Volunteer Projects — Pacific Crest Trail Association
Hood River Ranger District
10/1/2002 to 9/30/2003
Activity Summary |
Scouting: | 8 |
Trail Maintenance (PCT): | 456 |
Total Volunteer Hours: | 464 |
Activity Detail (most recent on top) |
Project Date: | 7/5/2003 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass |
Description: | Removed 10 trees, cleaned all drainage dips, brushed with power brush cutter, widened tread and filled holes. |
Volunteers |
Hours |
Carr, Pete | 11 |
Carter, Patty | 10 |
Cohn, Arnold | 9 |
Gibson, Bus | 11 |
Goodwin, Ron | 11 |
Hammack, Brice | 11 |
Hazeleger, Tienke | 9 |
Hughes, Heather | 11 |
Konner, Jack | 10 |
McKinstry, Mindy | 11 |
Owen, Kim | 11 |
Perrin, Angie | 11 |
Project Total: 126 |
Project Date: | 6/28/2003 |
District: | Hood River Ranger District |
Leader: | Barb Adams |
Location: | Hatfield Wilderness Boundary to Ruckel Creek Trail Jct. |
Description: | Removed 8 logs and pruned face-slappers. |
Volunteers |
Hours |
Adams, Barb | 9 |
Adams, Dave | 9 |
Peasley, Jack | 9 |
Peasley, Vicki | 9 |
Project Total: 36 |
Project Date: | 6/22/2003 |
District: | Hood River Ranger District |
Leader: | Dave Cobb |
Location: | Lolo Pass to Buck Peak Trail Jct. |
Description: | Removed all logs, cleaned drainage dips, light brushing. |
Volunteers |
Hours |
Cather, Robert | 12 |
Cobb, Dave | 12 |
Guzie, Andy | 12 |
Slay, Dave | 12 |
Project Total: 48 |
Project Date: | 6/21/2003 |
District: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Removed 15 trees (average 10" with one 40"), cleaned and rebuilt 4 large drainage dips, 1200 feet of brushing. |
Volunteers |
Hours |
Basque, Andy | 12 |
Burke, Erin | 12 |
Fra, Dawn | 12 |
Gamer, Jeff | 12 |
Shaw, Bonnie | 12 |
Vhay, John | 12 |
Wick, Kenneth | 12 |
Project Total: 84 |
Project Date: | 6/21/2003 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass to Wapinitia Pass |
Description: | Removed 27 small trees, repaired drainage dips. |
Volunteers |
Hours |
Cobb, Roberta | 8 |
Towill, Elizabeth | 8 |
Winkler, Dan | 9 |
Project Total: 25 |
Project Date: | 6/13/2003 |
District: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass (Scouting) |
Description: | Scouting. 12 Trees on trail, 3 miles of brushing and tread repair needed. |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |
Project Date: | 6/7/2003 |
District: | Hood River Ranger District |
Leader: | Dave Cobb |
Location: | Hatfield Wilderness Boundary to Buck Peak Trail Jct. (6/7 and 6/8) |
Description: | Removed 12 trees (12" to 24"), cleaned 5 drainage dips and 16 water bars, brushed 2 miles through Indian Peak. |
Volunteers |
Hours |
Beard, Dennis | 14 |
Bowlsby, Brian | 14 |
Carr, Pete | 14 |
Cobb, Dave | 14 |
Smith, Ron | 14 |
Tetz, Ian | 14 |
Project Total: 84 |
Project Date: | 5/18/2003 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake Trail Jct. to Twin Lakes Trail Jct. |
Description: | Removed 6 trees. Stopped by snow. |
Volunteers |
Hours |
Brown, Gary | 8 |
Brown, Maureen | 8 |
Cobb, Roberta | 7 |
Towill, Elizabeth | 7 |
Project Total: 30 |
Project Date: | 4/27/2003 |
District: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake Junction to Twin Lake Trail |
Description: | Scouting and hand cleared three trees. |
Volunteers |
Hours |
Brown, Gary | 8 |
Brown, Maureen | 8 |
Cobb, Roberta | 7 |
Project Total: 23 |