Cleared brush and rocks to make trail obvious and easy to use.

Volunteers

Hours
Basque, Andy 12
Chamberlin, Liz 12
Chamberlin, Tim 12
Christy, Don 12
Cobb, Roberta 12
Dalton, Oliver 12
Gamer, Jeff 12
Owen, Kim 12

Project Total: 96

Project Date: 6/29/2001
District: Hood River Ranger District
Leader: Dave Cobb
Location: Hatfield Wilderness to Road N2
Description: Logged out six small trees

Volunteers

Hours
Cobb, Dave 9
Fleischer, Daniel 9

Project Total: 18

Project Date: 6/18/2001
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass to Wapinitia Pass
Description: Removed five logs, performed brushing and tread maintenance, and cleaned out drainage dips.

Volunteers

Hours
Arkes, Bob 11
Arkes, Jane 11
Brown, Gary 11
Brown, Maureen 11
Carr, Pete 11
Christy, Don 11
Cobb, Roberta 11
Kern, David 11
Reimers, Wes 11

Project Total: 99

Project Date: 6/17/2001
District: Hood River Ranger District
Leader: Jack Konner
Location: Hatfield Wilderness
Description: Scouted. Removed four logs by hand.

Volunteers

Hours
Carter, Patty 14
Konner, Jack 14
Smith, Bernie 14

Project Total: 42

Project Date: 6/9/2001
District: Hood River Ranger District
Leader: Dave Cobb
Location: Lolo Pass to Top Spur
Description: Logged out six trees, brushed out and filled holes on first half mile south of Lolo Pass. One 30" tree remains one half mile north of Top Spur junction.

Volunteers

Hours
Cobb, Dave 8
Conover, Scott 8
Owen, Kim 8

Project Total: 24

Project Date: 5/21/2001
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Wapinitia Pass to Barlow Pass
Description: Logged out 21 trees small trees.

Volunteers

Hours
Cobb, Roberta 8
Martiny, Chuck 9

Project Total: 17

Project Date: 5/21/2001
District: Zig Zag Ranger District
Leader: Larry McLaughlin
Location: Little Crater Lake to Road 42
Description: Logged out 12 trees, cleaned drainage dips and water bars, brushed 30 feet of dense rhododendron, filled two soft spots.

Volunteers

Hours
Hammack, Brice 10
McLaughlin, Larry 10
Vetter, Dick 10
Walker, Richard 10

Project Total: 40

Project Date: 5/12/2001
District: Zig Zag Ranger District
Leader: Steve Queen
Location: Still Creek Trail
Description: Crew leader training with Mary Ellen Fitzgerald. Hiked 2.5 mile trail identifying trail maintenance needs.

Volunteers

Hours
Konner, Jack 9
McLaughlin, Larry 9
Plant, Steve 9
Queen, Steve 9

Project Total: 36

Project Date: 5/6/2001
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Wapinitia Pass to Twin Lakes Trail
Description: Scouted. Moved 11 trees by hand. Picked up a lot of trash.

Volunteers

Hours
Brown, Gary 9
Brown, Maureen 9
Cobb, Roberta 9

Project Total: 27

Project Date: 4/28/2001
District: Clackamas River Ranger District
Leader: Steve Queen
Location: Clackamas/Estacada Ranger Station
Description: Four volunteers participated in a chainsaw re-certification course with the Clackamas/Estacada Ranger District.

Volunteers

Hours
Cobb, Roberta 9
Konner, Jack 9
McLaughlin, Larry 9
Plant, Steve 9

Project Total: 36

Project Date: 4/24/2001
District: Hood River Ranger District
Leader: Jack Konner
Location: Herman Creek to below Tea Kettle Springs (3,300')
Description: Scouted. Trail in good shape. Two trees intruding on trail, but not bad. Defer logout to the Wahtum Lake trip.

Volunteers

Hours
Konner, Jack 10

Project Total: 10

Project Date: 10/25/2000
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Removed 5 blowdowns and brushed huckleberry from the lower mile of the trail. Snow line at 5500'.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16