Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2006 to 9/30/2007

Activity Summary

Scouting: 63
Trail Maintenance (Other): 215
Trail Maintenance (PCT): 1043


Total Volunteer Hours: 1321

Activity Detail (most recent on top)

Project Date: 9/22/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag Canyon
Description: Cleaned 24 drain dips and 6 water bars. Repaired 800' of tread.

Volunteers

Hours
Arkes, Bob 10
Arkes, Jane 10
Cobb, Roberta 10
Fong, April Ann 10
Hanes, Douglas 10
Lameka, Ann 10
Ranganathan, Nandini 10
Vhay, John 10
Weston, Ruth 10

Project Total: 90

Project Date: 9/8/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Pioneer Bridle Trail
Description: Transported dirt and rocks to raise level of tread.

Volunteers

Hours
Bartos, Heather 7
Bartos, Jim 7
Carter, Patty 7
Cobb, Roberta 7
Goodwin, Ron 7
Hammack, Brice 7
Hanes, Douglas 7
Karlgaard, Karl 7
Konner, Jack 7
O'Neil, Geoff 7
Queen, Steve 7
Ranganathan, Nandini 7
Weston, Ruth 7

Project Total: 91

Project Date: 9/1/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Timberline Lodge to Ramona Falls
Description: Cleaned 73 drain dips and 12 water bars.

Volunteers

Hours
Owen, Emily 20
Owen, Kim 20
Owen, Pam 20

Project Total: 60

Project Date: 7/29/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River
Description: Posted signs on ne PCT reroute. Guided in volunteers to worksite. Carried in 40 pounds of food to resupply AmeriCorps crew.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 7/26/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River
Description: Removed 16 trees (5: 12"; 5: 6"). Surveyed root wad project and Sandy River rebuild. Provided food drop to AmeriCorps crew.

Volunteers

Hours
Owen, Kim 15
Owen, Pam 15

Project Total: 30

Project Date: 7/24/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Sandy River and Muddy Fork
Description: Worked with AmeriCorps crew doing 2 reroutes in Sandy River area.

Volunteers

Hours
Konner, Jack 24

Project Total: 24

Project Date: 7/21/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Muddy Fork
Description: Removed 30 trees (6" to 28"). Cleaned 12 drain dips and 15 water bars. Filled holes in tread.

Volunteers

Hours
Barberis, Joe 13
Bartos, Heather 13
Bartos, Jim 13
Carter, Patty 13
Goodwin, Ron 13
Konner, Jack 13
Lum, Richard 13
O'Neil, Geoff 13

Project Total: 104

Project Date: 7/18/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls area
Description: Project survey for PCT re-route near Sandy River with Sara Hanson, PCTA Trail Technical Advisior.

Volunteers

Hours
Owen, Kim 12

Project Total: 12

Project Date: 7/16/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park trail junction
Description: Cleaned 15 drain dips. Repaired a 12' slide in Roaring River Canyon. Brushed 800' in Zig Zag Canyon.

Volunteers

Hours
Meador, Corey 11
Weston, Ruth 11

Project Total: 22

Project Date: 7/7/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park Trail Junction
Description: Cleared 60 trees. Brushed 100 yards, pole sawing, repaired washout.

Volunteers

Hours
Cobb, Roberta 22
Coleman, Liz 24
Guzie, Andy 22
Kirchmiller, Christie 22
Kirchmiller, Robert 22
McFeely, Brian 22
Owen, Kim 22
Owen, Pam 22
Panter, Henry 23
Riley, Dave 22
Tausch, Warren 22

Project Total: 245

Project Date: 6/30/2007
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Removed 51 trees (14: 4"-7", 22: 8"-13", 12: 14"-20", 3: 21"+). Repaired 15 drain dips and 45 water bars. Brushed 400' huckleberry and vine maple, Repaired 38' of tread. Rebuild 2 cairns and placed 2 4"x4"x4' posts in them.Swept with garden rake 3 miles of trail to remove branches.

Volunteers

Hours
Alway, Tom 10
Gabriel, Michael 10
Goodwin, Katie 9
Goodwin, Ron 9
Hanes, Douglas 10
Irwin, Mark 10
Kellogg, Liz 10
Martiny, Chuck 10
Pronger, Kamra 10
Ranganathan, Nandini 10
Settlemeyer, Lois 10
Walker, Richard 10
Zazilha, Magdalena 10

Project Total: 128

Project Date: 6/30/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park Loop
Description: Removed 12 trees (6" to 24"). Cleaned 24 drain dips and 2 water bars. Filled 5 holes.

Volunteers

Hours
Corwin, Susan 9
Schomburg, Dan 18
Traeger, Jennifer 18
Van Gundy, Jackie 18
Weston, Ruth 18

Project Total: 81

Project Date: 6/14/2007
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Removed 5 trees (3" to 4"). Cleaned 4 drain dips. Brushed 25' of trails. Repaired 20' of tread. Raked 100' of branches. Trimmed branches off 20 trees to open corridor.

Volunteers

Hours
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 18

Project Date: 6/12/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls
Description: Scouting.

Volunteers

Hours
Konner, Jack 16
Owen, Kim 16

Project Total: 32

Project Date: 6/9/2007
District: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: Removed 30 trees, repaired 7 drain dips, 3 water bars and 2 root wads. General brushing.

Volunteers

Hours
Creelman, Kevin 12
Luyan, Melissa 12
Marcus, Gerrett 12
Peterson, John 12
Plant, Steve 12
Price, Tracy 12

Project Total: 72

Project Date: 6/4/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Little Zig Zag Canyon
Description: Scouting

Volunteers

Hours
Weston, Ruth 4

Project Total: 4

Project Date: 5/30/2007
District: Zig Zag Ranger District
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Removed 41 trees. Repaired drain dips and water bars. Brushed.

Volunteers

Hours
Hammack, Brice 9
McLaughlin, Larry 9
Murphy, Des 9
Vetter, Dick 9
Walker, Ford 12
Walker, Penny 12
Walker, Richard 20

Project Total: 80

Project Date: 5/16/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls area
Description: Removed 6 logs. Repaired 1 root wad. Scouting for future project.

Volunteers

Hours
Owen, Kim 13

Project Total: 13

Project Date: 4/13/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls feeder and PCT
Description: Assessed winter damage.

Volunteers

Hours
Nelson, David 10
Owen, Kim 10
Owen, Pam 10

Project Total: 30

Project Date: 4/11/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Trail #19
Description: Removed 6 trees (1' to 2'). Repaird 20 yards of tread.

Volunteers

Hours
Corwin, Susan 7
Konner, Jack 5

Project Total: 12

Project Date: 3/25/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Old Salmon River Trail
Description: Removed 14 trees and 2 rood wads. Repaired 100' of tread. Repaired 5 drain dips. Repaired bridge approaches and stairs. Cleared mud and rocks over and under bridge. Blocked off unused trail. Removed debris. Removed fire ring. Improved stream crossing.

Volunteers

Hours
Carr, Pete 11
Carter, Patty 11
Corwin, Susan 9
Gifford, Bill 10
Konner, Jack 12
O'Neil, Geoff 11
Roe, David 10
Stevenson, John 11
Turner, Tammy 11
Wankowicz, Bex 9

Project Total: 105

Project Date: 3/21/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Old Salmon River Trail
Description: Measured risers and analyzed stair structure for repair to be done on 3/25/07

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 3/7/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Old Salmon River Trail
Description: Scouting

Volunteers

Hours
Konner, Jack 8

Project Total: 8

Project Date: 3/6/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Old Salmon River Trail
Description: Scouting

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 10/25/2006
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Sandy River Trail #770
Description: Seasonal removal and storage of temporary bridge over the Sandy River

Volunteers

Hours
Corwin, Susan 5
Konner, Jack 7
Merrifield, John 7
Nelson, David 7

Project Total: 26