Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2003 to 9/30/2004

Activity Summary

Other: 36
Scouting: 23
Trail Maintenance (PCT): 711
Training: 54


Total Volunteer Hours: 824

Activity Detail (most recent on top)

Project Date: 9/29/2004
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Surveying PCT; measuring with a wheel.

Volunteers

Hours
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 18

Project Date: 9/26/2004
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River Area
Description: Cleaned 25 drainage dips.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 9/26/2004
District: Zig Zag Ranger District
Leader: Roberta Cobb
Location: Lolo Pass to Ramona Falls
Description: Surveying PCT; measuring with a wheel.

Volunteers

Hours
Artman, Alan 9
Cobb, Roberta 9

Project Total: 18

Project Date: 8/25/2004
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass toward Timberline Lodge
Description: Repired 30 drain dips and 12 log water bars. Brushed 2 miles. Removed berm from trail. Filled in low spots.

Volunteers

Hours
Arkes, Bob 10
Brown, Jerry 9
Cather, Robert 10
Gibson, Bus 9
Goodwin, Katie 9
Goodwin, Ron 9
Hugo, Merrill 10
Matson, Al 9
Nelson, David 9
Scovill, Wynne 10
Sharp, Paul 10

Project Total: 104

Project Date: 7/17/2004
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Cleaned 108 drain dips and 4 water bars. Repaired 1 slide and brushed for 100 yards.

Volunteers

Hours
Babineaux, Richard 7
Baker, Nathan 11
Beard, Dennis 11
Brown, Jerry 11
Hilands, Bill 11
Hughes, Heather 7
Owen, Kim 11
Ribble, Bonnie 11
Ross, Bob 11
Sharp, Paul 11

Project Total: 102

Project Date: 7/7/2004
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Widened 600' of tread, filled in tread with sand in upper section (100'). Repaired drain dips and water bars. Replaced 1 sign.

Volunteers

Hours
Allen, Eric 10
Arkes, Bob 10
Gibson, Bus 9
Goodwin, Katie 9
Goodwin, Ron 9
Hammack, Brice 11
McEver, Jim 11
Nelson, David 10
Sharp, Paul 11
Vetter, Dick 10

Project Total: 100

Project Date: 6/26/2004
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Ramona Falls to Top Spur
Description: Logged out 16 trees. Removed limbs using pole saw south of Muddy Fork.

Volunteers

Hours
Carter, Patty 8
Goodwin, Katie 7
Goodwin, Ron 7
Szymkowski, Ken 7

Project Total: 29

Project Date: 6/19/2004
District: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: Logged out 30 trees, repaired 6 drainage dips and 6 water bars, cleared one large root wad.

Volunteers

Hours
Brown, Maureen 13
Carr, Pete 13
Castor, Linda 13
Cobb, Roberta 13
Langenderfer, Katrina 13
Langenderfer, Steve 13
Nyberg, Carl 13
Plant, Steve 13

Project Total: 104

Project Date: 6/12/2004
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River area (2 days)
Description: Logged out 12 logs, repaired 16 drain dips, repaired 1 slide, loose rock cleared from Ramona Falls trailhead to Sandy guard station. Wing ditch system at Rushing Water Creek cleaned; sloughing and slide damage repaired.

Volunteers

Hours
Barr, Austin 12
Calkins, Robert 13
Metke, Mike 13
Olson, Charlie 13
Olson, Rick 13
Owen, Kim 13
Owen, Pam 13
Rossi, Philip 13
Stadnik, Anj 12
Streif, Cole 12
Streif, David 12
Tanous, Rick 13
Yensen, Kermit 12
Yensen, Zac 12

Project Total: 176

Project Date: 6/10/2004
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Removed 4 trees, cleaned 3 drainage dips, brushed 0.1 mile of trail, removed branches from 2.5 miles of trail. Scouting for 7/7 work party.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 6/5/2004
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Ramona Falls to Top Spur
Description: Scouting. 14 trees to be logged out.

Volunteers

Hours
Carter, Patty 7
O'Neil, Geoff 7

Project Total: 14

Project Date: 5/22/2004
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Scouting. 10 logs across trail up to 4700'. Small slough near wing dich at upper Sandy crossing and water dips. Snow at 4700'.

Volunteers

Hours
Owen, Kim 9

Project Total: 9

Project Date: 5/19/2004
District: Zig Zag Ranger District
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Logged out 12 trees, cleaned 40 drain dips, brushed vine maple, performed minor tread repair and picked up litter.

Volunteers

Hours
Hammack, Brice 12
McLaughlin, Larry 12
Vetter, Dick 12
Walker, Penny 12
Walker, Richard 12

Project Total: 60

Project Date: 5/1/2004
District: Zig Zag Ranger District
Leader: Steve Queen
Location: Zig Zag Ranger Station (Chainsaw Certification)
Description: Six volunteers participated in a chainsaw re-certification course with the Zig Zag Ranger District.

Volunteers

Hours
Cobb, Roberta 9
McLaughlin, Larry 9
Plant, Steve 9
Queen, Steve 9
Silfies, Dean 9
Vhay, John 9

Project Total: 54