Volunteer Projects — Pacific Crest Trail Association
Columbia River Gorge
10/1/2001 to 9/30/2002

Activity Summary

Meeting: 14
Trail Maintenance (PCT): 499


Total Volunteer Hours: 513

Activity Detail (most recent on top)

Project Date: 9/24/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: Road 2090
Description: Insight meeting for a habitat enhancement sale by the DNR that is adjacent to the PCT approximately 1500 feet of trail south of road 2090 and approximately 700 feet of trail North of Road 2090.

Volunteers

Hours
Hammack, Brice 7
Lukins, Dick 7

Project Total: 14

Project Date: 8/30/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: South of Three Corner Rock
Description: Primariy focus of trip was to find ways to transport volunteers into a section of PCT close to Table Mountain. Brusing and treadwork performed.

Volunteers

Hours
Gibson, Bus 9
Hammack, Brice 11
Lukins, Dick 11

Project Total: 31

Project Date: 7/8/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: Three Corner Rock (north and south)
Description: Logged out 12 trees and repaired 12 water bars. Brushed using two power brush cutters.

Volunteers

Hours
Daly, Jim 11
Doty, Pat 12
Gibson, Bus 11
Hammack, Brice 11
Lukins, Dick 12
Martiny, Chuck 11
McLaughlin, Larry 11
Vetter, Dick 11
Walker, Richard 12

Project Total: 102

Project Date: 6/29/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: Three Corner Rock south
Description: Logged out 12 trees and cut out vine maple.

Volunteers

Hours
Lukins, Dick 9

Project Total: 9

Project Date: 6/24/2002
District: Columbia River Gorge
Leader: Brice Hammack
Location: Mile north of Bridge of the Gods
Description: Used two brush cutters to brush section of trial immediately above Highway 14.

Volunteers

Hours
Hammack, Brice 9
Lukins, Dick 10

Project Total: 19

Project Date: 6/14/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: South of Three Corner Rock to Carpenters Lake Trail jct.
Description: Logged out 17 trees, cleaned 6 water bars and repaired 3 slides. Used 2 power brush cutters to brush over 2 miles of trail.

Volunteers

Hours
Doty, Pat 13
Gibson, Bus 13
Goodwin, Katie 13
Goodwin, Ron 13
Hammack, Brice 13
Lukins, Dick 13
Maddox, Ken 12
Martiny, Chuck 13
McLaughlin, Larry 13

Project Total: 116

Project Date: 4/19/2002
District: Columbia River Gorge
Leader: Larry McLaughlin
Location: Road 2090 to North of Road 2070
Description: Logged out 15 trees and 3.5 miles of light brushing.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Rueter, John 10

Project Total: 40

Project Date: 4/13/2002
District: Columbia River Gorge
Leader: Steve Queen
Location: Carpenter's Lake Trail jct. to Bridge of the Gods
Description: Logged out 6 trees, cleaned 20 drain dips. Rebuilt wet spot north of viewpoint with wing ditches and raised tread with rocks and dirt. Cleaned wing ditch at Greenleaf Creek, whiich hadn't held up well. Paid special attention to upper drainage failure which caused most of the problems.

Volunteers

Hours
Andersen, Jon 3
Conrad, Glen 9
Conrad, Linda 9
Hilands, Bill 9
Holmstrom, Tim 11
Hugo, Merrill 9
Nyberg, Carl 11
Queen, Steve 9

Project Total: 70

Project Date: 4/6/2002
District: Columbia River Gorge
Leader: Steve Queen
Location: Bridge of the Gods to Hatfield Wilderness
Description: Logged out ten trees (average 12"), cleaned 30 drain dips concentrating north of the powerlines, lowered the grade of the slide damaged area 8" and used the material removed to fill useless drain dips north of the slide.

Volunteers

Hours
Becker, Gail 10
Becker, Ken 10
Dalbey, David 8
Dockter, Lindy 8
Goodwin, Katie 8
Goodwin, Ron 8
Mayer, Tania 8
Pope, Rick 8
Queen, Steve 8
Reimers, Wes 8
Vhay, John 8
White, Hal 8

Project Total: 100

Project Date: 3/21/2002
District: Columbia River Gorge
Leader: Dick Lukins
Location: Wauna Viewpoint Trail
Description: Logged out 8 trees and repaired 14 water bars. Root damage repaired.

Volunteers

Hours
Hammack, Brice 6
Lukins, Dick 6

Project Total: 12