Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2006 to 9/30/2007
Activity Summary |
Scouting: | 63 |
Trail Maintenance (Other): | 215 |
Trail Maintenance (PCT): | 1043 |
Total Volunteer Hours: | 1321 |
Activity Detail (most recent on top) |
Project Date: | 9/22/2007 |
District: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag Canyon |
Description: | Cleaned 24 drain dips and 6 water bars. Repaired 800' of tread. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Arkes, Jane | 10 |
Cobb, Roberta | 10 |
Fong, April Ann | 10 |
Hanes, Douglas | 10 |
Lameka, Ann | 10 |
Ranganathan, Nandini | 10 |
Vhay, John | 10 |
Weston, Ruth | 10 |
Project Total: 90 |
Project Date: | 9/8/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Pioneer Bridle Trail |
Description: | Transported dirt and rocks to raise level of tread. |
Volunteers |
Hours |
Bartos, Heather | 7 |
Bartos, Jim | 7 |
Carter, Patty | 7 |
Cobb, Roberta | 7 |
Goodwin, Ron | 7 |
Hammack, Brice | 7 |
Hanes, Douglas | 7 |
Karlgaard, Karl | 7 |
Konner, Jack | 7 |
O'Neil, Geoff | 7 |
Queen, Steve | 7 |
Ranganathan, Nandini | 7 |
Weston, Ruth | 7 |
Project Total: 91 |
Project Date: | 9/1/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Timberline Lodge to Ramona Falls |
Description: | Cleaned 73 drain dips and 12 water bars. |
Volunteers |
Hours |
Owen, Emily | 20 |
Owen, Kim | 20 |
Owen, Pam | 20 |
Project Total: 60 |
Project Date: | 7/29/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River |
Description: | Posted signs on ne PCT reroute. Guided in volunteers to worksite. Carried in 40 pounds of food to resupply AmeriCorps crew. |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 7/26/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River |
Description: | Removed 16 trees (5: 12"; 5: 6"). Surveyed root wad project and Sandy River rebuild. Provided food drop to AmeriCorps crew. |
Volunteers |
Hours |
Owen, Kim | 15 |
Owen, Pam | 15 |
Project Total: 30 |
Project Date: | 7/24/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Sandy River and Muddy Fork |
Description: | Worked with AmeriCorps crew doing 2 reroutes in Sandy River area. |
Volunteers |
Hours |
Konner, Jack | 24 |
Project Total: 24 |
Project Date: | 7/21/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Muddy Fork |
Description: | Removed 30 trees (6" to 28"). Cleaned 12 drain dips and 15 water bars. Filled holes in tread. |
Volunteers |
Hours |
Barberis, Joe | 13 |
Bartos, Heather | 13 |
Bartos, Jim | 13 |
Carter, Patty | 13 |
Goodwin, Ron | 13 |
Konner, Jack | 13 |
Lum, Richard | 13 |
O'Neil, Geoff | 13 |
Project Total: 104 |
Project Date: | 7/18/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls area |
Description: | Project survey for PCT re-route near Sandy River with Sara Hanson, PCTA Trail Technical Advisior. |
Volunteers |
Hours |
Owen, Kim | 12 |
Project Total: 12 |
Project Date: | 7/16/2007 |
District: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Paradise Park trail junction |
Description: | Cleaned 15 drain dips. Repaired a 12' slide in Roaring River Canyon. Brushed 800' in Zig Zag Canyon. |
Volunteers |
Hours |
Meador, Corey | 11 |
Weston, Ruth | 11 |
Project Total: 22 |
Project Date: | 7/7/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Paradise Park Trail Junction |
Description: | Cleared 60 trees. Brushed 100 yards, pole sawing, repaired washout. |
Volunteers |
Hours |
Cobb, Roberta | 22 |
Coleman, Liz | 24 |
Guzie, Andy | 22 |
Kirchmiller, Christie | 22 |
Kirchmiller, Robert | 22 |
McFeely, Brian | 22 |
Owen, Kim | 22 |
Owen, Pam | 22 |
Panter, Henry | 23 |
Riley, Dave | 22 |
Tausch, Warren | 22 |
Project Total: 245 |
Project Date: | 6/30/2007 |
District: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Removed 51 trees (14: 4"-7", 22: 8"-13", 12: 14"-20", 3: 21"+). Repaired 15 drain dips and 45 water bars. Brushed 400' huckleberry and vine maple, Repaired 38' of tread. Rebuild 2 cairns and placed 2 4"x4"x4' posts in them.Swept with garden rake 3 miles of trail to remove branches. |
Volunteers |
Hours |
Alway, Tom | 10 |
Gabriel, Michael | 10 |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Hanes, Douglas | 10 |
Irwin, Mark | 10 |
Kellogg, Liz | 10 |
Martiny, Chuck | 10 |
Pronger, Kamra | 10 |
Ranganathan, Nandini | 10 |
Settlemeyer, Lois | 10 |
Walker, Richard | 10 |
Zazilha, Magdalena | 10 |
Project Total: 128 |
Project Date: | 6/30/2007 |
District: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Paradise Park Loop |
Description: | Removed 12 trees (6" to 24"). Cleaned 24 drain dips and 2 water bars. Filled 5 holes. |
Volunteers |
Hours |
Corwin, Susan | 9 |
Schomburg, Dan | 18 |
Traeger, Jennifer | 18 |
Van Gundy, Jackie | 18 |
Weston, Ruth | 18 |
Project Total: 81 |
Project Date: | 6/14/2007 |
District: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Removed 5 trees (3" to 4"). Cleaned 4 drain dips. Brushed 25' of trails. Repaired 20' of tread. Raked 100' of branches. Trimmed branches off 20 trees to open corridor. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Project Total: 18 |
Project Date: | 6/12/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Ramona Falls |
Description: | Scouting. |
Volunteers |
Hours |
Konner, Jack | 16 |
Owen, Kim | 16 |
Project Total: 32 |
Project Date: | 6/9/2007 |
District: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | Removed 30 trees, repaired 7 drain dips, 3 water bars and 2 root wads. General brushing. |
Volunteers |
Hours |
Creelman, Kevin | 12 |
Luyan, Melissa | 12 |
Marcus, Gerrett | 12 |
Peterson, John | 12 |
Plant, Steve | 12 |
Price, Tracy | 12 |
Project Total: 72 |
Project Date: | 6/4/2007 |
District: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Little Zig Zag Canyon |
Description: | Scouting |
Volunteers |
Hours |
Weston, Ruth | 4 |
Project Total: 4 |
Project Date: | 5/30/2007 |
District: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Removed 41 trees. Repaired drain dips and water bars. Brushed. |
Volunteers |
Hours |
Hammack, Brice | 9 |
McLaughlin, Larry | 9 |
Murphy, Des | 9 |
Vetter, Dick | 9 |
Walker, Ford | 12 |
Walker, Penny | 12 |
Walker, Richard | 20 |
Project Total: 80 |
Project Date: | 5/16/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls area |
Description: | Removed 6 logs. Repaired 1 root wad. Scouting for future project. |
Volunteers |
Hours |
Owen, Kim | 13 |
Project Total: 13 |
Project Date: | 4/13/2007 |
District: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls feeder and PCT |
Description: | Assessed winter damage. |
Volunteers |
Hours |
Nelson, David | 10 |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 30 |
Project Date: | 4/11/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Trail #19 |
Description: | Removed 6 trees (1' to 2'). Repaird 20 yards of tread. |
Volunteers |
Hours |
Corwin, Susan | 7 |
Konner, Jack | 5 |
Project Total: 12 |
Project Date: | 3/25/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Old Salmon River Trail |
Description: | Removed 14 trees and 2 rood wads. Repaired 100' of tread. Repaired 5 drain dips. Repaired bridge approaches and stairs. Cleared mud and rocks over and under bridge. Blocked off unused trail. Removed debris. Removed fire ring. Improved stream crossing. |
Volunteers |
Hours |
Carr, Pete | 11 |
Carter, Patty | 11 |
Corwin, Susan | 9 |
Gifford, Bill | 10 |
Konner, Jack | 12 |
O'Neil, Geoff | 11 |
Roe, David | 10 |
Stevenson, John | 11 |
Turner, Tammy | 11 |
Wankowicz, Bex | 9 |
Project Total: 105 |
Project Date: | 3/21/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Old Salmon River Trail |
Description: | Measured risers and analyzed stair structure for repair to be done on 3/25/07 |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 3/7/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Old Salmon River Trail |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 8 |
Project Total: 8 |
Project Date: | 3/6/2007 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Old Salmon River Trail |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 10/25/2006 |
District: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Sandy River Trail #770 |
Description: | Seasonal removal and storage of temporary bridge over the Sandy River |
Volunteers |
Hours |
Corwin, Susan | 5 |
Konner, Jack | 7 |
Merrifield, John | 7 |
Nelson, David | 7 |
Project Total: 26 |