Mount Hood Chapter, Pacific Crest Trail Association
Activity Report
1/1/2006 to 12/31/2006 (Generated 2/17/2008)

Activity Summary

Meeting: 253
Other: 549
Recruiting: 6
Scouting: 54
Trail Maintenance (PCT): 5000
Training: 175


Total Volunteer Hours: 6037

Activity Detail (most recent on top)

Project Date: 12/17/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Eagle Creek Trail
Description: 16 logs removed, 4 slides repaired, 1 large root wad pulled off trail and cleaned bridge and ditches. Prepped for Gabion installation.

Volunteers

Hours
Cobb, Roberta 10
Goodwin, Ron 10
Kirchmiller, Christie 11
Kirchmiller, Robert 11
Merrifield, John 10
Vetter, Dick 10
Weston, Ruth 10

Project Total: 72

Project Date: 12/10/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Steve Queen
Location: Bridge of the Gods to Herman Creek Trail junction
Description: Logged out trees from November rain and wind storms and cleaned drain dips.

Volunteers

Hours
Hammack, Brice 9
Martiny, Chuck 9
McLaughlin, Larry 9
Queen, Steve 9

Project Total: 36

Project Date: 10/25/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Sandy River Trail #770
Description: Seasonal removal and storage of temporary bridge over the Sandy River

Volunteers

Hours
Corwin, Susan 5
Konner, Jack 7
Merrifield, John 7
Nelson, David 7

Project Total: 26

Project Date: 10/19/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: AmeriCorps - Crest Campground to Indian Racetrack
Description: Trail maintenance.

Volunteers

Hours
Doty, Pat 22
Hammack, Brice 22
McLaughlin, Larry 22
Vetter, Dick 22

Project Total: 88

Project Date: 10/13/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: AmeriCorps - Panther Creek
Description: Trail maintenance.

Volunteers

Hours
Bubar, Marc 43
Byrue-Englehorn, Andrew 43
Cloutier, Suzi 35
Coudell, Joyce 13
Earnshaw, Sheri 43
Fallon, Candace 43
Linde, Tom 31
Lopert, Sarah Lee 43
Power, Brad 43
Savires, Bob 42
Taylor, Adam 43
Taylor, George 43

Project Total: 465

Project Date: 10/6/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: AmeriCorps - Table Mountain to Sedum Ridge
Description: Trail maintenance.

Volunteers

Hours
Caris, Joel 42
DeRoberts, Marc 42
Dolan, Jessica 42
Eckrich, Carolyn 42
Hammack, Brice 12
Himelfarb, Eric 22
Webb, Jim 12

Project Total: 214

Project Date: 10/6/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: 2020 Road
Description: Trail maintenance. AmeriCorps related.

Volunteers

Hours
Allen, Eric 8
Hammack, Brice 8

Project Total: 16

Project Date: 9/30/2006
Agency: N/A
Activity Type: Other
Leader: Steve Queen
Location: Administration
Description: Administrative hours

Volunteers

Hours
Cobb, Roberta 29
Goodwin, Ron 22
Konner, Jack 300
Owen, Kim 10
Queen, Steve 150
Strahm, Ernie 9
Walker, Richard 24

Project Total: 544

Project Date: 9/29/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: AmeriCorps - Cigar Lake to Viewpoint
Description: Trail maintenance.

Volunteers

Hours
Froncek, Sylvie 47
Kral, Steve 47
Kukier, Jonathan 18
Strahm, Ernie 47
Vhay, John 36

Project Total: 195

Project Date: 9/28/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Larry McLaughlin
Location: Tanner Creek Trail #401 to Wauna Point
Description: Cleared 26 trees, cleaned drain dips, spot brushing, 50' of tread repair.

Volunteers

Hours
Bakke, Margie 7
Bradshaw, Diane 7
Hawley, Doug 7
Hawley, Sharon 7
Landeen, Stan 7
McLaughlin, Larry 7
Rhodig, Dolores 7
Sock, Greg 7
Taylor, Mel 7
Weiss, Connie 7
Westcott, Sharon 7

Project Total: 77

Project Date: 9/27/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Wahtum Lake to Buck Peak
Description: Removed 5 trees and cleaned dozens of drain dips.

Volunteers

Hours
Adams, Barb 12
Adams, Dave 12

Project Total: 24

Project Date: 9/22/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: AmeriCorps - Breitenbush Lake to viewpoint
Description: Trail maintenance.

Volunteers

Hours
Carr, Pete 47
DeVries, Haley 26
Smith, Craig 25
Turner, Tammy 47

Project Total: 145

Project Date: 9/17/2006
Agency: N/A
Activity Type: Recruiting
Leader: Roberta Cobb
Location: Mount Hood Folk Festival
Description: Booth.

Volunteers

Hours
Cobb, Roberta 6

Project Total: 6

Project Date: 9/15/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: AmeriCorps - Olallie Lake south 3 miles
Description: Trail maintenance.

Volunteers

Hours
De Amico, Matt 25
Defeyter, TJ 35
Hatton, Robert 33
Owen, Kim 33
Owen, Pam 33
Riley, Dave 32
Strahm, Ernie 32

Project Total: 223

Project Date: 9/13/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Steve Queen's House
Description: September Caretaker meeting

Volunteers

Hours
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 3
McLaughlin, Larry 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 2
Walker, Richard 3

Project Total: 26

Project Date: 9/9/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Trout Creek to Sedum Ridge
Description: Trail maintenance. AmeriCorps related.

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 8/31/2006
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Brice Hammack
Location: Crest Camp to Panther Creek
Description: Scouting for AmeriCorps project.

Volunteers

Hours
Hammack, Brice 8
Linde, Tom 7

Project Total: 15

Project Date: 8/12/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag River
Description: Cleaned 12 drain dips and 12 water bars. Repaired 2 slides. Repaired 50' of tread.

Volunteers

Hours
Chelin, Chuck 9
Cobb, Roberta 9
Corwin, Susan 8
Hanes, Douglas 9
Hilands, Bill 9
Lum, Richard 9
Webb, Jim 10
Weston, Ruth 9

Project Total: 72

Project Date: 8/9/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Kim and Pam Owen's house
Description: August Caretaker meeting

Volunteers

Hours
Allen, Eric 3
Cobb, Roberta 3
Corey, Arden 4
Hammack, Brice 3
Konner, Jack 3
Lukins, Dick 3
Marshall, Ron 4
Owen, Kim 3
Owen, Pam 3
Payne, Jim 4
Vhay, John 3
Webb, Jim 3
Weston, Ruth 3
Wichman, John 4

Project Total: 46

Project Date: 8/5/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Arden Corey
Location: Breitnebush Lake to Park Ridge
Description: Removed 6 threes, clared 15 drain dips and 45 water bars. Light brushing and tread repair.

Volunteers

Hours
Corey, Arden 7
Kitzhaber, Jim 7
Marshall, Ron 8
McCloud, Charles 8
Payne, Jim 8
Wichman, John 8

Project Total: 46

Project Date: 7/29/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Timberline Lodge to Paradise Park
Description: Clared 2 trees, cleaned 220 drain dips and 24 water bars. Brush 100 yards and tread repair on one mile of trail.

Volunteers

Hours
Beard, Dennis 22
Bronston, Tassia 22
Carr, Pete 22
De Amico, Matt 22
Feldhaus, Joseph 24
Fong, April Ann 22
Guzie, Andy 22
Kaai, Robin 24
Newcomb, Sam 22
Owen, Emily 9
Owen, Kim 22
Owen, Pam 9
Pikkola, Dane 22
Simons, Joe 22

Project Total: 286

Project Date: 7/26/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Lolo Pass to 5.5 miles north
Description: Cleared 1 tree. Cleaned drainage dips and spot brushing.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10

Project Total: 40

Project Date: 7/21/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: Jude Lake to Mount Jefferson Wilderness Boundary
Description: Cleared 37 trees. Scouted for Fall AmeriCorps projects.

Volunteers

Hours
Cuerden, Becky 18
Davison, Leslie 18
Denker, Cyndy 17
Fisher, Jim 24
Hutchison, Cindy 17
Hutchison, Dewayne 17
Hutchison, Seth 17
Owen, Emily 18
Owen, Kim 18
Owen, Pam 18
Rivera, Carla 11
Rivera, Richard 13
Robertson, Clyde 18
Sheldon, Hal 18
Stoutt, Dixie 13
Stoutt, Jeff 13
Strahm, Ernie 24
Ugrai, Miklos 22

Project Total: 314

Project Date: 7/20/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Timberline Lodge to Paradise Park
Description: Scouting

Volunteers

Hours
Konner, Jack 18

Project Total: 18

Project Date: 7/16/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park Loop
Description: Cleared 5 trees. Filled 2 holes.

Volunteers

Hours
Allen, Eric 9
Bell, Karen 8
Bell, Steve 8
Hogan, Ray 6
Owen, Kim 9
Owen, Pam 9
Weston, Ruth 9

Project Total: 58

Project Date: 7/13/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Cleared 22 trees (5=20"+, 7=12"-20", 10-5"-11"). Cleaned 10 drain dips and 22 water bars. Brushed 800' of huckleberry. Widened 800' to 24" and took off berm. Change temporary sign at Barlow Pass so it is now open for horses.

Volunteers

Hours
Corwin, Susan 9
Fong, April Ann 11
Gibson, Bus 10
Goodwin, Katie 10
Goodwin, Ron 10
Hanes, Douglas 11
McLaughlin, Larry 11
Pikkola, Dane 11
Ranganathan, Nandini 11
Sandefer, Orlene 11
Squires, Bob 9
Vetter, Dick 11
White, Hal 10

Project Total: 135

Project Date: 7/12/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Dick Lukin's house
Description: July Caretaker meeting

Volunteers

Hours
Allen, Eric 3
Goodwin, Ron 3
Hammack, Brice 3
Lukins, Dick 2
Martiny, Chuck 3
McLaughlin, Larry 3
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 3
Vhay, John 3
Weston, Ruth 3

Project Total: 35

Project Date: 7/11/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Ramona Falls to Paradise Park
Description: Brushed 20' of sticker bushes. Scouted for future projects.

Volunteers

Hours
Weston, Ruth 7

Project Total: 7

Project Date: 7/11/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jim Webb
Location: Trout Creek to Sedum Ridge
Description: Log out

Volunteers

Hours
Webb, Jim 5

Project Total: 5

Project Date: 7/10/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jim Webb
Location: Trout Creek to Sedum Ridge
Description: Log out

Volunteers

Hours
Webb, Jim 5
Webb, Paul 5

Project Total: 10

Project Date: 7/9/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Jude Lake to Olallie Lodgepole Trail
Description: General trail maintenance.

Volunteers

Hours
Boeckman, Renee 7
Walsh, Ed 2
Walsh, Pam 2
Whitmyer, Dennis 7

Project Total: 18

Project Date: 7/9/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Steve Plant
Location: Road 58 to Little Crater Lake
Description: Cleared 15 trees.

Volunteers

Hours
Plant, Steve 7
Price, Tracy 7

Project Total: 14

Project Date: 7/8/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Trout Creek north
Description: Cleared 1 tree (18"). Installed new culvert and repaired 40' of tread.

Volunteers

Hours
Linde, Tom 6
Palodieltuk, John 3
Palodieltuk, Wanda 3

Project Total: 12

Project Date: 7/8/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Cleared 29 trees (6" to 3'). Cleaned 12 drain dips and water bars, 100 yards of extensive brushing on ridge. Spot tread repair.

Volunteers

Hours
Carter, Patty 11
Goodwin, Katie 11
Goodwin, Ron 11
Hanes, Douglas 11
Karlgaard, Karl 11
Konner, Jack 11
O'Neil, Geoff 11
Pikkola, Dane 11
Ranganathan, Nandini 11

Project Total: 99

Project Date: 7/7/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Lemiti Butte to Lemiti Meadow
Description: General trail maintenance.

Volunteers

Hours
Boeckman, Renee 17
Levy, Kathy 17
Whitmyer, Dennis 10
Wolf, Becky 9

Project Total: 53

Project Date: 7/7/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Trout Creek north
Description: Cleaned 14 drain dips, brushed and repaired tread on 1.2 miles of trail.

Volunteers

Hours
Linde, Tom 9

Project Total: 9

Project Date: 7/7/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Warm Springs River to Road 42
Description: General trail maintenance

Volunteers

Hours
DeVall, Dolores 11
DeVall, Marty 11
Sischo, Gary 11
Sischo, Peg 11
Wolf, Becky 12

Project Total: 56

Project Date: 7/7/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Jude Lake South
Description: General trail maintenance

Volunteers

Hours
Howard, Bill 15
Howard, Roberta 15
Jones, Billy 15
Jones, Guy 15
Jones, Merlyn 24
Latiolais, Paul 8
Lister, Norlene 15
Schlitt, Barbara 15
Turnacliff, Angie 8
Turner, Linda 8
Walsh, Ed 12
Walsh, Pam 12

Project Total: 162

Project Date: 7/2/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge ot Pardise Park
Description: Cleared 10 trees, cleaned around trees that must be removed in a future project, scouted for future projects.

Volunteers

Hours
Weston, Ruth 8

Project Total: 8

Project Date: 7/2/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass north for one mile
Description: Cleared one tree, claned drain dips, spot brushing.

Volunteers

Hours
Adams, Barb 4
McKinstry, Mindy 5
Peinar, Carol 6
Reed, Marge 6

Project Total: 21

Project Date: 7/1/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: David Roe
Location: Pinhead Buttes to Warm Springs River
Description: Removed 84 trees.

Volunteers

Hours
Roe, David 22
Roe, Eric 26

Project Total: 48

Project Date: 7/1/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Ramona Falls Loop
Description: Cleared 46 trees (0.5' to 2.5'). Cleaned 5 draindips and 12 water bars, brushed 100 yards and spot tread repair.

Volunteers

Hours
Carter, Patty 13
Conover, Scott 14
Corwin, Susan 10
Goodwin, Katie 11
Goodwin, Ron 11
Hovin, Leif 13
Konner, Jack 13
O'Neil, Geoff 13
Stevenson, John 13
Vhay, John 13
Weston, Ruth 13

Project Total: 137

Project Date: 6/29/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Crest Camp to Carpenters Lake Trail Junction
Description: Scouting

Volunteers

Hours
Hammack, Brice 21

Project Total: 21

Project Date: 6/27/2006
Agency: Mount Adams Ranger District
Activity Type: Training
Leader: Steve Queen
Location: Crosscut Training at Wind River Training Center
Description: 2 volunteers participated in crosscut training.

Volunteers

Hours
Allen, Eric 19
Cobb, Roberta 10
Owen, Kim 19

Project Total: 48

Project Date: 6/26/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass to Hatfield Wilderness boundary
Description: Cleared 28 trees.

Volunteers

Hours
Adams, Barb 36
Adams, Dave 36
Tucker, Deniece 11

Project Total: 83

Project Date: 6/26/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: John Vhay
Location: Wahtum Lake to Camp Smokey
Description: Cleared 40 trees, repaired 400' side hill sough and 2 root wads, rebuilt 100' of new switch back.

Volunteers

Hours
Arkes, Bob 24
Cather, Robert 27
Logan, Kathy 20
Murray, Michael 27
Smith, Ron 25
Vhay, John 25
Vhay, Tom 25

Project Total: 173

Project Date: 6/25/2006
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Joe Graham Horse Camp to Power Lines
Description: Cleared trees.

Volunteers

Hours
Adams, Barb 9
Adams, Dave 9
Kenny, Harold 9
Law, Shirley 9
Tucker, Deniece 9

Project Total: 45

Project Date: 6/24/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Steve Plant
Location: Wapinitia Pass to Road 58
Description: Cleared 30 trees, cleaned drain dips and water bars, brushed.

Volunteers

Hours
Beard, Dennis 10
Chelin, Chuck 10
Lee, Jason 10
Niece, Barbara 10
Niece, Ron 10
Plant, Steve 10
Stevenson, John 10

Project Total: 70

Project Date: 6/24/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Falls to Sandy River
Description: Built approach and for for horses across Sandy River. Cleaned 3 drain dips and 2 water bars. Brushed pin and willows, repaired 150' of tread.

Volunteers

Hours
Amrein, Rick 13
Banta, Chris 10
Brouhard, Mike 13
Owen, Kim 18
Owen, Pam 16
Shearer, Paul 14
Shearer, Riley 10
Streif, Cole 13
Streif, David 13
Thompson, Austin 10
Thompson, Jimmy 10
Thompson, Peggy 14
Thompson, Robb 14
Wrenn, Andrew 10
Wrenn, Jim 14

Project Total: 192

Project Date: 6/22/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Cleared three trees, cleared 2 water bars, swamping branches from trail, scouting for future work project.

Volunteers

Hours
Dorow, Janet 9
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 27

Project Date: 6/21/2006
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Jack Konner
Location: Lolo Pass to Top Spur
Description: Scouting

Volunteers

Hours
Konner, Jack 10

Project Total: 10

Project Date: 6/17/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Barllow Pass to Frog Lake
Description: Cleared 19 trees and cleaned many drain dips. Repaired tread 1/4 mile thorough; 1 mile spot fixes.

Volunteers

Hours
Allen, Eric 9
Cobb, Roberta 9
Hanes, Douglas 9
Kaai, Robin 11
Matson, Al 9
Merrifield, John 9
Ranganathan, Nandini 9
Weston, Ruth 9
White, Hal 9
Winkler, Dan 9

Project Total: 92

Project Date: 6/16/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Chuck Martiny
Location: Three Corner Rock to Carpenters Lake Trail Junction
Description: Cleaned water bars, repaired one slide, brushed 2 miles, tread repair on lower section

Volunteers

Hours
Allen, Eric 11
Hammack, Brice 11
Maddox, Ken 11
Martiny, Chuck 11
McKinstry, Mindy 11
McLaughlin, Larry 11
Murray, Michael 14
Nyberg, Carl 11
Vetter, Dick 11
Webb, Jim 8

Project Total: 110

Project Date: 6/14/2006
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Jack Konner
Location: Ramona Falls to Top Spur
Description: Scouting

Volunteers

Hours
Konner, Jack 11

Project Total: 11

Project Date: 6/14/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Richard Walker
Location: Little Crater L:ake to Joe Graham Horse Camp
Description: Cleared 18 trees, cleaned 20 drain dips and 40 water bars and brushed 1.5 miles.

Volunteers

Hours
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10
Vetter, Dick 10
Walker, Penny 10
Walker, Richard 10

Project Total: 60

Project Date: 6/14/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Larry McLaughlin's house
Description: June Caretaker meeting

Volunteers

Hours
Adams, Barb 3
Allen, Eric 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 3
Martiny, Chuck 3
McLaughlin, Larry 2
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 3
Vetter, Dick 3
Vhay, John 3
Walker, Richard 3
Weston, Ruth 3

Project Total: 47

Project Date: 6/13/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Road 6808 to Panther Creek
Description: Cleared 2 trees, repaired root wad damage.

Volunteers

Hours
Johnson, Gary 7
Linde, Tom 9

Project Total: 16

Project Date: 6/11/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Trailhead to Paradise Park
Description: Cleared 6 trees and 30' of wing ditches. Scouting for future projects.

Volunteers

Hours
Owen, Kim 11
Owen, Pam 11

Project Total: 22

Project Date: 6/10/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: John Vhay
Location: Wahtum Lake
Description: Cleared 11 logs -- 2 (36"), 4 (20-24") and 5 (<20"). Cleaned wing ditches and trail drains.

Volunteers

Hours
Allen, Eric 9
Arkes, Bob 8
Carr, Pete 10
Doty, Pat 10
Murphy, Des 10
Regehr, Don 10
Silfies, Dean 10
Thompson, Bob 9
Vhay, John 10

Project Total: 86

Project Date: 6/9/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Dick Lukins
Location: Bridge of the Gods to Fort Rains
Description: Cleaned 2 drain dips, brushed 3/4 mile, extensive drainage work on 2 springs.

Volunteers

Hours
Lukins, Dick 8
Maddox, Ken 6
Martiny, Chuck 8
Murray, Michael 8
Nyberg, Carl 12
Squires, Bob 6

Project Total: 48

Project Date: 6/7/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Larry McLaughlin
Location: Road 2090 to Three Corner Rock
Description: Cleared 8 trees, cleaned out many drain dips, brshed a 300' stretch south of Three Corner Rock, misc. tread repair.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
McLaughlin, Larry 10
Murphy, Des 10

Project Total: 40

Project Date: 6/2/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Chuck Martiny
Location: Gravel Pit to Carpenters Lake Trail Junction
Description: Cleared 22 trees, scouting for future projects

Volunteers

Hours
Lukins, Dick 5
Martiny, Chuck 11
Martiny, Karen 11

Project Total: 27

Project Date: 6/1/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Larry McLaughlin
Location: Road 2070 to Road 2090
Description: Cleared a few trees, cleaned drain dips and a little brushing.

Volunteers

Hours
McLaughlin, Larry 10

Project Total: 10

Project Date: 5/24/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Larry McLaughlin
Location: Road 2070 to Sedum Trail Junction
Description: Cleared 26 trees, repaired 80 drain dips, 10 water bars, 2 slides, 3 root wads, brushing on 4 miles, short bits of tread repair.

Volunteers

Hours
Allen, Eric 12
Doty, Pat 12
Hammack, Brice 12
McLaughlin, Larry 12
Vetter, Dick 12
Webb, Jim 12

Project Total: 72

Project Date: 5/21/2006
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Frog Lake to beyond Twin Lakes junction
Description: Cleared 26 logs.

Volunteers

Hours
Allen, Eric 10
Cobb, Roberta 10

Project Total: 20

Project Date: 5/21/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Trout Creek north
Description: Logged out three threes, repaired 10' of tread.

Volunteers

Hours
Johnson, Gary 4
Linde, Tom 4

Project Total: 8

Project Date: 5/15/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jim Webb
Location: Trout Creek to Sedum Ridge
Description: Log out

Volunteers

Hours
Mooney, John 7
Webb, Jim 7

Project Total: 14

Project Date: 5/13/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Moffit Creek on Trail 400
Description: Logged out one tree, repaired 2 slides, removed one root wad, repaired and 18' and an 8' section of tread. On the 8' section culverts removed and new culverts installed and tread replaced, cur logs placed, top gravel installed. On the 18' section the large culvert removed. Two Gabions were placed and filled with rock and closed. Ran out of time to complete with cur logs and top gravel.

Volunteers

Hours
Cobb, Roberta 9
Gibson, Bus 9
Merrifield, John 9
Vetter, Dick 9
Vhay, John 9
Winkler, Dan 9

Project Total: 54

Project Date: 5/12/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Jack Konner's house
Description: Caretaker meeting

Volunteers

Hours
Allen, Eric 3
Carter, Patty 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 2
Lukins, Dick 3
Martiny, Chuck 3
McLaughlin, Larry 3
Plant, Steve 3
Queen, Steve 3
Weston, Ruth 3

Project Total: 35

Project Date: 5/11/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Dick Lukins
Location: Bridge of the Gods to Fort Rains
Description: Scouting. 5 trees hanging over trail. Cleaned on drain.

Volunteers

Hours
Lukins, Dick 4

Project Total: 4

Project Date: 5/6/2006
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Middle Salmon River Trail #742
Description: Cleared 30 trees (7 chainsaw, 23 cross cut), cleaned 10 water bars, repaired one slide, filled 2 holes and repiared 10 yards of tread.

Volunteers

Hours
Allen, Eric 10
Carter, Patty 10
Chelin, Chuck 8
Fosheim, John 9
Konner, Jack 10
Nyberg, Carl 12
O'Neil, Geoff 10
Reimers, Wes 9
Smith, Ron 10

Project Total: 88

Project Date: 4/29/2006
Agency: Clackamas River Ranger District
Activity Type: Training
Leader: Steve Queen
Location: Chainsaw Certification (Estacada Ranger Station)
Description: 2 volunteers participated in a chainsaw re-certification course at the Estacada Ranger Station.

Volunteers

Hours
Plant, Steve 6
Weston, Ruth 6

Project Total: 12

Project Date: 4/26/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jim Webb
Location: Trout Creek to Sedum Ridge
Description: Drainage and rock work.

Volunteers

Hours
Webb, Jim 7

Project Total: 7

Project Date: 4/22/2006
Agency: N/A
Activity Type: Training
Leader: Steve Queen
Location: North Bend, WA
Description: WTA Crew Leader training

Volunteers

Hours
Owen, Kim 22
Weston, Ruth 22

Project Total: 44

Project Date: 4/15/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Steve Queen
Location: Carpenters Lake trail junction to Fort Rains
Description: Logged out 20 trees. Cleaned drainage dips and widened 500' of tread. Cleaned foot bridges.

Volunteers

Hours
Arkes, Bob 10
Carpenter, Roger 10
Chelin, Chuck 10
Conover, Scott 10
Queen, Steve 10
Thompson, Bob 10
Vetter, Dick 10
Warner, Sam 10

Project Total: 80

Project Date: 4/12/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Brice Hammack's house
Description: April Caretaker Meeting

Volunteers

Hours
Allen, Eric 3
Carter, Patty 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 2
Konner, Jack 3
Lukins, Dick 3
McLaughlin, Larry 3
Queen, Steve 3
Walker, Richard 3
Weston, Ruth 3

Project Total: 32

Project Date: 4/8/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Steve Queen
Location: Bridge of the Gods to Hatfield Wilderness Boundary
Description: Logged out 27 trees. Cleaned drainage between Bridge of the Gods and power lines Widened 1500' of tread. Cleaned Dry Creek bridge.

Volunteers

Hours
Allen, Eric 10
Beard, Dennis 10
Chelin, Chuck 10
Coggswell, Don 10
Dolinar, Brian 10
Goodwin, Ron 10
Owen, Kim 10
Queen, Steve 10
Sheets, Ken 10
Sheets, Tami 10
Smith, Ron 10
Weston, Ruth 10

Project Total: 120

Project Date: 4/5/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Panther Creek to Trout Creek
Description: Removed 18 trees. Cleaned drain dips and water bars. Light brushing and tread repai.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
Jones, Larry 9
Mooney, John 10
Murphy, Des 10
Vetter, Dick 10

Project Total: 59

Project Date: 4/5/2006
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Tom Linde
Location: Wind River crossing
Description: Bridge site visit and design ofr replacmeent. Getting estimates for materials. Picking up supplies for bridge. Turnpike visit and design for repairs and getting estimates.

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 3/29/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Trout Creek
Description: Removed rotted bridge.

Volunteers

Hours
Doty, Pat 7
Gibson, Bus 7
Hammack, Brice 7
Vetter, Dick 7

Project Total: 28

Project Date: 3/23/2006
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Jim Webb
Location: Trout Creek to Sedum Ridge
Description: Scouting

Volunteers

Hours
Webb, Jim 7

Project Total: 7

Project Date: 3/22/2006
Agency: N/A
Activity Type: Other
Leader: Brice Hammack
Location: Roberta Cobb's garage
Description: Sharpened tools

Volunteers

Hours
Hammack, Brice 5

Project Total: 5

Project Date: 3/18/2006
Agency: Mount Adams Ranger District
Activity Type: Training
Leader: Steve Queen
Location: Chainsaw Certification (Wind River Ranger Station)
Description: 12 volunteers participated in a chainsaw re-certification course at the Wind River Ranger Station.

Volunteers

Hours
Carter, Patty 6
Cobb, Roberta 6
Doty, Pat 6
Goodwin, Ron 6
Hammack, Brice 6
Konner, Jack 6
Latiolais, Paul 6
Linde, Tom 5
Martiny, Chuck 6
McLaughlin, Larry 6
Queen, Steve 6
Vhay, John 6

Project Total: 71

Project Date: 3/8/2006
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Steve Queen's house
Description: March Caretaker meeting. Garry Hanley, AmeriCorps in attendance.

Volunteers

Hours
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 3
Lukins, Dick 3
McLaughlin, Larry 3
Owen, Kim 3
Owen, Pam 3
Queen, Steve 2
Walker, Richard 3
Weston, Ruth 3

Project Total: 32

Project Date: 2/27/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Wind River Bridge
Description: Logged on a 44" cottonwood.

Volunteers

Hours
Hutton, Warren 3
Linde, Tom 3

Project Total: 6

Project Date: 2/16/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Road 6800020 North
Description: Brushing limbs off trail.

Volunteers

Hours
Linde, Tom 7

Project Total: 7

Project Date: 2/11/2006
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Eagle Creek Trail
Description: Removed 2 logs. Repaired mud slide. Cleaned ditches and bridge. Built rock wall to restore eroded culvert. Filled low spots with gravel.

Volunteers

Hours
Beard, Dennis 8
Chelin, Chuck 6
Cobb, Roberta 8
Coggswell, Don 8
Corcoran, Corky 8
Dolinar, Brian 8
Goodwin, Ron 8
Haugan, Brian 8
Martiny, Chuck 8
Matson, Al 8
Warner, Sam 8
Winkler, Dan 8

Project Total: 94

Project Date: 1/6/2006
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Panther Creek area
Description: Cleared trail of moveable blow down and limbs. Repaired 2 drainage problems and fixed bridge approach.

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 1/1/2006
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Tom Linde
Location: Wind River Bridge to Panther Creek
Description: Evaluated repair needs of Wind River bridge decking. Scout 4 miles north of Panther Creek.

Volunteers

Hours
Linde, Tom 3

Project Total: 3