Project Date: 7/11/2004
District: Columbia River Gorge
Leader: Roberta Cobb
Location: Herman Creek Trail Junction to Teakettle Springs
Description: Crew 1: Removed 6 logs, filled holes in trail, fixed 2 switchbacks, fixed sign at Teakettle Springs. Crew 2: Repaired 300' of trail, fixed a drainage dip, cleared 25' of poison oak.

Volunteers

Hours
Arkes, Bob 9
Brown, Gary 9
Brown, Maureen 9
Cobb, Roberta 9
Vhay, John 9
Winkler, Dan 9

Project Total: 54

Project Date: 6/16/2004
District: Columbia River Gorge
Leader: Chuck Martiny
Location: Gravel Pit to Carpenters Lake Trail Junction
Description: Logged out 14 small trees with hand saw. Cleaned 30 drain dips and 40 water bars. Repaired tread over 6 miles.

Volunteers

Hours
Hammack, Brice 13
Martiny, Chuck 13
McLaughlin, Larry 13
Murphy, Des 13
Vetter, Dick 13

Project Total: 65

Project Date: 6/9/2004
District: Columbia River Gorge
Leader: Larry McLaughlin
Location: Road 2070 to Three Corner Rock
Description: Logged out 10 trees with hand saws. Cleaned 200 drain dips. Repaired 150 fee of tread south of Three Corner Rock.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10
Vetter, Dick 10

Project Total: 50

Project Date: 5/20/2004
District: Columbia River Gorge
Leader: Dick Lukins
Location: Highway 14 to Fort Rains
Description: Brushing with power brusher. Work to keep small streams in channel. Scouting around Three Corner Rock.

Volunteers

Hours
Gouger, Gary 8
Lukins, Dick 10
Martiny, Chuck 9

Project Total: 27

Project Date: 5/13/2004
District: Columbia River Gorge
Leader: Dick Lukins
Location: Cascade Locks area
Description: Met with Chuck Daughtry from Port of Cascade Locks to look over PCT on Port property, then over to Washington to slook at section of P CT that had been logged.

Volunteers

Hours
Dawson, Mike 7
Lukins, Dick 7

Project Total: 14

Project Date: 5/4/2004
District: Columbia River Gorge
Leader: Dick Lukins
Location: Fort Rains to Bridge of the Gods
Description: Removed poison oak and cleared three drains.

Volunteers

Hours
Hammack, Brice 8
Lukins, Dick 8

Project Total: 16

Project Date: 3/31/2004
District: Columbia River Gorge
Leader: Dick Lukins
Location: Fort Rains to Bridge of the Gods
Description: Scouting north of Carpenters Lake.

Volunteers

Hours
Lukins, Dick 7
Martiny, Chuck 7
Martiny, Karen 7

Project Total: 21

Project Date: 3/14/2004
District: Columbia River Gorge
Leader: Steve Queen
Location: Carpenters Lake Trail Junction to Fort Rains
Description: Logged out 10 trees, cleaned and repaired 50 drainage dips, repaired one slide area, brushed 100 feet, widened 1000 feet of tread, cleaned 3 bridges, cleaned wing ditches in 2 locations, and raked fir boughs.

Volunteers

Hours
Allen, Eric 12
Beard, Dennis 12
Hovin, Leif 7
Matson, Al 12
Nemchick, Hal 12
Owen, Kim 12
Owen, Pam 12
Queen, Steve 11
Schaefer, Kary 7
Simmons, Jessie 12
Waxman, Andy 12

Project Total: 121

Project Date: 3/13/2004
District: Columbia River Gorge
Leader: Steve Queen
Location: Bridge of the Gods to Hatfield Wilderness Boundary
Description: Logged out 15 trees (a 40" one was trimmed to allow equestrian passage), 50 drainage dips, 100 feet of tread widening, 500 feet of miscellaneous rock removal and treak resurfacing, cleaned Dry Creek bridge.

Volunteers

Hours
Basque, Andy 12
Cobb, Dave 7
Cobb, Roberta 12
Feldhaus, Joseph 12
Gamer, Jeff 12
Gamroth, Dennis 12
Gamroth, Sharon 12
Goodwin, Ron 12
Johnson, Kris 12
Kendoll, Jodi 12
Moses, Cindy 12
Queen, Steve 11

Project Total: 138

Project Date: 3/11/2004
District: Columbia River Gorge
Leader: Dick Lukins
Location: Fort Rains to Bridge of the Gods
Description: Removed several small trees. Cleared five stream crossings.

Volunteers

Hours
Lukins, Dick 6

Project Total: 6