Volunteer Projects — Pacific Crest Trail Association
Mount Hood National Forest (Hood River, Zig Zag and Clackamas River Ranger Districts)
10/1/2004 to 9/30/2005

Activity Summary

Other: 40
Scouting: 50
Trail Maintenance (PCT): 2294
Training: 30


Total Volunteer Hours: 2414

Activity Detail (most recent on top)

Project Date: 9/25/2005
District: Hood River Ranger District
Leader: Barb Adams
Location: Indian Springs South
Description: Brushed by hand and filled holes for 4 miles.

Volunteers

Hours
Adams, Barb 11
Adams, Dave 11
Eggleston, Connie 11
Eggleston, Mike 11
Matson, Al 12
Mershon, Cynthia 7
Mershon, Jeff 7
Nyberg, Carl 15
Peschke, Bunny 11
White, Hal 11
Wick, Cathy 14
Wick, Kenneth 14

Project Total: 135

Project Date: 9/10/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls Trailhead to Upper Sandy River Crossing
Description: Cleaned 10 draindips and repaired 20' of slide damage. Removed rocks for 6 miles of ttrail, rerouted trail around a washout by the Sandy River

Volunteers

Hours
Goldberg, Koda 11
Hater, Pieter 11
Kenyon, Scott 11
Mastiacol, Josh 11
McCauley, Jeremy 11
Owen, Kim 11
Von Pouden, Jonathan 11

Project Total: 77

Project Date: 9/10/2005
District: Zig Zag Ranger District
Leader: Steve Queen
Location: West Zig Zag Trail
Description: Brushed and repaired tread on 1 mile of tread.

Volunteers

Hours
Adams, Barb 8
Carter, Patty 8
Goodwin, Katie 8
Goodwin, Ron 8
Hammack, Brice 8
Hanes, Douglas 8
Hilands, Bill 8
Konner, Jack 8
Lukins, Dick 8
Lum, Richard 8
McLaughlin, Larry 8
Murphy, Des 8
Nyberg, Carl 11
O'Neil, Geoff 8
Pikkola, Dane 8
Queen, Steve 8
Ranganathan, Nandini 8
Sharp, Paul 8
Vhay, John 8
Walker, Richard 8
White, Hal 8

Project Total: 171

Project Date: 9/8/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: End of year scouting and cleanup. Removed 1 tree and repaired 5 drainage dips.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 8/6/2005
District: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake (8/6-7)
Description: Logged out 6 miles, maintaine 3 miles of tread, repaired 2 drain dips, brushed 3 miles, repaired 1/4 mile of slide, timber reinforcements of slide area (64').

Volunteers

Hours
Cuerden, Becky 2
Gehring, Dave 10
Gehring, Lance 10
Gehring, Mikah 10
Hardison, Landon 15
Hutchison, Cindy 10
Hutchison, Dewayne 10
Hutchison, Seth 10
Rivera, Carla 2
Rivera, Richard 2
Stoutt, Jeff 15
Strahm, Ernie 10
Strahm, Lori 10
Welliver, Don 15

Project Total: 131

Project Date: 7/30/2005
District: Zig Zag Ranger District
Leader: Roberta Cobb
Location: Ramona Falls south
Description: Logged out 1 tree, cleaned 8 drainage dips, repaired 1 mile of tread.

Volunteers

Hours
Bolton, Gary 12
Brooks, Crystal 12
Brown, Maureen 12
Cobb, Roberta 12
Dalbey, David 12
Gifford, Bill 10
Hilands, Bill 12
Spreadborough, Jake 12
Stevenson, John 12
Vaughn, Stephanie 12
Vhay, John 12
Weston, Ruth 11

Project Total: 141

Project Date: 7/27/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Muddy Fork
Description: Brushed 100 yards.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 7/23/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Ramona Creek
Description: Replaced railing on bridge over Ramona Creek with natural materials.

Volunteers

Hours
Carter, Patty 8
Konner, Jack 9
O'Neil, Geoff 8
Pikkola, Dane 9

Project Total: 34

Project Date: 7/23/2005
District: Clackamas River Ranger District
Leader: John Wichman
Location: Breitenbush Lake to Park Ridge
Description: Trail Maintenance

Volunteers

Hours
Bonitz, Joe 10
Corey, Arden 10
Kitzhaber, Jim 10
Marshall, Ron 10
McCloud, Charles 10
Nichols, Claudia 10
Wichman, John 10

Project Total: 70

Project Date: 7/16/2005
District: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 3 trees, felled 1 snag, repaired 2 rock water bars and 8 drain dips, brushed 4 miles and maintained 3 miles of tread.

Volunteers

Hours
Gehring, Dave 8
Gehring, Lance 8
Gehring, Mikah 8
Hutchison, Dewayne 8
Peper, David 8
Rivera, Carla 3
Rivera, Richard 3
Stoutt, Jeff 8
Strahm, Ernie 16
Ugrai, Miklos 16

Project Total: 86

Project Date: 7/9/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake
Description: Replaced rails in horse camp.

Volunteers

Hours
Ellison, Terry 10
Howard, Bill 10
Jones, Billy 7
Jones, Guy 7
Jones, Merlyn 7
Latiolais, Paul 6
Reimers, Wes 10

Project Total: 57

Project Date: 7/9/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Access trail to PCT from Road 4220 - Red Lake Trail
Description: Logged out 6 trees from Lodge Pole Trail. Brushed 3 miles of huckleberry.

Volunteers

Hours
Boeckman, Renee 11
Levy, Kathy 12
Whitmyer, Dennis 7
Wolf, Becky 7

Project Total: 37

Project Date: 7/9/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Lower Lake to Fish Lake trails
Description: Brushing.

Volunteers

Hours
Howard, Roberta 9
Lister, Norlene 5
Schlitt, Barbara 5
Sischo, Gary 5
Sischo, Peg 5
Turner, Linda 10

Project Total: 39

Project Date: 7/8/2005
District: Clackamas River Ranger District
Leader: David Roe
Location: Pinhead Buttes to Jude Lake (7/8-9)
Description: Logged out 66 trees and the Russ Lake trail #716.

Volunteers

Hours
Roe, David 22
Roe, Eric 23
Sery, Theo 23

Project Total: 68

Project Date: 7/8/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Warm Springs River to Pinhead Buttes
Description: Logged out 22 trees and cleaned 18 water bars.

Volunteers

Hours
DeVall, Dolores 10
DeVall, Marty 10
Sischo, Gary 10
Sischo, Peg 10
Wolf, Becky 10

Project Total: 50

Project Date: 7/8/2005
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass to Hatfield Wilderness (7/8-9)
Description: Logged out 20 trees, cleaned water bars.

Volunteers

Hours
Adams, Barb 17
Adams, Dave 17
Conners, Steve 13
Davidson, Debbi 13
Kenny, Harold 14
Schotz, Lot 13
Schotz, Pam 13
Stice, Debbie 13
Tucker, Deniece 13

Project Total: 126

Project Date: 7/8/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Jude Lake to Lemiti Creek
Description: Logged out 15 trees, brushed 10 miles of huckleberries.

Volunteers

Hours
Jones, Billy 10
Jones, Guy 10
Jones, Merlyn 22
Latiolais, Paul 9
Lister, Norlene 9
Schlitt, Barbara 9
Whitmyer, Dennis 12

Project Total: 81

Project Date: 7/7/2005
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Repaired 2 spring area collection ditches and rebuilt tread. Brushed 100 yards of side hill. Logged out three trees.

Volunteers

Hours
Stein, Bill 8
Vhay, John 8

Project Total: 16

Project Date: 7/2/2005
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Joe Graham Horse Camp to Warm Springs River (7/2-3)
Description: Logged out 31 trees and brushed 3 miles.

Volunteers

Hours
Mecklem, Nancy 15
Mecklem, Tony 15

Project Total: 30

Project Date: 6/25/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park (6/25-26)
Description: Logged out 5 trees, cleaned 47 drain dips and 6 water bars. Repaired a slide, brushed 30 yards and repaired 100 yards of tread.

Volunteers

Hours
Amrein, Rick 15
Amrein, Rob 15
Forbes, Scot 15
Fuller, Hugh 15
Olson, Rick 13
Owen, Kim 16
Rossi, Philip 15
Streif, Cole 15
Streif, David 15
Tanous, Ed 15
Tanous, Rick 15

Project Total: 164

Project Date: 6/25/2005
District: Zig Zag Ranger District
Leader: Pam Owen
Location: Sandy River (6/25-26)
Description: Build equestrian approach to Sandy River. Cleaned 38 drainage dips and 3 water bars. Brushed 100 yards of willow and repaired 20 yard of tread.

Volunteers

Hours
Bowlsby, Brian 11
Carr, Pete 15
Coleman, Liz 16
Feldhaus, Joe 14
Kaai, Robin 16
Owen, Pam 16
Schemm, George 11
Sharp, Paul 11
Snyder, Gail 11

Project Total: 121

Project Date: 6/24/2005
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Major tread rebuild at springs. Rebuilt collection trenches. Repaird tread and brushed.

Volunteers

Hours
Arkes, Bob 10
Karlgaard, Karl 10
Pikkola, Dane 10
Sharp, Paul 10
Stevenson, John 10
Vhay, John 10

Project Total: 60

Project Date: 6/18/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spurs to Ramona Falls
Description: Logged out 10 trees, cleaned out all drainage dips and water bars.

Volunteers

Hours
Artman, Alan 10
Carr, Pete 11
Carter, Patty 11
Fosheim, John 10
Konner, Jack 11
O'Neil, Geoff 11
Pikkola, Dane 11

Project Total: 75

Project Date: 6/15/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Cairn replaced with 4' 4x4 and more rock at tag #955. Installed 1 new water bar in upper sandy near top #960. Replaced sign post to White River viewpoint. Removed 600' of outside berm. Re-dug ditch at stream crossing.

Volunteers

Hours
Anderson, Doug 9
Arkes, Bob 8
Goodwin, Katie 8
Goodwin, Ron 8
Konner, Jack 8
Lanz, Joel 8
Sharp, Paul 8
Weston, Ruth 8

Project Total: 65

Project Date: 6/11/2005
District: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: 30 trees logged out, 9 drain dips and 3 water bars repaired, 1 root wad repaired, 300' of rhododendron brushing, 150' of slough removal.

Volunteers

Hours
Arevalo, Christina 9
Conover, Scott 9
Goodwin, Ron 9
Lum, Richard 9
Plant, Steve 9
Roelof, Gerrit 9
Sharp, Paul 9
Spencer, Ken 9

Project Total: 72

Project Date: 6/4/2005
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass to Huckleberry
Description: Logged out 5 trees, repaird drainage dips, a puddle that wasn't draining, brushed 2 miles, repaired various 4' to 10' sections.

Volunteers

Hours
Adams, Barb 7
Adams, Dave 7
Burns, Jim 7
Burns, Julie 7
Kenny, Harold 7
Lesowke, Linda 6
Miller, Jeff 7
Miller, Nancy 7
Owens, Phyllis 7
Peschke, Bunny 6
Sparks, Laura 7
Walz, Jonni 7

Project Total: 82

Project Date: 6/4/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Scouting (Barlow Pass to Timberline Lodge)
Description: Scouting. 10 logs need to be removed, 42 drain dips and water bars to be cleaned, 800' of treadwork needed, 110' of huckleberry brushing needed. 200' of berms to remove.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 5/28/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spur to Lolo Pass
Description: Logged out 3 trees, repaired drainage dips and water bars, cut root wad and repaired damage it caused, filled many holes. Ken Kollas of USFS on site.

Volunteers

Hours
Carter, Patty 11
Konner, Jack 11
O'Neil, Geoff 11
Petersen, Steve 11
Stevenson, John 11
Vhay, John 11

Project Total: 66

Project Date: 5/22/2005
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass to Palmateer Trail
Description: Repaired 44 drainage dips. Removed slough and berm and restored outslope near parking area. Filled holes and removed 5' root from trail.

Volunteers

Hours
Cobb, Roberta 8
Conover, Scott 8
Dalbey, David 8
Guzie, Andy 8
Karlgaard, Karl 8
Pikkola, Dane 8
Stevenson, John 8
Weston, Ruth 8

Project Total: 64

Project Date: 5/21/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Scouting (Ramona Falls Jct to Paradise Park Jct)
Description: Scouting. Passable to hikers up to Paradise Park Jct. 22" log at 3900' stops horses.

Volunteers

Hours
Owen, Kim 10

Project Total: 10

Project Date: 5/15/2005
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass to Frog Lake
Description: Logged out 17 trees.

Volunteers

Hours
Brown, Gary 8
Brown, Maureen 8
Cobb, Roberta 9
Towill, Elizabeth 9

Project Total: 34

Project Date: 5/10/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Scouting (Ramona Creek to Top Spur)
Description: Scouting. 8 trees to be logged. Tread repair and bridge repair over Ramona Creek required.

Volunteers

Hours
Konner, Jack 9

Project Total: 9

Project Date: 5/4/2005
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake north to "switch back cliffs"
Description: Logged out 8 trees 14" and smaller.

Volunteers

Hours
Silfies, Dean 11
Vhay, John 11

Project Total: 22

Project Date: 5/3/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Scouting (Lolo Pass to Top Spur)
Description: Scouting. Root wad and 4 trees need to be removed. Tread repair needed.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 4/30/2005
District: Clackamas River Ranger District
Leader: Steve Queen
Location: Chainsaw Certification (Estacada Ranger Station)
Description: Five volunteers participated in a chainsaw re-certification course at the Estacada Ranger Station.

Volunteers

Hours
Martiny, Chuck 6
Plant, Steve 6
Strahm, Ernie 6
Webb, Jim 6
Welliver, Don 6

Project Total: 30

Project Date: 4/27/2005
District: Zig Zag Ranger District
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Logged out 14 trees, cleaned 20 drainage dips and 30 water bars. Put rocks into 2 holes in sunken section of trail; holes no in central path.

Volunteers

Hours
Doty, Pat 11
Hammack, Brice 11
McLaughlin, Larry 11
Walker, Ford 11
Walker, Penny 11
Walker, Richard 11

Project Total: 66

Project Date: 3/5/2005
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Scouting (Frog Lake to Twin Lakes Loop)
Description: Scouting. Snow almost gone. Three logs across trail. Tread holding up well.

Volunteers

Hours
Cobb, Roberta 7

Project Total: 7

Project Date: 10/14/2004
District: Zig Zag Ranger District
Leader: Brice Hammack
Location: Wapinitia Pass to Little Crater Lake
Description: Surveying PCT; measuring with a wheel.

Volunteers

Hours
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10
Vetter, Dick 10

Project Total: 40

Project Date: 10/2/2004
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spour to Mount Hood Wilderness Boundary
Description: Logged out 1 tree, cleaned 5 drainage dips and 15 water bars.

Volunteers

Hours
Carter, Patty 10
Konner, Jack 10
O'Neil, Geoff 10

Project Total: 30