Volunteer Projects — Pacific Crest Trail Association
Wind River Ranger District
10/1/2002 to 9/30/2003

Activity Summary

Trail Maintenance (PCT): 124
Training: 80


Total Volunteer Hours: 204

Activity Detail (most recent on top)

Project Date: 5/14/2003
District: Wind River Ranger District
Leader: Brice Hammack
Location: Sedum Ridge to Trout Creek
Description: Removed 12 trees with axe and handsaw, repaired all drainage dips, miscellaneous brushing and tread repair.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Vetter, Dick 10
Webb, Jim 10

Project Total: 50

Project Date: 5/2/2003
District: Wind River Ranger District
Leader: Brice Hammack
Location: Panther Creek to Carpenters Lake Trail Jct.
Description: Scouted (5/2 to 5/3).

Volunteers

Hours
Hammack, Brice 21

Project Total: 21

Project Date: 4/16/2003
District: Wind River Ranger District
Leader: Larry McLaughlin
Location: Road 2000 toward Sedum Ridge
Description: Logged out 12 trees between 3" and 16", cleaned six water bars and repaired two instances of slide damage. Misc brushing and tread repair.

Volunteers

Hours
Doty, Pat 11
Hammack, Brice 11
McLaughlin, Larry 11
Vetter, Dick 11
Webb, Jim 9

Project Total: 53

Project Date: 3/22/2003
District: Wind River Ranger District
Leader: Steve Queen
Location: Wind River Ranger Station (Chainsaw Certification)
Description: Eight volunteers participated in a chainsaw re-certification course with the Wind River Ranger District.

Volunteers

Hours
Cobb, Roberta 8
Doty, Pat 8
Goodwin, Ron 8
Hammack, Brice 8
Konner, Jack 8
Lukins, Dick 8
Martiny, Chuck 8
McLaughlin, Larry 8
Walker, Richard 8
Webb, Jim 8

Project Total: 80