Mount Hood Chapter, Pacific Crest Trail Association
Activity Report
1/1/2005 to 12/31/2005 (Generated 2/17/2008)
Activity Summary |
Administration: | 484 |
Meeting: | 676 |
Other: | 50 |
Phone Team: | 5 |
Scouting: | 62 |
Trail Maintenance (PCT): | 3164 |
Training: | 76 |
Total Volunteer Hours: | 4517 |
Activity Detail (most recent on top) |
Project Date: | 11/15/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Other |
Leader: | Brice Hammack |
Location: | Cascade Locks to Road 2000 |
Description: | Optimal Location Review |
Volunteers |
Hours |
Gibson, Bus | 5 |
Hammack, Brice | 25 |
Jones, Larry | 10 |
Martiny, Chuck | 10 |
Project Total: 50 |
Project Date: | 9/30/2005 |
Agency: | N/A |
Activity Type: | Administration |
Leader: | Steve Queen |
Location: | Administration |
Description: | Administrative hours |
Volunteers |
Hours |
Cobb, Roberta | 12 |
Goodwin, Ron | 14 |
Konner, Jack | 300 |
Owen, Kim | 4 |
Owen, Pam | 4 |
Queen, Steve | 150 |
Project Total: 484 |
Project Date: | 9/30/2005 |
Agency: | N/A |
Activity Type: | Register Monitoring |
Leader: | Jack Konner |
Location: | Register Monitoring |
Description: | Register monitoring hours. |
Volunteers |
Hours |
Project Date: | 9/30/2005 |
Agency: | N/A |
Activity Type: | Phone Team |
Leader: | Jack Konner |
Location: | Phone Team |
Description: | Phone team hours. |
Volunteers |
Hours |
Konner, Jack | 5 |
Project Total: 5 |
Project Date: | 9/25/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Barb Adams |
Location: | Indian Springs South |
Description: | Brushed by hand and filled holes for 4 miles. |
Volunteers |
Hours |
Adams, Barb | 11 |
Adams, Dave | 11 |
Eggleston, Connie | 11 |
Eggleston, Mike | 11 |
Matson, Al | 12 |
Mershon, Cynthia | 7 |
Mershon, Jeff | 7 |
Nyberg, Carl | 15 |
Peschke, Bunny | 11 |
White, Hal | 11 |
Wick, Cathy | 14 |
Wick, Kenneth | 14 |
Project Total: 135 |
Project Date: | 9/10/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Steve Queen |
Location: | West Zig Zag Trail |
Description: | Brushed and repaired tread on 1 mile of tread. |
Volunteers |
Hours |
Adams, Barb | 8 |
Carter, Patty | 8 |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Hammack, Brice | 8 |
Hanes, Douglas | 8 |
Hilands, Bill | 8 |
Konner, Jack | 8 |
Lukins, Dick | 8 |
Lum, Richard | 8 |
McLaughlin, Larry | 8 |
Murphy, Des | 8 |
Nyberg, Carl | 11 |
O'Neil, Geoff | 8 |
Pikkola, Dane | 8 |
Queen, Steve | 8 |
Ranganathan, Nandini | 8 |
Sharp, Paul | 8 |
Vhay, John | 8 |
Walker, Richard | 8 |
White, Hal | 8 |
Project Total: 171 |
Project Date: | 9/10/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Kim Owen |
Location: | Ramona Falls Trailhead to Upper Sandy River Crossing |
Description: | Cleaned 10 draindips and repaired 20' of slide damage. Removed rocks for 6 miles of ttrail, rerouted trail around a washout by the Sandy River |
Volunteers |
Hours |
Goldberg, Koda | 11 |
Hater, Pieter | 11 |
Kenyon, Scott | 11 |
Mastiacol, Josh | 11 |
McCauley, Jeremy | 11 |
Owen, Kim | 11 |
Von Pouden, Jonathan | 11 |
Project Total: 77 |
Project Date: | 9/8/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | End of year scouting and cleanup. Removed 1 tree and repaired 5 drainage dips. |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |
Project Date: | 8/24/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | Steve Queen |
Location: | Caretaker Meeting (Kim and Pam Owen's House) |
Description: | August caretaker meeting |
Volunteers |
Hours |
Carter, Patty | 3 |
Cobb, Roberta | 3 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 2 |
Owen, Pam | 2 |
Plant, Steve | 3 |
Queen, Steve | 3 |
Vhay, John | 3 |
Walker, Richard | 3 |
Weston, Ruth | 3 |
Project Total: 34 |
Project Date: | 8/9/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Chuck Martiny |
Location: | Power Line to Rock Pit |
Description: | Logged out 1 tree, cleaned 10 drain dips and brushed all 2 miles. |
Volunteers |
Hours |
Lamb, John | 11 |
Martiny, Chuck | 11 |
Project Total: 22 |
Project Date: | 8/6/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ernie Strahm |
Location: | Jude Lake to Breitenbush Lake (8/6-7) |
Description: | Logged out 6 miles, maintaine 3 miles of tread, repaired 2 drain dips, brushed 3 miles, repaired 1/4 mile of slide, timber reinforcements of slide area (64'). |
Volunteers |
Hours |
Cuerden, Becky | 2 |
Gehring, Dave | 10 |
Gehring, Lance | 10 |
Gehring, Mikah | 10 |
Hardison, Landon | 15 |
Hutchison, Cindy | 10 |
Hutchison, Dewayne | 10 |
Hutchison, Seth | 10 |
Rivera, Carla | 2 |
Rivera, Richard | 2 |
Stoutt, Jeff | 15 |
Strahm, Ernie | 10 |
Strahm, Lori | 10 |
Welliver, Don | 15 |
Project Total: 131 |
Project Date: | 8/5/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Trout Creek |
Description: | Built Trout Creek tributary bridge. |
Volunteers |
Hours |
Daly, Jim | 10 |
Hammack, Brice | 11 |
Linde, Tom | 9 |
Murphy, Des | 11 |
Vetter, Dick | 11 |
Walker, Richard | 11 |
Webb, Jim | 10 |
Zschomler, Arvol | 9 |
Project Total: 82 |
Project Date: | 7/30/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Roberta Cobb |
Location: | Ramona Falls south |
Description: | Logged out 1 tree, cleaned 8 drainage dips, repaired 1 mile of tread. |
Volunteers |
Hours |
Bolton, Gary | 12 |
Brooks, Crystal | 12 |
Brown, Maureen | 12 |
Cobb, Roberta | 12 |
Dalbey, David | 12 |
Gifford, Bill | 10 |
Hilands, Bill | 12 |
Spreadborough, Jake | 12 |
Stevenson, John | 12 |
Vaughn, Stephanie | 12 |
Vhay, John | 12 |
Weston, Ruth | 11 |
Project Total: 141 |
Project Date: | 7/27/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | Steve Queen |
Location: | Caretaker Meeting (Steve Plant's House) |
Description: | July caretaker meeting |
Volunteers |
Hours |
Cobb, Roberta | 3 |
Hammack, Brice | 3 |
Konner, Jack | 3 |
Martiny, Chuck | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 3 |
Owen, Pam | 3 |
Plant, Steve | 2 |
Queen, Steve | 3 |
Vhay, John | 3 |
Walker, Richard | 3 |
Weston, Ruth | 3 |
Project Total: 35 |
Project Date: | 7/27/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Jack Konner |
Location: | Muddy Fork |
Description: | Brushed 100 yards. |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |
Project Date: | 7/23/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Patty Carter |
Location: | Ramona Creek |
Description: | Replaced railing on bridge over Ramona Creek with natural materials. |
Volunteers |
Hours |
Carter, Patty | 8 |
Konner, Jack | 9 |
O'Neil, Geoff | 8 |
Pikkola, Dane | 9 |
Project Total: 34 |
Project Date: | 7/23/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | John Wichman |
Location: | Breitenbush Lake to Park Ridge |
Description: | Trail Maintenance |
Volunteers |
Hours |
Bonitz, Joe | 10 |
Corey, Arden | 10 |
Kitzhaber, Jim | 10 |
Marshall, Ron | 10 |
McCloud, Charles | 10 |
Nichols, Claudia | 10 |
Wichman, John | 10 |
Project Total: 70 |
Project Date: | 7/16/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ernie Strahm |
Location: | Jude Lake to Breitenbush Lake |
Description: | Logged out 3 trees, felled 1 snag, repaired 2 rock water bars and 8 drain dips, brushed 4 miles and maintained 3 miles of tread. |
Volunteers |
Hours |
Gehring, Dave | 8 |
Gehring, Lance | 8 |
Gehring, Mikah | 8 |
Hutchison, Dewayne | 8 |
Peper, David | 8 |
Rivera, Carla | 3 |
Rivera, Richard | 3 |
Stoutt, Jeff | 8 |
Strahm, Ernie | 16 |
Ugrai, Miklos | 16 |
Project Total: 86 |
Project Date: | 7/14/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Trout Creek and Panther Creek to Road 68. |
Description: | Set stringers for Trout Creek tributary bridge. Brushed 4.5 miles from Panther Creek to Road 68. |
Volunteers |
Hours |
Linde, Tom | 8 |
Project Total: 8 |
Project Date: | 7/13/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Trout Creek |
Description: | Work on new Trout Creek tributary bridge. |
Volunteers |
Hours |
Daly, Jim | 8 |
Doty, Pat | 8 |
Hammack, Brice | 8 |
Linde, Tom | 7 |
Murphy, Des | 8 |
Nyberg, Carl | 10 |
Vetter, Dick | 8 |
Walker, Ford | 8 |
Walker, Richard | 8 |
Webb, Jim | 7 |
Zschomler, Arvol | 7 |
Project Total: 87 |
Project Date: | 7/9/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Lower Lake to Fish Lake trails |
Description: | Brushing. |
Volunteers |
Hours |
Howard, Roberta | 9 |
Lister, Norlene | 5 |
Schlitt, Barbara | 5 |
Sischo, Gary | 5 |
Sischo, Peg | 5 |
Turner, Linda | 10 |
Project Total: 39 |
Project Date: | 7/9/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Triangle Lake |
Description: | Replaced rails in horse camp. |
Volunteers |
Hours |
Ellison, Terry | 10 |
Howard, Bill | 10 |
Jones, Billy | 7 |
Jones, Guy | 7 |
Jones, Merlyn | 7 |
Latiolais, Paul | 6 |
Reimers, Wes | 10 |
Project Total: 57 |
Project Date: | 7/9/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Steve Queen |
Location: | Gillette Lake to Greenleaf Creek |
Description: | Brushed 2 miles with a power brush cutter. USFS personel (Andy Walker and Cory Lampee) on site. |
Volunteers |
Hours |
Martiny, Chuck | 8 |
Queen, Steve | 8 |
Project Total: 16 |
Project Date: | 7/9/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Access trail to PCT from Road 4220 - Red Lake Trail |
Description: | Logged out 6 trees from Lodge Pole Trail. Brushed 3 miles of huckleberry. |
Volunteers |
Hours |
Boeckman, Renee | 11 |
Levy, Kathy | 12 |
Whitmyer, Dennis | 7 |
Wolf, Becky | 7 |
Project Total: 37 |
Project Date: | 7/8/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | David Roe |
Location: | Pinhead Buttes to Jude Lake (7/8-9) |
Description: | Logged out 66 trees and the Russ Lake trail #716. |
Volunteers |
Hours |
Roe, David | 22 |
Roe, Eric | 23 |
Sery, Theo | 23 |
Project Total: 68 |
Project Date: | 7/8/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Jude Lake to Lemiti Creek |
Description: | Logged out 15 trees, brushed 10 miles of huckleberries. |
Volunteers |
Hours |
Jones, Billy | 10 |
Jones, Guy | 10 |
Jones, Merlyn | 22 |
Latiolais, Paul | 9 |
Lister, Norlene | 9 |
Schlitt, Barbara | 9 |
Whitmyer, Dennis | 12 |
Project Total: 81 |
Project Date: | 7/8/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Warm Springs River to Pinhead Buttes |
Description: | Logged out 22 trees and cleaned 18 water bars. |
Volunteers |
Hours |
DeVall, Dolores | 10 |
DeVall, Marty | 10 |
Sischo, Gary | 10 |
Sischo, Peg | 10 |
Wolf, Becky | 10 |
Project Total: 50 |
Project Date: | 7/8/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Barb Adams |
Location: | Lolo Pass to Hatfield Wilderness (7/8-9) |
Description: | Logged out 20 trees, cleaned water bars. |
Volunteers |
Hours |
Adams, Barb | 17 |
Adams, Dave | 17 |
Conners, Steve | 13 |
Davidson, Debbi | 13 |
Kenny, Harold | 14 |
Schotz, Lot | 13 |
Schotz, Pam | 13 |
Stice, Debbie | 13 |
Tucker, Deniece | 13 |
Project Total: 126 |
Project Date: | 7/7/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Repaired 2 spring area collection ditches and rebuilt tread. Brushed 100 yards of side hill. Logged out three trees. |
Volunteers |
Hours |
Stein, Bill | 8 |
Vhay, John | 8 |
Project Total: 16 |
Project Date: | 7/2/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Becky Wolf |
Location: | Joe Graham Horse Camp to Warm Springs River (7/2-3) |
Description: | Logged out 31 trees and brushed 3 miles. |
Volunteers |
Hours |
Mecklem, Nancy | 15 |
Mecklem, Tony | 15 |
Project Total: 30 |
Project Date: | 6/29/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Trout Creek |
Description: | Finished design for Trout Creek tributary bridge. Developed materials list and solicited bids on materials. |
Volunteers |
Hours |
Linde, Tom | 6 |
Project Total: 6 |
Project Date: | 6/27/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Trout Creek |
Description: | Project layout for Trout Creek tributary bridge |
Volunteers |
Hours |
Hammack, Brice | 6 |
Linde, Tom | 6 |
Project Total: 12 |
Project Date: | 6/25/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Pam Owen |
Location: | Sandy River (6/25-26) |
Description: | Build equestrian approach to Sandy River. Cleaned 38 drainage dips and 3 water bars. Brushed 100 yards of willow and repaired 20 yard of tread. |
Volunteers |
Hours |
Bowlsby, Brian | 11 |
Carr, Pete | 15 |
Coleman, Liz | 16 |
Feldhaus, Joe | 14 |
Kaai, Robin | 16 |
Owen, Pam | 16 |
Schemm, George | 11 |
Sharp, Paul | 11 |
Snyder, Gail | 11 |
Project Total: 121 |
Project Date: | 6/25/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park (6/25-26) |
Description: | Logged out 5 trees, cleaned 47 drain dips and 6 water bars. Repaired a slide, brushed 30 yards and repaired 100 yards of tread. |
Volunteers |
Hours |
Amrein, Rick | 15 |
Amrein, Rob | 15 |
Forbes, Scot | 15 |
Fuller, Hugh | 15 |
Olson, Rick | 13 |
Owen, Kim | 16 |
Rossi, Philip | 15 |
Streif, Cole | 15 |
Streif, David | 15 |
Tanous, Ed | 15 |
Tanous, Rick | 15 |
Project Total: 164 |
Project Date: | 6/24/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Major tread rebuild at springs. Rebuilt collection trenches. Repaird tread and brushed. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Karlgaard, Karl | 10 |
Pikkola, Dane | 10 |
Sharp, Paul | 10 |
Stevenson, John | 10 |
Vhay, John | 10 |
Project Total: 60 |
Project Date: | 6/22/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | Steve Queen |
Location: | Caretaker Meeting (Roberta Cobb's House) |
Description: | June caretaker meeting |
Volunteers |
Hours |
Carter, Patty | 3 |
Cobb, Roberta | 2 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Konner, Jack | 3 |
Lukins, Dick | 3 |
Martiny, Chuck | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 3 |
Owen, Pam | 3 |
Plant, Steve | 3 |
Queen, Steve | 3 |
Walker, Richard | 3 |
Project Total: 38 |
Project Date: | 6/18/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Patty Carter |
Location: | Top Spurs to Ramona Falls |
Description: | Logged out 10 trees, cleaned out all drainage dips and water bars. |
Volunteers |
Hours |
Artman, Alan | 10 |
Carr, Pete | 11 |
Carter, Patty | 11 |
Fosheim, John | 10 |
Konner, Jack | 11 |
O'Neil, Geoff | 11 |
Pikkola, Dane | 11 |
Project Total: 75 |
Project Date: | 6/15/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Larry McLaughlin |
Location: | Three Corner Rock to Sedum Ridge |
Description: | 13 trees logged out and 2 large snags removed. Built 6 new drainage dips and clened existing ones. Repaired 1 minor slide. Misc brushing of vine maple. Tread repair approaching Sedum Ridge. |
Volunteers |
Hours |
Daly, Jim | 9 |
Doty, Pat | 11 |
Hammack, Brice | 10 |
McLaughlin, Larry | 10 |
Murphy, Des | 10 |
Vetter, Dick | 10 |
Walker, Richard | 10 |
Walker, Robert | 10 |
Webb, Jim | 9 |
Project Total: 89 |
Project Date: | 6/15/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Cairn replaced with 4' 4x4 and more rock at tag #955. Installed 1 new water bar in upper sandy near top #960. Replaced sign post to White River viewpoint. Removed 600' of outside berm. Re-dug ditch at stream crossing. |
Volunteers |
Hours |
Anderson, Doug | 9 |
Arkes, Bob | 8 |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Konner, Jack | 8 |
Lanz, Joel | 8 |
Sharp, Paul | 8 |
Weston, Ruth | 8 |
Project Total: 65 |
Project Date: | 6/11/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | 30 trees logged out, 9 drain dips and 3 water bars repaired, 1 root wad repaired, 300' of rhododendron brushing, 150' of slough removal. |
Volunteers |
Hours |
Arevalo, Christina | 9 |
Conover, Scott | 9 |
Goodwin, Ron | 9 |
Lum, Richard | 9 |
Plant, Steve | 9 |
Roelof, Gerrit | 9 |
Sharp, Paul | 9 |
Spencer, Ken | 9 |
Project Total: 72 |
Project Date: | 6/8/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Chuck Martiny |
Location: | Rock Pit to Carpenters Lake Trail Jct |
Description: | Logged out 5 small trees, repaired drainage dips and water bars, brushed. Tamara Shannon, Andy and 2 summer employee on site. |
Volunteers |
Hours |
Fleischer, Daniel | 15 |
Gibson, Bus | 15 |
Hammack, Brice | 15 |
Martiny, Chuck | 15 |
Murphy, Des | 15 |
Nelson, David | 15 |
Vetter, Dick | 15 |
Project Total: 105 |
Project Date: | 6/4/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Barb Adams |
Location: | Lolo Pass to Huckleberry |
Description: | Logged out 5 trees, repaird drainage dips, a puddle that wasn't draining, brushed 2 miles, repaired various 4' to 10' sections. |
Volunteers |
Hours |
Adams, Barb | 7 |
Adams, Dave | 7 |
Burns, Jim | 7 |
Burns, Julie | 7 |
Kenny, Harold | 7 |
Lesowke, Linda | 6 |
Miller, Jeff | 7 |
Miller, Nancy | 7 |
Owens, Phyllis | 7 |
Peschke, Bunny | 6 |
Sparks, Laura | 7 |
Walz, Jonni | 7 |
Project Total: 82 |
Project Date: | 6/4/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Scouting |
Leader: | Ron Goodwin |
Location: | Scouting (Barlow Pass to Timberline Lodge) |
Description: | Scouting. 10 logs need to be removed, 42 drain dips and water bars to be cleaned, 800' of treadwork needed, 110' of huckleberry brushing needed. 200' of berms to remove. |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |
Project Date: | 5/28/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Patty Carter |
Location: | Top Spur to Lolo Pass |
Description: | Logged out 3 trees, repaired drainage dips and water bars, cut root wad and repaired damage it caused, filled many holes. Ken Kollas of USFS on site. |
Volunteers |
Hours |
Carter, Patty | 11 |
Konner, Jack | 11 |
O'Neil, Geoff | 11 |
Petersen, Steve | 11 |
Stevenson, John | 11 |
Vhay, John | 11 |
Project Total: 66 |
Project Date: | 5/25/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | Steve Queen |
Location: | Caretaker Meeting (Brice Hammack's House) |
Description: | May caretaker meeting |
Volunteers |
Hours |
Cobb, Roberta | 3 |
Hammack, Brice | 2 |
Konner, Jack | 3 |
Lukins, Dick | 3 |
Martiny, Chuck | 3 |
Owen, Pam | 3 |
Queen, Steve | 3 |
Vhay, John | 3 |
Project Total: 23 |
Project Date: | 5/23/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Dick Lukins |
Location: | Fort Rains to Bridge of the Gods |
Description: | Installed 150' turnpike. Edan Lira, Bruce Dungee, Pete and three other USFS personell on site. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Burke, Mike | 9 |
Cather, Robert | 9 |
Coggswell, Don | 9 |
Hugo, Merrill | 9 |
Lukins, Dick | 9 |
Martiny, Chuck | 9 |
Simmons, Laurie | 10 |
Project Total: 74 |
Project Date: | 5/22/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Roberta Cobb |
Location: | Barlow Pass to Palmateer Trail |
Description: | Repaired 44 drainage dips. Removed slough and berm and restored outslope near parking area. Filled holes and removed 5' root from trail. |
Volunteers |
Hours |
Cobb, Roberta | 8 |
Conover, Scott | 8 |
Dalbey, David | 8 |
Guzie, Andy | 8 |
Karlgaard, Karl | 8 |
Pikkola, Dane | 8 |
Stevenson, John | 8 |
Weston, Ruth | 8 |
Project Total: 64 |
Project Date: | 5/21/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Scouting |
Leader: | Kim Owen |
Location: | Scouting (Ramona Falls Jct to Paradise Park Jct) |
Description: | Scouting. Passable to hikers up to Paradise Park Jct. 22" log at 3900' stops horses. |
Volunteers |
Hours |
Owen, Kim | 10 |
Project Total: 10 |
Project Date: | 5/18/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Jim Webb |
Location: | Sedum Ridge to Road 43 |
Description: | Logged out 13 trees, repaired 23 drainage dips and 5 water bars, repaired 2 slides. Brushing and some tread repair. Roger from USFS on site. |
Volunteers |
Hours |
Doty, Pat | 11 |
Hammack, Brice | 11 |
Murphy, Des | 11 |
Vetter, Dick | 11 |
Webb, Jim | 9 |
Zschomler, Arvol | 9 |
Project Total: 62 |
Project Date: | 5/15/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Roberta Cobb |
Location: | Barlow Pass to Frog Lake |
Description: | Logged out 17 trees. |
Volunteers |
Hours |
Brown, Gary | 8 |
Brown, Maureen | 8 |
Cobb, Roberta | 9 |
Towill, Elizabeth | 9 |
Project Total: 34 |
Project Date: | 5/13/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Kim Owen |
Location: | Gillette Lake to Table Mountain |
Description: | Logged out 30 trees and brushed overhanging vine maple. |
Volunteers |
Hours |
Martiny, Chuck | 8 |
Owen, Kim | 8 |
Owen, Pam | 8 |
Project Total: 24 |
Project Date: | 5/10/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Scouting |
Leader: | Jack Konner |
Location: | Scouting (Ramona Creek to Top Spur) |
Description: | Scouting. 8 trees to be logged. Tread repair and bridge repair over Ramona Creek required. |
Volunteers |
Hours |
Konner, Jack | 9 |
Project Total: 9 |
Project Date: | 5/4/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | John Vhay |
Location: | Wahtum Lake north to "switch back cliffs" |
Description: | Logged out 8 trees 14" and smaller. |
Volunteers |
Hours |
Silfies, Dean | 11 |
Vhay, John | 11 |
Project Total: 22 |
Project Date: | 5/3/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Scouting |
Leader: | Jack Konner |
Location: | Scouting (Lolo Pass to Top Spur) |
Description: | Scouting. Root wad and 4 trees need to be removed. Tread repair needed. |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |
Project Date: | 4/30/2005 |
Agency: | Clackamas River Ranger District |
Activity Type: | Training |
Leader: | Steve Queen |
Location: | Chainsaw Certification (Estacada Ranger Station) |
Description: | Five volunteers participated in a chainsaw re-certification course at the Estacada Ranger Station. |
Volunteers |
Hours |
Martiny, Chuck | 6 |
Plant, Steve | 6 |
Strahm, Ernie | 6 |
Webb, Jim | 6 |
Welliver, Don | 6 |
Project Total: 30 |
Project Date: | 4/27/2005 |
Agency: | Zig Zag Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Logged out 14 trees, cleaned 20 drainage dips and 30 water bars. Put rocks into 2 holes in sunken section of trail; holes no in central path. |
Volunteers |
Hours |
Doty, Pat | 11 |
Hammack, Brice | 11 |
McLaughlin, Larry | 11 |
Walker, Ford | 11 |
Walker, Penny | 11 |
Walker, Richard | 11 |
Project Total: 66 |
Project Date: | 4/23/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Training |
Leader: | Steve Queen |
Location: | Chainsaw Certification (Wind River Ranger Station) |
Description: | Six volunteers participated in a chainsaw re-certification course at the Wind River Ranger Station. |
Volunteers |
Hours |
Carter, Patty | 5 |
Cobb, Roberta | 5 |
Goodwin, Ron | 5 |
Konner, Jack | 5 |
Queen, Steve | 5 |
Vhay, John | 5 |
Project Total: 30 |
Project Date: | 4/13/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | Steve Queen |
Location: | Caretaker Meeting (Steve Queen's House) |
Description: | April caretaker meeting |
Volunteers |
Hours |
Carter, Patty | 3 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Konner, Jack | 3 |
Lukins, Dick | 3 |
Martiny, Chuck | 3 |
McLaughlin, Larry | 3 |
Owen, Pam | 3 |
Plant, Steve | 3 |
Queen, Steve | 2 |
Walker, Richard | 3 |
Webb, Jim | 4 |
Project Total: 36 |
Project Date: | 4/9/2005 |
Agency: | N/A |
Activity Type: | Meeting |
Leader: | John Vhay |
Location: | Trail Fest Coordination |
Description: | The Trail Fest committee met 6 times and the Mount Hood chapter presentation committee met 3 times prior to the actual event weekend. Each had various assignments. |
Volunteers |
Hours |
Arkes, Bob | 30 |
Carter, Patty | 20 |
Cobb, Roberta | 30 |
Goodwin, Katie | 40 |
Goodwin, Ron | 40 |
Hammack, Brice | 20 |
Konner, Jack | 50 |
Lukins, Dick | 30 |
Owen, Kim | 24 |
Owen, Pam | 20 |
Queen, Steve | 30 |
Silfies, Dean | 24 |
Simmons, Laurie | 12 |
Vhay, John | 100 |
Wolf, Becky | 40 |
Project Total: 510 |
Project Date: | 4/3/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Chuck Martiny |
Location: | Three Corner Rock |
Description: | Repaired 27 drainage dips, 16 water bars and brushed 3 miles of trail. |
Volunteers |
Hours |
Artman, Alan | 9 |
Bowlsby, Brian | 9 |
Martiny, Chuck | 9 |
Nelson, David | 9 |
Peasch, John | 9 |
Pikkola, Dane | 9 |
Van Pamova, Olga | 9 |
Weston, Ruth | 9 |
Project Total: 72 |
Project Date: | 4/1/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Dick Lukins |
Location: | Fort Rains to Bridge of the Gods |
Description: | Installed 2 culverts with Edan Lira of the USFS. |
Volunteers |
Hours |
Lukins, Dick | 7 |
Project Total: 7 |
Project Date: | 3/30/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ron Goodwin |
Location: | Herman Creek Trail Jct to Wilderness Boundary |
Description: | Widened trail to 24" to 30" and cleaned 12 drainage dips up to last switchback. |
Volunteers |
Hours |
Allen, Eric | 10 |
Arkes, Bob | 10 |
Davidson, Tom | 10 |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Hugo, Merrill | 10 |
Maddox, Ken | 9 |
Nelson, David | 10 |
Smith, Ron | 10 |
Vetter, Dick | 10 |
Project Total: 97 |
Project Date: | 3/24/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Ron Goodwin |
Location: | Cascade Locks to Wilderness Boundary |
Description: | Cleaned 12 drainage dips and 2 water bars to power lines. 100' of brushing and repaired tread power lines to Dry Creek. Repaired 100' of Orocky tread and brushed poison oak north of Dry Cree. |
Volunteers |
Hours |
Goodwin, Katie | 7 |
Goodwin, Ron | 7 |
Project Total: 14 |
Project Date: | 3/23/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Cascade Locks South (1 mile) |
Description: | Logged out 2 34" firs and 2 16" maples. |
Volunteers |
Hours |
Doty, Pat | 5 |
Hammack, Brice | 5 |
Walker, Richard | 5 |
Project Total: 15 |
Project Date: | 3/19/2005 |
Agency: | Columbia River Gorge |
Activity Type: | Scouting |
Leader: | Kim Owen |
Location: | Scouting (Cascade Locks to Wilderness Boundary) |
Description: | Scouted PCT. |
Volunteers |
Hours |
Owen, Kim | 6 |
Owen, Pam | 6 |
Project Total: 12 |
Project Date: | 3/12/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Steve Queen |
Location: | Tamanous Trail Junction North |
Description: | Joint trail maintenance training with WTA. Repaired tread from Tamanous Trail junction to edge of clearcut. |
Volunteers |
Hours |
Konner, Jack | 8 |
Lukins, Dick | 8 |
McLaughlin, Larry | 8 |
Owen, Kim | 8 |
Owen, Pam | 8 |
Queen, Steve | 8 |
Silfies, Dean | 8 |
Vhay, John | 8 |
Project Total: 64 |
Project Date: | 3/9/2005 |
Agency: | Wind River Ranger District |
Activity Type: | Trail Maintenance (PCT) |
Leader: | Brice Hammack |
Location: | Panther Creek to Trout Creek |
Description: | Logged out 4 trees, cleaned drainage dips and water bars, brushed and repaired tread. Was re-certified on chainsaw by Winston Rawl. |
Volunteers |
Hours |
Hammack, Brice | 9 |
McLaughlin, Larry | 9 |
Murphy, Des | 9 |
Walker, Richard | 9 |
Webb, Jim | 8 |
Project Total: 44 |
Project Date: | 3/5/2005 |
Agency: | Hood River Ranger District |
Activity Type: | Scouting |
Leader: | Roberta Cobb |
Location: | Scouting (Frog Lake to Twin Lakes Loop) |
Description: | Scouting. Snow almost gone. Three logs across trail. Tread holding up well. |
Volunteers |
Hours |
Cobb, Roberta | 7 |
Project Total: 7 |
Project Date: | 1/31/2005 |
Agency: | N/A |
Activity Type: | Training |
Leader: | Ron Goodwin |
Location: | CPR Training |
Description: | CPR Training |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |