Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2001 to 9/30/2002
Activity Summary |
Scouting: | 48 |
Trail Maintenance (PCT): | 310 |
Total Volunteer Hours: | 358 |
Activity Detail (most recent on top) |
Project Date: | 8/23/2002 |
District: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Cleaned 15 drainage dips and 15 water bars and performed brushing on 0.2 mile of trail. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Project Total: 18 |
Project Date: | 7/30/2002 |
District: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Road 58 |
Description: | Logged out 50 logs, repaired 6 drainage dips and 2 water bars and performed minor brushing. One large tree took four members one hour to cut. |
Volunteers |
Hours |
Konner, Jack | 8 |
Plant, Steve | 9 |
Walker, Richard | 10 |
Walker, Robert | 10 |
Project Total: 37 |
Project Date: | 7/21/2002 |
District: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | Logged out 40 trees. |
Volunteers |
Hours |
Plant, Steve | 10 |
Price, Tracy | 10 |
Project Total: 20 |
Project Date: | 7/17/2002 |
District: | Zig Zag Ranger District |
Leader: | Larry McLaughlin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Logged out 129 trees, cleaned out drainage dips, repaired damage from one root wad, toted 15 bags of sand to a rutted area and filled. |
Volunteers |
Hours |
Hugo, Merrill | 9 |
Joachim, Gordon | 8 |
Lukins, Dick | 9 |
Martiny, Chuck | 9 |
McLaughlin, Larry | 9 |
Nelson, David | 8 |
Stevenson, John | 9 |
Vetter, Dick | 9 |
Vhay, John | 9 |
Walker, Richard | 9 |
Walker, Robert | 9 |
Project Total: 97 |
Project Date: | 7/2/2002 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Muddy Fork to Lolo Pass |
Description: | Scouted section. |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 6/22/2002 |
District: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass southbound for 2 miles |
Description: | Approximately 60 trees down in the first 2 miles. |
Volunteers |
Hours |
Plant, Steve | 3 |
Project Total: 3 |
Project Date: | 6/21/2002 |
District: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Logged out 35 trees, repaired 10 drainage dips and 20 water bars and performed 2 miles of brushing. Repaired low spot in trail where spring emerges. Filled 2 holes. |
Volunteers |
Hours |
Hammack, Brice | 11 |
Lukins, Dick | 11 |
McLaughlin, Larry | 11 |
Walker, Penny | 11 |
Walker, Richard | 11 |
Project Total: 55 |
Project Date: | 6/17/2002 |
District: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Scouted section. |
Volunteers |
Hours |
Walker, Penny | 8 |
Walker, Richard | 8 |
Project Total: 16 |
Project Date: | 6/17/2002 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | PCT in the Ramona Falls Loop |
Description: | Installed two signs at trail junction, realigned trail at Muddy Fork to avoid cutting the bank a the bridge. |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 6/6/2002 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Ramona Falls Loop |
Description: | Scouted section. |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 10/17/2001 |
District: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Placed 64 feet of logs from 8 foot treated posts along a slide area to keep trail from sliding down slope. Rebuilt two cairns east of Salmon River on upper part of trail. One new post five feet long in center and re-used second post. |
Volunteers |
Hours |
Arkes, Bob | 11 |
Basque, Andy | 11 |
Goodwin, Ron | 10 |
Greene, Allen (Skip) | 11 |
Lukins, Dick | 11 |
Martiny, Chuck | 11 |
McLaughlin, Larry | 11 |
Project Total: 76 |
Project Date: | 10/10/2001 |
District: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Scouted slide area 15 minutes north of Highway 35 for placement of logs on edge to keep trail from going down the slope. No trees on site suitable to use. |
Volunteers |
Hours |
Christy, Don | 5 |
Goodwin, Katie | 5 |
Goodwin, Ron | 5 |
Project Total: 15 |