Volunteer Projects — Pacific Crest Trail Association
All Agencies
10/1/2007 to 9/30/2008
Activity Summary |
Administration: | 628 |
Meeting: | 361 |
Scouting: | 168 |
Signing: | 59 |
Teaching: | 95 |
Tools: | 56 |
Trail Maintenance (Feeder): | 452 |
Trail Maintenance (Other): | 666 |
Trail Maintenance (PCT): | 4508 |
Trail Protection: | 36 |
Training: | 491 |
Total Volunteer Hours: | 7520 |
Activity Detail (most recent on top) |
Project Date: | 9/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Removed PCT signs a junctions before the snows come and groomers come over the area. Numbered each post and sleeve for easy locating next summer. |
Volunteers |
Hours |
Goodwin, Ron | 6 |
Weston, Ruth | 6 |
Project Total: 12 |
Project Date: | 9/26/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Cleaned 90 drain dips and 21 water bars. Repaired 100' of tread. |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |
Project Date: | 9/24/2008 to 9/28/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Sheep Lake Trail Relocation |
Description: | Completed relocation of trail. |
Volunteers |
Hours |
Anderson, Jim | 13 |
Arkes, Bob | 20 |
Arkes, Jane | 7 |
Barberis, Joe | 18 |
Beard, Dennis | 27 |
Carr, Pete | 29 |
Chelin, Chuck | 26 |
Cobb, Roberta | 12 |
Cunningham, John | 18 |
Gifford, Bill | 18 |
Hammack, Brice | 18 |
Hawley, Bill | 56 |
Hawley, Karla | 29 |
Heid, David | 17 |
Hite, Don | 9 |
Hovin, Leif | 12 |
Irwin, Mark | 18 |
Linde, Tom | 6 |
Merrifield, John | 18 |
Mikol, Greg | 17 |
Tyler, Kerri | 12 |
Webb, Jim | 18 |
Winkel, Jeannette | 9 |
Project Total: 427 |
Project Date: | 9/21/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | North Face crew. Cleared ivy, logs and pre-cut brsh for 1/2 mile. Rebuilt tread slide damage at stup at top of Tanner Creek switchbacks. Cut low-hanging limbs. Built 30' macadam with drainage at spring crossing and top with 3/4- gravel. |
Volunteers |
Hours |
Adelman, Jeff | 10 |
Adelman, LT | 10 |
Brueggermeyer, Marcia | 9 |
Cunningham, John | 11 |
Hawley, Bill | 15 |
Leahy, Erin | 10 |
Nelson, Joan | 11 |
O'Donnell, Erin | 10 |
Project Total: 86 |
Project Date: | 9/20/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Chinidere shortcut to PCT from Eagle Creek |
Description: | Scouiting trip to evaluate possible American Hiking Society Volunteer Vacation work party in 2009. |
Volunteers |
Hours |
Karlgaard, Karl | 7 |
Vhay, John | 7 |
Project Total: 14 |
Project Date: | 9/19/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | Material and tools pickup. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 9/18/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Kim Owen |
Location: | Olallie Lake to Big Lake |
Description: | Repaired 36 drain dips and 6 water bars. |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 9/16/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Brice Hammack |
Location: | Gifford Pinchot headquarters |
Description: | Inventory of private parcels within ½ mile of the Pacific Crest Trail in Gifford Pinchot NF. |
Volunteers |
Hours |
Hammack, Brice | 4 |
Hawley, Bill | 4 |
Linde, Tom | 4 |
Project Total: 12 |
Project Date: | 9/16/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | Power brushing and removing dead fall. Cut out 4 ivy-covered leaner/overhangs. |
Volunteers |
Hours |
Hawley, Bill | 9 |
Martiny, Chuck | 9 |
Project Total: 18 |
Project Date: | 9/13/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Jerry Bentz |
Location: | Breitenbush Lake to Park Ridge |
Description: | Removed 1 tree, cleaned 20 drain dips and 5 water bars. |
Volunteers |
Hours |
Bentz, Jerry | 11 |
Bonitz, Joe | 11 |
LaBelle, Rich | 11 |
Marshall, Ron | 11 |
Nelson, Brian | 11 |
Project Total: 55 |
Project Date: | 9/13/2008 to 9/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls and Sandy River |
Description: | Repaired/created drainage system to divert active spring water from trail in area of annual slide area. Carried materials for Sandy River Guard Station repair. |
Volunteers |
Hours |
Bishop, Glenn | 15 |
Curtain, Gavin | 15 |
Curtain, Joe | 15 |
Gorman, Brian | 15 |
Owen, Kim | 19 |
Pekeider, Jay | 15 |
Philichi, Chris | 15 |
Philichi, Dylan | 15 |
Rhodehamel, Derek | 15 |
Project Total: 139 |
Project Date: | 9/12/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | Clearing. Measuring. Materials List. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 9/10/2008 |
Agency: | N/A |
Leader: | Jack Konner |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 10 caretakers attended the September caretaker meeting at REI Clackamas Town Center. Also in attendance, Kim Gerhardt as a guest of Ruth Weston. |
Volunteers |
Hours |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Hammack, Brice | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Owen, Pam | 4 |
Plant, Steve | 4 |
Webb, Jim | 4 |
Weston, Ruth | 4 |
Wolf, Becky | 4 |
Project Total: 40 |
Project Date: | 9/8/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | Scouting. Cleared 3 small logs. Cut low hanging limbs. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 9/7/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Lolo Pass northbound |
Description: | Filled and repaired sunken trail just before cliff; removed slough and leveled trail 100'; cleared uphill side brush 25 feet; repaired two sections of trail past cliff where the tread was beginning to fail. |
Volunteers |
Hours |
Chelin, Chuck | 6 |
Cobb, Roberta | 7 |
Gifford, Bill | 9 |
Sakshaug, Arvid | 8 |
Project Total: 30 |
Project Date: | 9/2/2008 to 9/5/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Trail Relocation near Sheep Lake |
Description: | Flagging and brushing to avoid cutting several large trees. Removed all stumps in the north half of the relocated trail (80+). Cleared and formed over 400' of tread. Removed 12 small leaners for equestrians. Built 14 drain dips. Installed 3 water bars and 4 check steps. Cut back uphill huckleberry and low hanging limbs. Removed bermand filled tread as neeed. |
Volunteers |
Hours |
Anderson, Jim | 12 |
Arkes, Bob | 30 |
Beard, Dennis | 12 |
Brueggermeyer, Marcia | 10 |
Carr, Pete | 31 |
Cobb, Roberta | 13 |
Gurwell, Bill | 16 |
Hawley, Bill | 40 |
Hawley, Karla | 27 |
Mikol, Greg | 12 |
Warner, Sam | 13 |
Webb, Jim | 10 |
Project Total: 226 |
Project Date: | 9/1/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Trail Relocation near Sheep Lake |
Description: | Cleared 1/4 mile of forest for trail relocation. |
Volunteers |
Hours |
Hawley, Bill | 13 |
Martiny, Chuck | 13 |
Winkel, Jeannette | 13 |
Project Total: 39 |
Project Date: | 9/1/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 west of Tanner Creek |
Description: | Scouting. |
Volunteers |
Hours |
Hawley, Bill | 9 |
Project Total: 9 |
Project Date: | 8/30/2008 to 9/1/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Ernie Strahm |
Location: | Jude Lake to Breitenbush Lake |
Description: | Removed 30 trees, cleaned 15 drain dips and 6 water bars, repaired 1 slide damage and 1 mile of tread. |
Volunteers |
Hours |
Strahm, Ernie | 26 |
Strahm, Lori | 26 |
Project Total: 52 |
Project Date: | 8/29/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Trail Relocation near Sheep Lake |
Description: | Cleared 1/4 mile of forest for trail relocation. |
Volunteers |
Hours |
Hawley, Bill | 13 |
Martiny, Chuck | 13 |
Project Total: 26 |
Project Date: | 8/26/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Cleared 8 trees, cleaned 12 drain dips and repaired 2 slides. Brushed 800'. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Fong, April Ann | 10 |
Karlgaard, Karl | 10 |
Murray, Michael | 11 |
Regehr, Don | 10 |
Riley, Dave | 10 |
Vhay, John | 10 |
Project Total: 71 |
Project Date: | 8/25/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag Canyon |
Description: | Cleared 2 trees, cleaned 82 drain dips and 6 water bars. Erected sign 16A behind Timberline Lodge. Removed sign 16 by amphitheater. |
Volunteers |
Hours |
Weston, Ruth | 8 |
Project Total: 8 |
Project Date: | 8/23/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Mount Hood Wilderness Boundary |
Description: | Cleared 40 trees, cleared 10 drain dips and 15 water bars, repared tread creep in areas along switchbacks. Used power brusher for 1/4 mile along Muddy Fork and detour. Repaired tread on the newly brushed section. Pink ribbon installed along detour and muddy area planked over. New signs installed at Top Spur, Ramona loop and both ends of the detour. |
Volunteers |
Hours |
Carter, Patty | 11 |
Chelin, Chuck | 9 |
Cobb, Roberta | 11 |
Hanes, Douglas | 11 |
Konner, Jack | 11 |
Martiny, Chuck | 11 |
O'Neil, Geoff | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Settlemeyer, Lois | 11 |
Stevenson, John | 11 |
Project Total: 119 |
Project Date: | 8/20/2008 |
Agency: | Columbia River Gorge |
Leader: | Brice Hammack |
Location: | Three Corner Rock to Carpenter Lake Trail Junction |
Description: | Log out. |
Volunteers |
Hours |
Crouse, Bill | 11 |
Hammack, Brice | 12 |
Martiny, Chuck | 12 |
Murphy, Des | 11 |
Walker, Richard | 11 |
Project Total: 57 |
Project Date: | 8/19/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Williams Mine Trail to Stagman Ridge Trail |
Description: | Cleared 22 threes. Minor brushing, water bar cleaning and tread repair accomplished. |
Volunteers |
Hours |
Arkes, Bob | 14 |
Hawley, Bill | 14 |
Hilands, Bill | 14 |
Sakshaug, Arvid | 14 |
Vhay, John | 14 |
Warner, Sam | 14 |
Webb, Jim | 11 |
Project Total: 95 |
Project Date: | 8/18/2008 to 8/20/2008 |
Agency: | Hood River Ranger District |
Leader: | Barb Adams |
Location: | Lolo Pass to Wahtum Lake |
Description: | Cleared over 60 trees (biggest 32"). Brushed where logs were and filled a few holes. |
Volunteers |
Hours |
Adams, Barb | 25 |
Adams, Dave | 25 |
Kenny, Harold | 26 |
Schembs, Jim | 7 |
Project Total: 83 |
Project Date: | 8/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Ramona Falls parking lot |
Description: | Removed 9 small trees. Scouting. |
Volunteers |
Hours |
Corwin, Susan | 6 |
Konner, Jack | 8 |
Project Total: 14 |
Project Date: | 8/13/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 9 caretakers attended the August caretaker meeting at REI Clackamas Town Center. Also in attendance, Dana Berthold (PCTA regional representative) and Ron Northway (Trailkeepers of Oregon executive director). |
Volunteers |
Hours |
Arkes, Bob | 4 |
Cobb, Roberta | 4 |
Goodwin, Ron | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Queen, Steve | 4 |
Vhay, John | 4 |
Webb, Jim | 4 |
Wolf, Becky | 4 |
Project Total: 36 |
Project Date: | 8/9/2008 to 8/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to North Paradise Park Trail Junction |
Description: | Extensive tread repair in and north of Zig Zag Canyon. |
Volunteers |
Hours |
Bartley, Michael | 53 |
Cobb, Roberta | 18 |
Gerhardt, Kim | 45 |
Lee, Patty | 53 |
Nordyke, Jay | 53 |
Nordyke, Thomas | 53 |
Owen, Kim | 53 |
Person, Bill | 59 |
Weston, Ruth | 53 |
Project Total: 440 |
Project Date: | 8/8/2008 to 8/9/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Logged out 45 trees using crosscut saws. Repaired 6 water bars at springs, brushed and improved trtead for 150'. |
Volunteers |
Hours |
Koppy, Larry | 23 |
Marriott, Tyler | 14 |
Pederson, Reed | 21 |
Regehr, Don | 23 |
Vhay, John | 23 |
West, Duane | 21 |
Project Total: 125 |
Project Date: | 8/8/2008 to 8/10/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Junction Lake south |
Description: | Cleared 38 trees using crosscut saws. Cleaned 22 draindipts and installed 11 log and/or rock check-steps with drainage. Brushed half mile of huckleberry and fir. Widened and filled 450' of tread. |
Volunteers |
Hours |
Carr, Pete | 27 |
Cunningham, John | 22 |
Hawley, Bill | 33 |
Hawley, Karla | 33 |
Irwin, Mark | 22 |
Lameka, Ann | 17 |
Shefler, Gerald | 14 |
Winkel, Jeannette | 14 |
Project Total: 182 |
Project Date: | 8/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Paradise Park |
Description: | Worked upheill tread at Zig Zag Canyon bridge. Removed 2 large rocks near bridge. Removed 18 trees and repaired 2 drain dips and 50' of tread. |
Volunteers |
Hours |
Carr, Pete | 13 |
Corwin, Susan | 12 |
Vhay, John | 13 |
Weston, Ruth | 13 |
Project Total: 51 |
Project Date: | 8/4/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | North of Crest Camp |
Description: | Cleared 5 trees using crosscut saw. Delivered cool drinks to AmeriCorps crew. |
Volunteers |
Hours |
Hawley, Bill | 8 |
Hawley, Karla | 8 |
Legg, Stuart | 8 |
Project Total: 24 |
Project Date: | 8/1/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Indian Heaven |
Description: | AmeriCorps crew orientation. |
Volunteers |
Hours |
Hawley, Bill | 7 |
Project Total: 7 |
Project Date: | 7/31/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Indian Heaven |
Description: | Removed 6 trees (8" to 22") in Wilderness. |
Volunteers |
Hours |
Hawley, Bill | 13 |
Hawley, Karla | 11 |
Shefler, Gerald | 13 |
Winkel, Jeannette | 13 |
Project Total: 50 |
Project Date: | 7/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to 1/4 mile beyond "BEE" trail |
Description: | Scouting. Cleared 6 tree <12". |
Volunteers |
Hours |
Weston, Ruth | 9 |
Project Total: 9 |
Project Date: | 7/28/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Replaced 7 PCT signs, stashed 3 signs to be installed in sleeves in 2 weeks because of snow covering trails leading to PCT. |
Volunteers |
Hours |
Goodwin, Katie | 5 |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 15 |
Project Date: | 7/27/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass (and Top Spur Trail) |
Description: | Cleared 28 trees, brushed 1 miles, filled holes and removed debris. |
Volunteers |
Hours |
Beard, Dennis | 9 |
Carter, Patty | 9 |
Hanes, Douglas | 9 |
Konner, Jack | 9 |
Martiny, Chuck | 9 |
O'Neil, Geoff | 9 |
Plant, Steve | 9 |
Ranganathan, Nandini | 9 |
Squires, Bob | 9 |
Vhay, John | 9 |
Weston, Ruth | 9 |
Project Total: 99 |
Project Date: | 7/23/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | East Crater Trail and Road 60 |
Description: | Cleared trees. |
Volunteers |
Hours |
Hawley, Bill | 12 |
Hawley, Karla | 11 |
Martiny, Chuck | 9 |
Winkel, Jeannette | 9 |
Project Total: 41 |
Project Date: | 7/19/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | cleared 34 trees and cleaned 6 drain dips and 11 water bars. Extensive brushing and minor tread repair. |
Volunteers |
Hours |
Creelman, Kevin | 11 |
Goodwin, Ron | 11 |
Hanes, Douglas | 11 |
Luyan, Melissa | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Stevenson, John | 11 |
Project Total: 77 |
Project Date: | 7/18/2008 to 7/20/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 25 trees. Repaired 36 drain dips and 3 water bars. Brushed 200 yards and repaired 20 feet of tread. |
Volunteers |
Hours |
Auerbach, Paul | 21 |
Cunningham, John | 22 |
Fong, April Ann | 21 |
Kirchmiller, Christie | 19 |
Kirchmiller, Robert | 19 |
Owen, Kim | 14 |
Roe, David | 18 |
Young, Lee | 22 |
Project Total: 156 |
Project Date: | 7/18/2008 |
Agency: | Hood River Ranger District |
Leader: | Barb Adams |
Location: | Lolo Pass |
Description: | Minor drainage repair. Cleaned one culvert. Cleaned one water bar. |
Volunteers |
Hours |
Adams, Barb | 4 |
Adams, Dave | 4 |
Adams, Julie | 4 |
Project Total: 12 |
Project Date: | 7/17/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Scouting. |
Volunteers |
Hours |
Goodwin, Katie | 10 |
Goodwin, Ron | 10 |
Project Total: 20 |
Project Date: | 7/14/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 7/14/2008 to 7/17/2008 |
Agency: | Columbia River Gorge |
Leader: | Brice Hammack |
Location: | Road 2090 to Road 2000 |
Description: | Completely refurbished trail with crew of high school students form the Forest Youth Success Program working out of Carson Washington. |
Volunteers |
Hours |
Hammack, Brice | 28 |
Project Total: 28 |
Project Date: | 7/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge |
Description: | Scouting. . . SNOW! |
Volunteers |
Hours |
Van Gundy, Jackie | 5 |
Weston, Ruth | 5 |
Project Total: 10 |
Project Date: | 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Logout (20 trees) and drainage maintenance (26 drainage dips and 8 water bars) between Pinhead Saddle trailhead and north slope of North Pinhead Butte. |
Volunteers |
Hours |
Roe, David | 19 |
Project Total: 19 |
Project Date: | 7/11/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Guided two representatives of BARK to document conditions of Skyline Road and PCT in vicinity of Pinhead Buttes |
Volunteers |
Hours |
Roe, David | 8 |
Project Total: 8 |
Project Date: | 7/11/2008 to 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Olallie Lake area and Triangle Lake Campground |
Description: | Removed 20 logs under 14". Brushed out huckleberry and removed rocks from the trail bed. Removed damaged corral poles from campground and cleaned up all the manure. |
Volunteers |
Hours |
Chemarin, Renee | 16 |
Heeter, Carol | 10 |
Lister, Norlene | 13 |
Patterson, Bob | 16 |
Schlitt, Barbara | 16 |
Turner, Linda | 13 |
Turner, Vince | 13 |
Warren, Jack | 16 |
Wilson, Carl | 16 |
Project Total: 129 |
Project Date: | 7/11/2008 to 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Lemiti Creek to Pinhead overlook |
Description: | Removed 32 trees. |
Volunteers |
Hours |
Gonzalas, Brittney | 22 |
Gonzalas, David | 22 |
Levy, Kathy | 13 |
Whitmyer, Dennis | 22 |
Wolf, Becky | 8 |
Project Total: 87 |
Project Date: | 7/10/2008 to 7/12/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Sandy River |
Description: | Cleared 8 trees (6" to 10"). Repaired 10 drain dips, 100 yard of slide damage, 100 yards of brushing and 300 yards of tread. |
Volunteers |
Hours |
Cohoe, Kelly | 26 |
Cohoe, Michael | 23 |
Cohoe, Philip | 23 |
Janzen, Andrew | 23 |
Janzen, Paul | 23 |
Jespersen, Kyle | 23 |
Johnson, Gabriel | 23 |
Owen, Kim | 26 |
Sathrum, John | 23 |
Smith, Greg | 23 |
Smith, Tom | 23 |
Project Total: 259 |
Project Date: | 7/10/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Flagged trail from Lemiti Bute to Lemiti Meadows for tomorrow's work party. |
Volunteers |
Hours |
Roe, David | 8 |
Project Total: 8 |
Project Date: | 7/9/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 5 caretakers attended the July caretaker meeting at REI Clackamas Town Center. Also in attendance was Jennifer Tripp (PCTA main office in Sacramento). |
Volunteers |
Hours |
Allen, Eric | 4 |
Bentz, Jerry | 4 |
Goodwin, Ron | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Project Total: 20 |
Project Date: | 7/7/2008 to 7/9/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Road #23 to Wilderness Boundary |
Description: | Cleared 18 trees. Repaired 49 drain dips, brushed a mile and repaired a half mile of tread to Williams Mine. |
Volunteers |
Hours |
Arkes, Bob | 27 |
Barberis, Joe | 18 |
Merrifield, John | 18 |
Vhay, John | 18 |
Project Total: 81 |
Project Date: | 7/6/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | East Crater Trail and Road 60 |
Description: | Cleared trees up to snow line. |
Volunteers |
Hours |
Hawley, Bill | 8 |
Winkel, Jeannette | 8 |
Project Total: 16 |
Project Date: | 7/6/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass south |
Description: | Cleared 60 trees in 3 miles, 8" to 12". Light brushing. |
Volunteers |
Hours |
Cobb, Roberta | 9 |
Martiny, Chuck | 10 |
Towill, Elizabeth | 9 |
Project Total: 28 |
Project Date: | 7/4/2008 to 7/6/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Spring Indian Reservation |
Description: | Scouting work between Warm Spring River and Lemiti Butte |
Volunteers |
Hours |
Roe, David | 20 |
Project Total: 20 |
Project Date: | 7/3/2008 to 7/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 6 logs. |
Volunteers |
Hours |
Owen, Kim | 17 |
Owen, Pam | 17 |
Project Total: 34 |
Project Date: | 7/2/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Hood River Ranger Station |
Description: | Meeting to discuss bike races between Twin Lakes and Palmateer. |
Volunteers |
Hours |
Adams, Barb | 7 |
Cobb, Roberta | 8 |
Vhay, John | 8 |
Project Total: 23 |
Project Date: | 7/2/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 6/30/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Cloeared 18 trees in two miles (< 8"). Posted logs at the junction with Frog Lake trail, at the junction to the trailhead spur, and at the Hwy 26 crossing (just a sticker, did not have the ful size platic logo). Picked up lots of litter. |
Volunteers |
Hours |
Cobb, Roberta | 10 |
Weston, Ruth | 9 |
Project Total: 19 |
Project Date: | 6/29/2008 to 7/2/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Brice Hammack |
Location: | Road 2090 to Sedum Ridge |
Description: | Trail work with AmeriCorps crew. |
Volunteers |
Hours |
Hammack, Brice | 41 |
Project Total: 41 |
Project Date: | 6/28/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 2090 south |
Description: | Cleared 32 trees (24: 4"-10", 8: 10"-18") |
Volunteers |
Hours |
Anderson, Roger | 11 |
Arkes, Bob | 11 |
Cobb, Roberta | 11 |
Cunningham, John | 7 |
Hawley, Bill | 3 |
Hawley, Karla | 13 |
Owen, Kim | 2 |
Sakshaug, Arvid | 11 |
Vhay, John | 11 |
Winkel, Jeannette | 12 |
Project Total: 92 |
Project Date: | 6/28/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Crosscut and chainsaw certification (Road 2070) |
Description: | Certified sawyers in chainsaw and croscut saw use. |
Volunteers |
Hours |
Cunningham, John | 4 |
Hawley, Bill | 12 |
Owen, Kim | 9 |
Project Total: 25 |
Project Date: | 6/25/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Brice Hammack |
Location: | Road 2090 to Road 2070 |
Description: | Cleared 52 trees, repaired drain dips, 2 slides, 1 root wad and light with spot brushing and tread repair. |
Volunteers |
Hours |
Doty, Pat | 10 |
Hammack, Brice | 10 |
Martiny, Chuck | 10 |
Murphy, Des | 10 |
Walker, Richard | 10 |
Project Total: 50 |
Project Date: | 6/15/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Cleared 8 trees. Brushed rhododendron and vine maple for half mile. |
Volunteers |
Hours |
Moore, Mickey | 10 |
Walker, Ford | 10 |
Walker, Penny | 10 |
Walker, Richard | 10 |
Project Total: 40 |
Project Date: | 6/15/2008 |
Agency: | N/A |
Leader: | Kim Owen |
Location: | Badger Creek Wilderness |
Description: | Crosscut saw training |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 6/14/2008 |
Agency: | Columbia River Gorge |
Leader: | Brice Hammack |
Location: | Road 2090 to Three Corner Rock |
Description: | Scouted Road 2090 to Three Corner Rock. More than n ormal nukmber of trees down. |
Volunteers |
Hours |
Hammack, Brice | 10 |
McLaughlin, Larry | 10 |
Project Total: 20 |
Project Date: | 6/13/2008 to 8/15/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Tom Linde |
Location: | Crest Camp to Panther Creek |
Description: | Miscellaneous hours reported by Tom Linde for June 13, 19, 23, July 11, 28, 29, August 7, 12, 14, 15. |
Volunteers |
Hours |
Linde, Tom | 94 |
Project Total: 94 |
Project Date: | 6/11/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 10 caretakers attended the June caretaker meeting at REI Clackamas Town Center. |
Volunteers |
Hours |
Arkes, Bob | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Owen, Pam | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Weston, Ruth | 4 |
Wolf, Becky | 4 |
Project Total: 40 |
Project Date: | 6/8/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Bridge of the Gods to I-84 Overpass |
Description: | Reshaped 200 feet of steep side slope tread, rebuilt 2 drainages ways, removed 1 root wad, power brushed 200 yards of trail, removed barbed wire and old crushed fencing, installed roofing on steps leading down from bridge, removed invasive plants (ivy), removed organics, widened tread and installed base rock in wet problem areas, layed geo-clothe in problem areas, installed 4x4 PT border and pinned with 1/2" rebar, spread 12 yards of gravel and compaced with plate compactor, dressed with 1/4" gravel. |
Volunteers |
Hours |
Arkes, Bob | 9 |
Arkes, Jane | 9 |
Chelin, Chuck | 10 |
Cobb, Roberta | 9 |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Hawley, Bill | 39 |
Hawley, Karla | 5 |
Hilands, Bill | 9 |
Koppy, Larry | 9 |
Lameka, Ann | 9 |
Marriott, Tyler | 9 |
Matzke, Jim | 10 |
Niece, Ron | 11 |
Queen, Steve | 7 |
Settlemeyer, Lois | 5 |
Sohler, Don | 9 |
Project Total: 177 |
Project Date: | 5/26/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Road 2000 south |
Description: | Cleared 43 logs (20: <8", 23: 8" - 24") |
Volunteers |
Hours |
Cunningham, John | 9 |
Hawley, Bill | 10 |
Project Total: 19 |
Project Date: | 5/24/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 2070 north |
Description: | Cleared 60 logs north until the snow made the trail impassible. |
Volunteers |
Hours |
Queen, Steve | 11 |
Sakshaug, Arvid | 11 |
Project Total: 22 |
Project Date: | 5/24/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Chainsaw certification (Road 2070) |
Description: | 6 volunteers participated in a chainsaw re-certification session. |
Volunteers |
Hours |
Chelin, Chuck | 10 |
Cobb, Roberta | 7 |
Doty, Pat | 11 |
Maddox, Ken | 9 |
Owen, Kim | 8 |
Owen, Pam | 8 |
Project Total: 53 |
Project Date: | 5/24/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Chainsaw certification (Road 2070) |
Description: | 2 volunteers re-certifed other volunteers |
Volunteers |
Hours |
Cunningham, John | 11 |
Hawley, Bill | 11 |
Project Total: 22 |
Project Date: | 5/18/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake |
Description: | Cleared 2 trees from Frog Lake to the first switchback at which point snow prevented further progress. |
Volunteers |
Hours |
Cobb, Roberta | 5 |
Project Total: 5 |
Project Date: | 5/16/2008 to 5/18/2008 |
Agency: | N/A |
Leader: | Kim Owen |
Location: | Westfir - High Cascades Training |
Description: | Developed curriculm for training and certifying crosscut sawyers at the A and B level for wilderness log outs on the PCT. During the Westfir even, re-certified two sawyers at the B level and certified five new crosscut sawyers at the A level. |
Volunteers |
Hours |
Hawley, Bill | 38 |
Owen, Kim | 32 |
Project Total: 70 |
Project Date: | 5/14/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 16 caretakers attended the May caretaker meeting at REI Clackamas Town Center. |
Volunteers |
Hours |
Allen, Eric | 3 |
Arkes, Bob | 3 |
Bentz, Jerry | 3 |
Cunningham, John | 3 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Hawley, Bill | 3 |
Konner, Jack | 3 |
Owen, Kim | 3 |
Plant, Steve | 3 |
Queen, Steve | 3 |
Vhay, John | 3 |
Webb, Jim | 3 |
Weston, Ruth | 3 |
Wolf, Becky | 3 |
Project Total: 45 |
Project Date: | 5/13/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Herman Creek to Wilderness Boundary |
Description: | Cleared limbs and logs. Emoved a large hanging log. Cleared to the snow at 2800'. |
Volunteers |
Hours |
Carr, Pete | 10 |
Chelin, Chuck | 10 |
Hawley, Bill | 10 |
Martiny, Chuck | 10 |
Project Total: 40 |
Project Date: | 5/10/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Chainsaw Certification (Wind River) |
Description: | Wind River chainsaw certification II |
Volunteers |
Hours |
Beard, Dennis | 8 |
Carter, Patty | 9 |
Hawley, Bill | 13 |
Heid, David | 9 |
Konner, Jack | 9 |
Linde, Tom | 8 |
Moeller, Dan | 6 |
O'Neil, Geoff | 9 |
Project Total: 71 |
Project Date: | 5/10/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Brice Hammack |
Location: | Road 43 to Wind River Road |
Description: | Cleared 29 trees. General brushing. |
Volunteers |
Hours |
Hammack, Brice | 10 |
Martiny, Chuck | 10 |
McLaughlin, Larry | 10 |
Mullen, David | 10 |
Murphy, Des | 10 |
Project Total: 50 |
Project Date: | 5/3/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Clackamas River ranger district |
Description: | Chainsaw recertificaton at Estacada Ranger Station. |
Volunteers |
Hours |
Roe, David | 9 |
Project Total: 9 |
Project Date: | 4/27/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 (PCT to Eagle Creek) |
Description: | Repaired 7 drain dips and 4 minor rock slides (70'). Brushed for 1 mile and repaired tread at multiple locations (1/4 mile total) |
Volunteers |
Hours |
Bronsein, Bill | 8 |
Chelin, Chuck | 9 |
Cunningham, John | 10 |
Dods, Jane | 11 |
Echter, Anna | 9 |
Gifford, Bill | 8 |
Hawley, Bill | 11 |
Project Total: 66 |
Project Date: | 4/19/2008 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Chainsaw Certification (Wind River Work Center) |
Description: | 9 volunteers participated in a chainsaw recertification course at the Wind River Work Center. |
Volunteers |
Hours |
Arkes, Bob | 8 |
Cunningham, John | 8 |
Goodwin, Ron | 6 |
Hammack, Brice | 6 |
Hawley, Bill | 9 |
Martiny, Chuck | 8 |
McLaughlin, Larry | 6 |
Walker, Richard | 6 |
Webb, Jim | 6 |
Project Total: 63 |
Project Date: | 4/18/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Clackama River trail |
Description: | Trail maintenance workshop. Focus on drainage. Roger Bell on site. |
Volunteers |
Hours |
DeVall, Marty | 9 |
Roe, David | 10 |
Sischo, Gary | 9 |
Wolf, Becky | 9 |
Project Total: 37 |
Project Date: | 4/14/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Herman Creek to Hatfield Wilderness |
Description: | Scouted Herman Creek to Hatfield Wilderness. Maps and crew planning. |
Volunteers |
Hours |
Hawley, Bill | 11 |
Project Total: 11 |
Project Date: | 4/13/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Herman Creek junction to Hatfield Wilderness |
Description: | Cleared 24 trees (1: 26", 2: 14", 7: 6"-12", 14: <6"). Cleaned 25 drain dips. Brushed vine maple throughout. |
Volunteers |
Hours |
Carr, Pete | 11 |
Chelin, Chuck | 11 |
Hawley, Bill | 14 |
Martiny, Chuck | 10 |
Project Total: 46 |
Project Date: | 4/10/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Wind River, Trail 400 |
Description: | Delivered tools to Wind River tool cache. Took inventory. Scouted Brice's section looking for logs for 4/19 project. Scouted Trail 400 |
Volunteers |
Hours |
Hawley, Bill | 9 |
Project Total: 9 |
Project Date: | 4/9/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 15 caretakers attended the April caretaker meeting at REI Clackamas Town Center. |
Volunteers |
Hours |
Bentz, Jerry | 3 |
Berthold, Dana | 4 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Hawley, Bill | 3 |
Konner, Jack | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 3 |
Owen, Pam | 3 |
Plant, Steve | 3 |
Queen, Steve | 3 |
Settlemeyer, Lois | 3 |
Vhay, John | 3 |
Walker, Richard | 3 |
Weston, Ruth | 3 |
Project Total: 46 |
Project Date: | 4/3/2008 to 4/4/2008 |
Agency: | N/A |
Leader: | Bill Hawley |
Location: | Portland tool cache |
Description: | Cleaned, sharpened, repaired and returned tools. Finished painting north cache tools and sharpened. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 3/25/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Trail 400 at Moffett Creek |
Description: | Cleared 9 trees, repaired 16 drain dips, 3 slides and 1 mile of tread,, and brushed 1/mile overhead and 3/4 mile on the ground with power brusher. |
Volunteers |
Hours |
Carr, Pete | 9 |
Chelin, Chuck | 9 |
Fantz, Heather | 8 |
Hanes, Douglas | 10 |
Hawley, Bill | 11 |
Martiny, Chuck | 10 |
Weston, Ruth | 9 |
Project Total: 66 |
Project Date: | 3/22/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Estacad Ranger Station |
Description: | CPR Training |
Volunteers |
Hours |
Farrier, Bruce | 8 |
Farrier, Melissa | 8 |
Lister, Norlene | 8 |
Livermore, Stacey | 8 |
Schlitt, Barbara | 8 |
Turner, Linda | 8 |
Wolf, Becky | 7 |
Project Total: 55 |
Project Date: | 3/22/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Fort Rains |
Description: | Cleared 15 trees, repaired 5 drain dips, brushed 3/4 mile of blackberry with power brusher, widened 1/2 mile of tread removing creep and popping rocks to even tread. |
Volunteers |
Hours |
Brueggermeyer, Marcia | 7 |
Chelin, Chuck | 9 |
Covey, Kathy | 10 |
Covey, Randy | 10 |
Cunningham, John | 9 |
Hawley, Bill | 10 |
Martiny, Chuck | 9 |
Park, Yon | 9 |
Settlemeyer, Lois | 6 |
Warner, Sam | 9 |
Project Total: 88 |
Project Date: | 3/12/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | 17 caretakers attended the March caretaker meeting at REI Clackamas Town Center. |
Volunteers |
Hours |
Adams, Barb | 3 |
Allen, Eric | 3 |
Arkes, Bob | 3 |
Bentz, Jerry | 3 |
Cobb, Roberta | 3 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Hawley, Bill | 3 |
Konner, Jack | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 3 |
Owen, Pam | 3 |
Plant, Steve | 3 |
Queen, Steve | 3 |
Vhay, John | 3 |
Webb, Jim | 3 |
Wolf, Becky | 3 |
Project Total: 51 |
Project Date: | 3/11/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Tamanous Trail to Gillette Lake |
Description: | Cleared 9 trees (4" - 8"). Trimmed branches of 4 threes to open trail. Installed lock box at Cascade Locks caches. Posted new assurance markers in new clear cut. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 3/7/2008 to 3/9/2008 |
Agency: | N/A |
Leader: | Bill Hawley |
Location: | Portland tool cache |
Description: | Sharpened all hand tools (#120), installed handles on 16 new Reinharts, built new racks to hold additional tools, sorted tools for distribution to north tool cache, reorganized tools and supplies, sotred kitchen equipment in attic, assembled new tools, cleaned. |
Volunteers |
Hours |
Arkes, Bob | 8 |
Cobb, Roberta | 9 |
Hammack, Brice | 8 |
Hawley, Bill | 15 |
Owen, Kim | 10 |
Project Total: 50 |
Project Date: | 3/6/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Dry Creek (south) |
Description: | Cleared 9 logs (5: 4-10"; 4: 10"+). Repaired 1 large root wad. Reparied 30' of tread. |
Volunteers |
Hours |
Hawley, Bill | 12 |
Martiny, Chuck | 11 |
Vetter, Dick | 10 |
Project Total: 33 |
Project Date: | 2/29/2008 |
Agency: | Columbia River Gorge |
Leader: | Chuck Martiny |
Location: | Tanner Creek to Bridge of the Gods |
Description: | Removed 9 logs (10" to 24"). Restored tread around a 10' root wad. |
Volunteers |
Hours |
Martiny, Chuck | 11 |
Vetter, Dick | 11 |
Project Total: 22 |
Project Date: | 2/24/2008 |
Agency: | Columbia River Gorge |
Leader: | Steve Queen |
Location: | Clearcut north of Gillette Lake to Greenleaf Creek |
Description: | Repaired tread damage caused by recent Longview Fibre clear cut. Flagged and bordered trail that coincides with gas line road that no longer has trees on which to put markers. Cut back vine maple that would have grown over the trail in the summer (did same with 100 yard stretch north of Gillette Lake). Performed annual drainage maintenance on the north side of Greenleaf Creek. |
Volunteers |
Hours |
Arkes, Bob | 8 |
Coggswell, Don | 8 |
Hawley, Bill | 8 |
Mikol, Greg | 8 |
Queen, Steve | 8 |
Sakshaug, Arvid | 8 |
Warner, Sam | 8 |
Project Total: 56 |
Project Date: | 2/23/2008 |
Agency: | Columbia River Gorge |
Leader: | Ruth Weston |
Location: | Eagle Creek Trail |
Description: | Removed most of 36" tree (passable now). Repaired many slides. |
Volunteers |
Hours |
Abell, Chris | 9 |
Bunting, Clint | 9 |
Carr, Pete | 9 |
Cobb, Roberta | 9 |
Hawley, Bill | 9 |
Kliewer, Dave | 9 |
Marriott, Tyler | 9 |
Weston, Ruth | 9 |
Project Total: 72 |
Project Date: | 2/16/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Elowah Falls |
Description: | Completed construction of a 15' stone wall that supports 20' of trail in the switchback just west of Elowah Falls. Removed 7 logs, repaired 4 drain dips and 2 slidees. Brushed 80 feet of blackberry and salmon berry. |
Volunteers |
Hours |
Carr, Pete | 9 |
Chelin, Chuck | 9 |
Hawley, Bill | 10 |
Maddox, Ken | 8 |
Park, Yon | 9 |
Vetter, Dick | 9 |
Project Total: 54 |
Project Date: | 2/11/2008 |
Agency: | Columbia River Gorge |
Leader: | Ruth Weston |
Location: | Elowah Falls Trail |
Description: | Cleared 14 trees, reapired 200' of narrow, eroded trail, built rock wall, brushed three miles, repaired 2 switchbacks. |
Volunteers |
Hours |
Bogue, Willie | 9 |
Carr, Pete | 9 |
Chelin, Chuck | 9 |
Cobb, Roberta | 9 |
Covey, Randy | 9 |
Davidson, Tom | 9 |
Hawley, Bill | 9 |
Jack, Boyd | 10 |
Martiny, Chuck | 9 |
Settlemeyer, Lois | 9 |
Vetter, Dick | 9 |
Weston, Ruth | 9 |
Project Total: 109 |
Project Date: | 2/10/2008 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Trails in the Columbia River Gorge |
Description: | 45 logs cleared. 45 areas of vine maple cleared. 18 miles of trail cleared: Latoral Falls for 1 mile. Angels Rest to Wahkeena Springs. Multnoma Falls to Horsetail Jct and to Oneonta trailhead. Horsetail Falls to Triple Falls bridge. Eagle Creek past Punchbolw for 2.25 miles one way. Cleared over 18 miles of trail; 80 logs plus we cleared another 45 areas of broken vine maple blocking the trail. Locations: Latorell Trail 1 mile Angels Rest Trail 4.8 miles Wahkeena Trail 2.8 miles Larch Mtn Trail (to Multnomah Falls and beyond the junction with Wahekeena Trail) 2 miles Gorge Trail 400/Oneonta Trail between Multnomah Falls and Oneonta Gorge 2.5 miles Trailhead spur of Oneonta Trail 0.2 miles Oneonta Trail from Trail 400 junction to a little past Triple Falls Bridge 1.3 miles Horsetail Falls 1.3 miles Eagle Creek Trail to a little past Punchbowl 2.5 mile |
Volunteers |
Hours |
Barberis, Joe | 11 |
Cather, Robert | 8 |
Chelin, Chuck | 8 |
Cobb, Roberta | 9 |
Cunningham, John | 8 |
Goodwin, Ron | 7 |
Hawley, Bill | 9 |
Maddox, Ken | 6 |
Martiny, Chuck | 11 |
Roe, David | 11 |
Squires, Bob | 6 |
Vetter, Dick | 9 |
Warner, Sam | 9 |
Project Total: 112 |
Project Date: | 2/9/2008 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Multomah and Wakeena Falls Loop |
Description: | Removed 35 trees, repaired 1 slide damage and 1 root wad. |
Volunteers |
Hours |
Chelin, Chuck | 9 |
Owen, Kim | 9 |
Queen, Steve | 9 |
Sakshaug, Arvid | 9 |
Project Total: 36 |
Project Date: | 1/26/2008 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Elowah Falls and McCord Creek Trails |
Description: | Removed 2 small trees, 0.8 mile brushing with power brush cutter. Cleared 3 culverts, closed shortcuts to avoid switchbacks. |
Volunteers |
Hours |
Abell, Chris | 10 |
Beard, Dennis | 9 |
Chelin, Chuck | 9 |
Cobb, Roberta | 8 |
Hald, Bryan | 9 |
Marriott, Tyler | 10 |
Martiny, Chuck | 10 |
Panter, Henry | 6 |
Robbins, Kyle | 8 |
Schomburg, Dan | 9 |
Vetter, Dick | 8 |
Vhay, John | 9 |
Project Total: 105 |
Project Date: | 1/12/2008 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Oneonta Trail |
Description: | Removed a large root wad. Repaired 30 feet of tread. |
Volunteers |
Hours |
Owen, Kim | 9 |
Richard, Jeff | 9 |
Project Total: 18 |
Project Date: | 1/7/2008 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Eagle Creek Trail |
Description: | Repaired 6 slides on first 1/4 mile of trail. Finished building the 26' bridge, filled in approaches, cleared the trail on approaches. Cleared ditches and culverts along same stretch. |
Volunteers |
Hours |
Carr, Pete | 9 |
Cather, Robert | 9 |
Chelin, Chuck | 8 |
Cobb, Roberta | 8 |
Hammack, Brice | 9 |
McLaughlin, Larry | 9 |
Weston, Ruth | 8 |
Project Total: 60 |
Project Date: | 1/3/2008 to 1/4/2008 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Eagle Creek Trail |
Description: | Rebuilt 26' steel beam bridge. Cleared 50' of landslide. |
Volunteers |
Hours |
Carr, Pete | 18 |
Chelin, Chuck | 17 |
Cobb, Roberta | 9 |
Hawley, Bill | 19 |
Nelson, David | 8 |
Owen, Kim | 8 |
Project Total: 79 |
Project Date: | 1/1/2008 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek to Table Mountain |
Description: | Cleared 11 trees (3: 14"-24"; 8: 6"-14"). Repaired 4 drain dips, 2 water bars and 2 slides. Performed general brushing, repaired 200' of creep and rebuilt 40 fee of trail that gave way. |
Volunteers |
Hours |
Carr, Pete | 10 |
Chelin, Chuck | 10 |
Douglass, Alan | 10 |
Hawley, Bill | 11 |
Martiny, Chuck | 10 |
Nelson, David | 10 |
Robbins, Kyle | 10 |
Sakshaug, Arvid | 10 |
Warner, Sam | 10 |
Project Total: 91 |
Project Date: | 1/1/2008 to 9/30/2008 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Administration |
Description: | Administration |
Volunteers |
Hours |
Cobb, Roberta | 19 |
Konner, Jack | 300 |
Queen, Steve | 150 |
Vhay, John | 6 |
Weston, Ruth | 34 |
Project Total: 509 |
Project Date: | 12/29/2007 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Oneonta Trail |
Description: | Logged out 2 24" trees, cleaned 2 drain dips, mitigated root wad damage. |
Volunteers |
Hours |
Owen, Kim | 6 |
Project Total: 6 |
Project Date: | 12/29/2007 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Eagle Trail to Punchbowl |
Description: | Scouting. Slide damage extensive in first half mile. |
Volunteers |
Hours |
Cobb, Roberta | 5 |
Weston, Ruth | 5 |
Project Total: 10 |
Project Date: | 12/10/2007 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Ponytail Falls Trail |
Description: | Popped rocks and filled holes with gravel. 1065' of tread repair. |
Volunteers |
Hours |
Abell, Chris | 8 |
Carr, Pete | 8 |
Chelin, Chuck | 8 |
Cobb, Dave | 8 |
Cobb, Roberta | 8 |
Portera, Brian | 8 |
Settlemeyer, Lois | 8 |
Warner, Sam | 8 |
Weston, Ruth | 8 |
Project Total: 72 |
Project Date: | 11/26/2007 to 11/30/2007 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Trout Lake Washington |
Description: | Advanced tool training seminar |
Volunteers |
Hours |
Cobb, Roberta | 44 |
Hawley, Bill | 44 |
Owen, Kim | 44 |
Weston, Ruth | 44 |
Project Total: 176 |
Project Date: | 11/16/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls loop |
Description: | Removed 2 trees (14" and 18"). Repaired 6 water bars and 1 root wad damage. Cleaned under Ramona Creek log bridge. |
Volunteers |
Hours |
Owen, Kim | 10 |
Richard, Jeff | 10 |
Project Total: 20 |
Project Date: | 11/14/2007 |
Agency: | Mount Adams Ranger District |
Leader: | Tom Linde |
Location: | USFS offices |
Description: | Grant meeting |
Volunteers |
Hours |
Linde, Tom | 3 |
Project Total: 3 |
Project Date: | 11/5/2007 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Multnomah Falls / Larch Mountain Trail |
Description: | Hauled cement mix, tools and rails and posts uphill using Honda toters. Installed 130 feet of split rail fencing. |
Volunteers |
Hours |
Carr, Pete | 8 |
Chelin, Chuck | 8 |
Cobb, Roberta | 8 |
Davidson, Tom | 8 |
Hammack, Brice | 8 |
Hawley, Bill | 8 |
Vetter, Dick | 8 |
Walker, Richard | 8 |
Warner, Sam | 8 |
Weston, Ruth | 8 |
Winkler, Dan | 8 |
Project Total: 88 |
Project Date: | 11/3/2007 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Eagle Creek |
Description: | Trying to bring down the hanging cliff. Edan and Jeff for USFS present. |
Volunteers |
Hours |
Cobb, Roberta | 6 |
Project Total: 6 |
Project Date: | 11/2/2007 to 11/4/2007 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Crosscut saw training (Wind River Work Center) |
Description: | 2 volunteers participated in training to become a volunteer certifiers. |
Volunteers |
Hours |
Hawley, Bill | 30 |
Owen, Kim | 30 |
Project Total: 60 |
Project Date: | 10/27/2007 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Eagle Creek |
Description: | Repaired 2 slides. |
Volunteers |
Hours |
Berthold, Dana | 4 |
Carr, Pete | 5 |
Chelin, Chuck | 6 |
Cobb, Roberta | 4 |
Maddox, Ken | 4 |
Squires, Bob | 4 |
Vetter, Dick | 4 |
Project Total: 31 |
Project Date: | 10/24/2007 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Roberta Cobb's house |
Description: | October caretaker meeting |
Volunteers |
Hours |
Allen, Eric | 3 |
Arkes, Bob | 3 |
Berthold, Dana | 4 |
Cobb, Roberta | 2 |
Goodwin, Ron | 3 |
Hammack, Brice | 3 |
Hawley, Bill | 3 |
Konner, Jack | 3 |
Lukins, Dick | 3 |
McLaughlin, Larry | 3 |
Owen, Kim | 3 |
Owen, Pam | 3 |
Queen, Steve | 9 |
Strahm, Ernie | 3 |
Walker, Richard | 3 |
Weston, Ruth | 3 |
Wolf, Becky | 3 |
Project Total: 57 |
Project Date: | 10/17/2007 |
Agency: | Mount Adams Ranger District |
Leader: | Brice Hammack |
Location: | Sasquatch timber sale |
Description: | DNR timber sale examination |
Volunteers |
Hours |
Allen, Eric | 8 |
Hammack, Brice | 8 |
McLaughlin, Larry | 8 |
Project Total: 24 |
Project Date: | 10/15/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge area |
Description: | Removed and lay down locked signs before snow grooming machines operate. |
Volunteers |
Hours |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 10 |
Project Date: | 10/8/2007 to 10/9/2007 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Indian Heaven to Sawtooth Berry Fields |
Description: | Removed 1 24" tree. Cleaned over 20 drain dips. Installed 14 water bars and check dams. Power brush cutter outside Wilderness. 200 yards of berm removal. |
Volunteers |
Hours |
Carr, Pete | 21 |
Hawley, Bill | 23 |
Project Total: 44 |
Project Date: | 10/1/2007 to 12/31/2007 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Administration |
Description: | Administrative hours. |
Volunteers |
Hours |
Cobb, Roberta | 3 |
Hawley, Bill | 35 |
Owen, Kim | 81 |
Project Total: 119 |