Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2004 to 9/30/2005

Activity Summary

Other: 40
Scouting: 43
Trail Maintenance (PCT): 1106


Total Volunteer Hours: 1189

Activity Detail (most recent on top)

Project Date: 9/10/2005
District: Zig Zag Ranger District
Leader: Steve Queen
Location: West Zig Zag Trail
Description: Brushed and repaired tread on 1 mile of tread.

Volunteers

Hours
Adams, Barb 8
Carter, Patty 8
Goodwin, Katie 8
Goodwin, Ron 8
Hammack, Brice 8
Hanes, Douglas 8
Hilands, Bill 8
Konner, Jack 8
Lukins, Dick 8
Lum, Richard 8
McLaughlin, Larry 8
Murphy, Des 8
Nyberg, Carl 11
O'Neil, Geoff 8
Pikkola, Dane 8
Queen, Steve 8
Ranganathan, Nandini 8
Sharp, Paul 8
Vhay, John 8
Walker, Richard 8
White, Hal 8

Project Total: 171

Project Date: 9/10/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls Trailhead to Upper Sandy River Crossing
Description: Cleaned 10 draindips and repaired 20' of slide damage. Removed rocks for 6 miles of ttrail, rerouted trail around a washout by the Sandy River

Volunteers

Hours
Goldberg, Koda 11
Hater, Pieter 11
Kenyon, Scott 11
Mastiacol, Josh 11
McCauley, Jeremy 11
Owen, Kim 11
Von Pouden, Jonathan 11

Project Total: 77

Project Date: 9/8/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: End of year scouting and cleanup. Removed 1 tree and repaired 5 drainage dips.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 7/30/2005
District: Zig Zag Ranger District
Leader: Roberta Cobb
Location: Ramona Falls south
Description: Logged out 1 tree, cleaned 8 drainage dips, repaired 1 mile of tread.

Volunteers

Hours
Bolton, Gary 12
Brooks, Crystal 12
Brown, Maureen 12
Cobb, Roberta 12
Dalbey, David 12
Gifford, Bill 10
Hilands, Bill 12
Spreadborough, Jake 12
Stevenson, John 12
Vaughn, Stephanie 12
Vhay, John 12
Weston, Ruth 11

Project Total: 141

Project Date: 7/27/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Muddy Fork
Description: Brushed 100 yards.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 7/23/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Ramona Creek
Description: Replaced railing on bridge over Ramona Creek with natural materials.

Volunteers

Hours
Carter, Patty 8
Konner, Jack 9
O'Neil, Geoff 8
Pikkola, Dane 9

Project Total: 34

Project Date: 6/25/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park (6/25-26)
Description: Logged out 5 trees, cleaned 47 drain dips and 6 water bars. Repaired a slide, brushed 30 yards and repaired 100 yards of tread.

Volunteers

Hours
Amrein, Rick 15
Amrein, Rob 15
Forbes, Scot 15
Fuller, Hugh 15
Olson, Rick 13
Owen, Kim 16
Rossi, Philip 15
Streif, Cole 15
Streif, David 15
Tanous, Ed 15
Tanous, Rick 15

Project Total: 164

Project Date: 6/25/2005
District: Zig Zag Ranger District
Leader: Pam Owen
Location: Sandy River (6/25-26)
Description: Build equestrian approach to Sandy River. Cleaned 38 drainage dips and 3 water bars. Brushed 100 yards of willow and repaired 20 yard of tread.

Volunteers

Hours
Bowlsby, Brian 11
Carr, Pete 15
Coleman, Liz 16
Feldhaus, Joe 14
Kaai, Robin 16
Owen, Pam 16
Schemm, George 11
Sharp, Paul 11
Snyder, Gail 11

Project Total: 121

Project Date: 6/18/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spurs to Ramona Falls
Description: Logged out 10 trees, cleaned out all drainage dips and water bars.

Volunteers

Hours
Artman, Alan 10
Carr, Pete 11
Carter, Patty 11
Fosheim, John 10
Konner, Jack 11
O'Neil, Geoff 11
Pikkola, Dane 11

Project Total: 75

Project Date: 6/15/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Cairn replaced with 4' 4x4 and more rock at tag #955. Installed 1 new water bar in upper sandy near top #960. Replaced sign post to White River viewpoint. Removed 600' of outside berm. Re-dug ditch at stream crossing.

Volunteers

Hours
Anderson, Doug 9
Arkes, Bob 8
Goodwin, Katie 8
Goodwin, Ron 8
Konner, Jack 8
Lanz, Joel 8
Sharp, Paul 8
Weston, Ruth 8

Project Total: 65

Project Date: 6/11/2005
District: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: 30 trees logged out, 9 drain dips and 3 water bars repaired, 1 root wad repaired, 300' of rhododendron brushing, 150' of slough removal.

Volunteers

Hours
Arevalo, Christina 9
Conover, Scott 9
Goodwin, Ron 9
Lum, Richard 9
Plant, Steve 9
Roelof, Gerrit 9
Sharp, Paul 9
Spencer, Ken 9

Project Total: 72

Project Date: 6/4/2005
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Scouting (Barlow Pass to Timberline Lodge)
Description: Scouting. 10 logs need to be removed, 42 drain dips and water bars to be cleaned, 800' of treadwork needed, 110' of huckleberry brushing needed. 200' of berms to remove.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 5/28/2005
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spur to Lolo Pass
Description: Logged out 3 trees, repaired drainage dips and water bars, cut root wad and repaired damage it caused, filled many holes. Ken Kollas of USFS on site.

Volunteers

Hours
Carter, Patty 11
Konner, Jack 11
O'Neil, Geoff 11
Petersen, Steve 11
Stevenson, John 11
Vhay, John 11

Project Total: 66

Project Date: 5/21/2005
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Scouting (Ramona Falls Jct to Paradise Park Jct)
Description: Scouting. Passable to hikers up to Paradise Park Jct. 22" log at 3900' stops horses.

Volunteers

Hours
Owen, Kim 10

Project Total: 10

Project Date: 5/10/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Scouting (Ramona Creek to Top Spur)
Description: Scouting. 8 trees to be logged. Tread repair and bridge repair over Ramona Creek required.

Volunteers

Hours
Konner, Jack 9

Project Total: 9

Project Date: 5/3/2005
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Scouting (Lolo Pass to Top Spur)
Description: Scouting. Root wad and 4 trees need to be removed. Tread repair needed.

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 4/27/2005
District: Zig Zag Ranger District
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Logged out 14 trees, cleaned 20 drainage dips and 30 water bars. Put rocks into 2 holes in sunken section of trail; holes no in central path.

Volunteers

Hours
Doty, Pat 11
Hammack, Brice 11
McLaughlin, Larry 11
Walker, Ford 11
Walker, Penny 11
Walker, Richard 11

Project Total: 66

Project Date: 10/14/2004
District: Zig Zag Ranger District
Leader: Brice Hammack
Location: Wapinitia Pass to Little Crater Lake
Description: Surveying PCT; measuring with a wheel.

Volunteers

Hours
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10
Vetter, Dick 10

Project Total: 40

Project Date: 10/2/2004
District: Zig Zag Ranger District
Leader: Patty Carter
Location: Top Spour to Mount Hood Wilderness Boundary
Description: Logged out 1 tree, cleaned 5 drainage dips and 15 water bars.

Volunteers

Hours
Carter, Patty 10
Konner, Jack 10
O'Neil, Geoff 10

Project Total: 30