Volunteer Projects — Pacific Crest Trail Association
Hood River Ranger District
10/1/2002 to 9/30/2003

Activity Summary

Scouting: 8
Trail Maintenance (PCT): 456


Total Volunteer Hours: 464

Activity Detail (most recent on top)

Project Date: 7/5/2003
District: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Removed 10 trees, cleaned all drainage dips, brushed with power brush cutter, widened tread and filled holes.

Volunteers

Hours
Carr, Pete 11
Carter, Patty 10
Cohn, Arnold 9
Gibson, Bus 11
Goodwin, Ron 11
Hammack, Brice 11
Hazeleger, Tienke 9
Hughes, Heather 11
Konner, Jack 10
McKinstry, Mindy 11
Owen, Kim 11
Perrin, Angie 11

Project Total: 126

Project Date: 6/28/2003
District: Hood River Ranger District
Leader: Barb Adams
Location: Hatfield Wilderness Boundary to Ruckel Creek Trail Jct.
Description: Removed 8 logs and pruned face-slappers.

Volunteers

Hours
Adams, Barb 9
Adams, Dave 9
Peasley, Jack 9
Peasley, Vicki 9

Project Total: 36

Project Date: 6/22/2003
District: Hood River Ranger District
Leader: Dave Cobb
Location: Lolo Pass to Buck Peak Trail Jct.
Description: Removed all logs, cleaned drainage dips, light brushing.

Volunteers

Hours
Cather, Robert 12
Cobb, Dave 12
Guzie, Andy 12
Slay, Dave 12

Project Total: 48

Project Date: 6/21/2003
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Removed 15 trees (average 10" with one 40"), cleaned and rebuilt 4 large drainage dips, 1200 feet of brushing.

Volunteers

Hours
Basque, Andy 12
Burke, Erin 12
Fra, Dawn 12
Gamer, Jeff 12
Shaw, Bonnie 12
Vhay, John 12
Wick, Kenneth 12

Project Total: 84

Project Date: 6/21/2003
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass to Wapinitia Pass
Description: Removed 27 small trees, repaired drainage dips.

Volunteers

Hours
Cobb, Roberta 8
Towill, Elizabeth 8
Winkler, Dan 9

Project Total: 25

Project Date: 6/13/2003
District: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass (Scouting)
Description: Scouting. 12 Trees on trail, 3 miles of brushing and tread repair needed.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 6/7/2003
District: Hood River Ranger District
Leader: Dave Cobb
Location: Hatfield Wilderness Boundary to Buck Peak Trail Jct. (6/7 and 6/8)
Description: Removed 12 trees (12" to 24"), cleaned 5 drainage dips and 16 water bars, brushed 2 miles through Indian Peak.

Volunteers

Hours
Beard, Dennis 14
Bowlsby, Brian 14
Carr, Pete 14
Cobb, Dave 14
Smith, Ron 14
Tetz, Ian 14

Project Total: 84

Project Date: 5/18/2003
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake Trail Jct. to Twin Lakes Trail Jct.
Description: Removed 6 trees. Stopped by snow.

Volunteers

Hours
Brown, Gary 8
Brown, Maureen 8
Cobb, Roberta 7
Towill, Elizabeth 7

Project Total: 30

Project Date: 4/27/2003
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake Junction to Twin Lake Trail
Description: Scouting and hand cleared three trees.

Volunteers

Hours
Brown, Gary 8
Brown, Maureen 8
Cobb, Roberta 7

Project Total: 23