Activity Summary

Trail Maintenance (PCT): 539


Total Volunteer Hours: 539

Activity Detail (most recent on top)

Project Date: 9/27/2006
District: Hood River Ranger District
Leader: Barb Adams
Location: Wahtum Lake to Buck Peak
Description: Removed 5 trees and cleaned dozens of drain dips.

Volunteers

Hours
Adams, Barb 12
Adams, Dave 12

Project Total: 24

Project Date: 7/26/2006
District: Hood River Ranger District
Leader: Brice Hammack
Location: Lolo Pass to 5.5 miles north
Description: Cleared 1 tree. Cleaned drainage dips and spot brushing.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10

Project Total: 40

Project Date: 7/2/2006
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass north for one mile
Description: Cleared one tree, claned drain dips, spot brushing.

Volunteers

Hours
Adams, Barb 4
McKinstry, Mindy 5
Peinar, Carol 6
Reed, Marge 6

Project Total: 21

Project Date: 6/26/2006
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass to Hatfield Wilderness boundary
Description: Cleared 28 trees.

Volunteers

Hours
Adams, Barb 36
Adams, Dave 36
Tucker, Deniece 11

Project Total: 83

Project Date: 6/26/2006
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake to Camp Smokey
Description: Cleared 40 trees, repaired 400' side hill sough and 2 root wads, rebuilt 100' of new switch back.

Volunteers

Hours
Arkes, Bob 24
Cather, Robert 27
Logan, Kathy 20
Murray, Michael 27
Smith, Ron 25
Vhay, John 25
Vhay, Tom 25

Project Total: 173

Project Date: 6/17/2006
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Barllow Pass to Frog Lake
Description: Cleared 19 trees and cleaned many drain dips. Repaired tread 1/4 mile thorough; 1 mile spot fixes.

Volunteers

Hours
Allen, Eric 9
Cobb, Roberta 9
Hanes, Douglas 9
Kaai, Robin 11
Matson, Al 9
Merrifield, John 9
Ranganathan, Nandini 9
Weston, Ruth 9
White, Hal 9
Winkler, Dan 9

Project Total: 92

Project Date: 6/10/2006
District: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Cleared 11 logs -- 2 (36"), 4 (20-24") and 5 (<20"). Cleaned wing ditches and trail drains.

Volunteers

Hours
Allen, Eric 9
Arkes, Bob 8
Carr, Pete 10
Doty, Pat 10
Murphy, Des 10
Regehr, Don 10
Silfies, Dean 10
Thompson, Bob 9
Vhay, John 10

Project Total: 86

Project Date: 5/21/2006
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake to beyond Twin Lakes junction
Description: Cleared 26 logs.

Volunteers

Hours
Allen, Eric 10
Cobb, Roberta 10

Project Total: 20