Volunteer Projects — Pacific Crest Trail Association
Mount Hood National Forest (Hood River, Zig Zag and Clackamas River Ranger Districts)
10/1/2007 to 9/30/2008
Activity Summary |
Meeting: | 23 |
Scouting: | 103 |
Signing: | 37 |
Trail Maintenance (PCT): | 2207 |
Training: | 101 |
Total Volunteer Hours: | 2471 |
Activity Detail (most recent on top) |
Project Date: | 9/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Removed PCT signs a junctions before the snows come and groomers come over the area. Numbered each post and sleeve for easy locating next summer. |
Volunteers |
Hours |
Goodwin, Ron | 6 |
Weston, Ruth | 6 |
Project Total: 12 |
Project Date: | 9/26/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Cleaned 90 drain dips and 21 water bars. Repaired 100' of tread. |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |
Project Date: | 9/20/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Chinidere shortcut to PCT from Eagle Creek |
Description: | Scouiting trip to evaluate possible American Hiking Society Volunteer Vacation work party in 2009. |
Volunteers |
Hours |
Karlgaard, Karl | 7 |
Vhay, John | 7 |
Project Total: 14 |
Project Date: | 9/18/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Kim Owen |
Location: | Olallie Lake to Big Lake |
Description: | Repaired 36 drain dips and 6 water bars. |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 9/13/2008 to 9/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls and Sandy River |
Description: | Repaired/created drainage system to divert active spring water from trail in area of annual slide area. Carried materials for Sandy River Guard Station repair. |
Volunteers |
Hours |
Bishop, Glenn | 15 |
Curtain, Gavin | 15 |
Curtain, Joe | 15 |
Gorman, Brian | 15 |
Owen, Kim | 19 |
Pekeider, Jay | 15 |
Philichi, Chris | 15 |
Philichi, Dylan | 15 |
Rhodehamel, Derek | 15 |
Project Total: 139 |
Project Date: | 9/13/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Jerry Bentz |
Location: | Breitenbush Lake to Park Ridge |
Description: | Removed 1 tree, cleaned 20 drain dips and 5 water bars. |
Volunteers |
Hours |
Bentz, Jerry | 11 |
Bonitz, Joe | 11 |
LaBelle, Rich | 11 |
Marshall, Ron | 11 |
Nelson, Brian | 11 |
Project Total: 55 |
Project Date: | 9/7/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Lolo Pass northbound |
Description: | Filled and repaired sunken trail just before cliff; removed slough and leveled trail 100'; cleared uphill side brush 25 feet; repaired two sections of trail past cliff where the tread was beginning to fail. |
Volunteers |
Hours |
Chelin, Chuck | 6 |
Cobb, Roberta | 7 |
Gifford, Bill | 9 |
Sakshaug, Arvid | 8 |
Project Total: 30 |
Project Date: | 8/30/2008 to 9/1/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Ernie Strahm |
Location: | Jude Lake to Breitenbush Lake |
Description: | Removed 30 trees, cleaned 15 drain dips and 6 water bars, repaired 1 slide damage and 1 mile of tread. |
Volunteers |
Hours |
Strahm, Ernie | 26 |
Strahm, Lori | 26 |
Project Total: 52 |
Project Date: | 8/26/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Cleared 8 trees, cleaned 12 drain dips and repaired 2 slides. Brushed 800'. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Fong, April Ann | 10 |
Karlgaard, Karl | 10 |
Murray, Michael | 11 |
Regehr, Don | 10 |
Riley, Dave | 10 |
Vhay, John | 10 |
Project Total: 71 |
Project Date: | 8/25/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag Canyon |
Description: | Cleared 2 trees, cleaned 82 drain dips and 6 water bars. Erected sign 16A behind Timberline Lodge. Removed sign 16 by amphitheater. |
Volunteers |
Hours |
Weston, Ruth | 8 |
Project Total: 8 |
Project Date: | 8/23/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Mount Hood Wilderness Boundary |
Description: | Cleared 40 trees, cleared 10 drain dips and 15 water bars, repared tread creep in areas along switchbacks. Used power brusher for 1/4 mile along Muddy Fork and detour. Repaired tread on the newly brushed section. Pink ribbon installed along detour and muddy area planked over. New signs installed at Top Spur, Ramona loop and both ends of the detour. |
Volunteers |
Hours |
Carter, Patty | 11 |
Chelin, Chuck | 9 |
Cobb, Roberta | 11 |
Hanes, Douglas | 11 |
Konner, Jack | 11 |
Martiny, Chuck | 11 |
O'Neil, Geoff | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Settlemeyer, Lois | 11 |
Stevenson, John | 11 |
Project Total: 119 |
Project Date: | 8/18/2008 to 8/20/2008 |
Agency: | Hood River Ranger District |
Leader: | Barb Adams |
Location: | Lolo Pass to Wahtum Lake |
Description: | Cleared over 60 trees (biggest 32"). Brushed where logs were and filled a few holes. |
Volunteers |
Hours |
Adams, Barb | 25 |
Adams, Dave | 25 |
Kenny, Harold | 26 |
Schembs, Jim | 7 |
Project Total: 83 |
Project Date: | 8/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Ramona Falls parking lot |
Description: | Removed 9 small trees. Scouting. |
Volunteers |
Hours |
Corwin, Susan | 6 |
Konner, Jack | 8 |
Project Total: 14 |
Project Date: | 8/9/2008 to 8/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to North Paradise Park Trail Junction |
Description: | Extensive tread repair in and north of Zig Zag Canyon. |
Volunteers |
Hours |
Bartley, Michael | 53 |
Cobb, Roberta | 18 |
Gerhardt, Kim | 45 |
Lee, Patty | 53 |
Nordyke, Jay | 53 |
Nordyke, Thomas | 53 |
Owen, Kim | 53 |
Person, Bill | 59 |
Weston, Ruth | 53 |
Project Total: 440 |
Project Date: | 8/8/2008 to 8/9/2008 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Wahtum Lake |
Description: | Logged out 45 trees using crosscut saws. Repaired 6 water bars at springs, brushed and improved trtead for 150'. |
Volunteers |
Hours |
Koppy, Larry | 23 |
Marriott, Tyler | 14 |
Pederson, Reed | 21 |
Regehr, Don | 23 |
Vhay, John | 23 |
West, Duane | 21 |
Project Total: 125 |
Project Date: | 8/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Paradise Park |
Description: | Worked upheill tread at Zig Zag Canyon bridge. Removed 2 large rocks near bridge. Removed 18 trees and repaired 2 drain dips and 50' of tread. |
Volunteers |
Hours |
Carr, Pete | 13 |
Corwin, Susan | 12 |
Vhay, John | 13 |
Weston, Ruth | 13 |
Project Total: 51 |
Project Date: | 7/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to 1/4 mile beyond "BEE" trail |
Description: | Scouting. Cleared 6 tree <12". |
Volunteers |
Hours |
Weston, Ruth | 9 |
Project Total: 9 |
Project Date: | 7/28/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Replaced 7 PCT signs, stashed 3 signs to be installed in sleeves in 2 weeks because of snow covering trails leading to PCT. |
Volunteers |
Hours |
Goodwin, Katie | 5 |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 15 |
Project Date: | 7/27/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass (and Top Spur Trail) |
Description: | Cleared 28 trees, brushed 1 miles, filled holes and removed debris. |
Volunteers |
Hours |
Beard, Dennis | 9 |
Carter, Patty | 9 |
Hanes, Douglas | 9 |
Konner, Jack | 9 |
Martiny, Chuck | 9 |
O'Neil, Geoff | 9 |
Plant, Steve | 9 |
Ranganathan, Nandini | 9 |
Squires, Bob | 9 |
Vhay, John | 9 |
Weston, Ruth | 9 |
Project Total: 99 |
Project Date: | 7/19/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | cleared 34 trees and cleaned 6 drain dips and 11 water bars. Extensive brushing and minor tread repair. |
Volunteers |
Hours |
Creelman, Kevin | 11 |
Goodwin, Ron | 11 |
Hanes, Douglas | 11 |
Luyan, Melissa | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Stevenson, John | 11 |
Project Total: 77 |
Project Date: | 7/18/2008 |
Agency: | Hood River Ranger District |
Leader: | Barb Adams |
Location: | Lolo Pass |
Description: | Minor drainage repair. Cleaned one culvert. Cleaned one water bar. |
Volunteers |
Hours |
Adams, Barb | 4 |
Adams, Dave | 4 |
Adams, Julie | 4 |
Project Total: 12 |
Project Date: | 7/18/2008 to 7/20/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 25 trees. Repaired 36 drain dips and 3 water bars. Brushed 200 yards and repaired 20 feet of tread. |
Volunteers |
Hours |
Auerbach, Paul | 21 |
Cunningham, John | 22 |
Fong, April Ann | 21 |
Kirchmiller, Christie | 19 |
Kirchmiller, Robert | 19 |
Owen, Kim | 14 |
Roe, David | 18 |
Young, Lee | 22 |
Project Total: 156 |
Project Date: | 7/17/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Scouting. |
Volunteers |
Hours |
Goodwin, Katie | 10 |
Goodwin, Ron | 10 |
Project Total: 20 |
Project Date: | 7/14/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 7/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge |
Description: | Scouting. . . SNOW! |
Volunteers |
Hours |
Van Gundy, Jackie | 5 |
Weston, Ruth | 5 |
Project Total: 10 |
Project Date: | 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Logout (20 trees) and drainage maintenance (26 drainage dips and 8 water bars) between Pinhead Saddle trailhead and north slope of North Pinhead Butte. |
Volunteers |
Hours |
Roe, David | 19 |
Project Total: 19 |
Project Date: | 7/11/2008 to 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Olallie Lake area and Triangle Lake Campground |
Description: | Removed 20 logs under 14". Brushed out huckleberry and removed rocks from the trail bed. Removed damaged corral poles from campground and cleaned up all the manure. |
Volunteers |
Hours |
Chemarin, Renee | 16 |
Heeter, Carol | 10 |
Lister, Norlene | 13 |
Patterson, Bob | 16 |
Schlitt, Barbara | 16 |
Turner, Linda | 13 |
Turner, Vince | 13 |
Warren, Jack | 16 |
Wilson, Carl | 16 |
Project Total: 129 |
Project Date: | 7/11/2008 to 7/12/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Lemiti Creek to Pinhead overlook |
Description: | Removed 32 trees. |
Volunteers |
Hours |
Gonzalas, Brittney | 22 |
Gonzalas, David | 22 |
Levy, Kathy | 13 |
Whitmyer, Dennis | 22 |
Wolf, Becky | 8 |
Project Total: 87 |
Project Date: | 7/11/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Guided two representatives of BARK to document conditions of Skyline Road and PCT in vicinity of Pinhead Buttes |
Volunteers |
Hours |
Roe, David | 8 |
Project Total: 8 |
Project Date: | 7/10/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Springs Indian Reservation |
Description: | Flagged trail from Lemiti Bute to Lemiti Meadows for tomorrow's work party. |
Volunteers |
Hours |
Roe, David | 8 |
Project Total: 8 |
Project Date: | 7/10/2008 to 7/12/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Sandy River |
Description: | Cleared 8 trees (6" to 10"). Repaired 10 drain dips, 100 yard of slide damage, 100 yards of brushing and 300 yards of tread. |
Volunteers |
Hours |
Cohoe, Kelly | 26 |
Cohoe, Michael | 23 |
Cohoe, Philip | 23 |
Janzen, Andrew | 23 |
Janzen, Paul | 23 |
Jespersen, Kyle | 23 |
Johnson, Gabriel | 23 |
Owen, Kim | 26 |
Sathrum, John | 23 |
Smith, Greg | 23 |
Smith, Tom | 23 |
Project Total: 259 |
Project Date: | 7/6/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass south |
Description: | Cleared 60 trees in 3 miles, 8" to 12". Light brushing. |
Volunteers |
Hours |
Cobb, Roberta | 9 |
Martiny, Chuck | 10 |
Towill, Elizabeth | 9 |
Project Total: 28 |
Project Date: | 7/4/2008 to 7/6/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Warm Spring Indian Reservation |
Description: | Scouting work between Warm Spring River and Lemiti Butte |
Volunteers |
Hours |
Roe, David | 20 |
Project Total: 20 |
Project Date: | 7/3/2008 to 7/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 6 logs. |
Volunteers |
Hours |
Owen, Kim | 17 |
Owen, Pam | 17 |
Project Total: 34 |
Project Date: | 7/2/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Hood River Ranger Station |
Description: | Meeting to discuss bike races between Twin Lakes and Palmateer. |
Volunteers |
Hours |
Adams, Barb | 7 |
Cobb, Roberta | 8 |
Vhay, John | 8 |
Project Total: 23 |
Project Date: | 7/2/2008 |
Agency: | Hood River Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Lolo Pass |
Description: | Scouting |
Volunteers |
Hours |
Konner, Jack | 7 |
Project Total: 7 |
Project Date: | 6/30/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Cloeared 18 trees in two miles (< 8"). Posted logs at the junction with Frog Lake trail, at the junction to the trailhead spur, and at the Hwy 26 crossing (just a sticker, did not have the ful size platic logo). Picked up lots of litter. |
Volunteers |
Hours |
Cobb, Roberta | 10 |
Weston, Ruth | 9 |
Project Total: 19 |
Project Date: | 6/15/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Cleared 8 trees. Brushed rhododendron and vine maple for half mile. |
Volunteers |
Hours |
Moore, Mickey | 10 |
Walker, Ford | 10 |
Walker, Penny | 10 |
Walker, Richard | 10 |
Project Total: 40 |
Project Date: | 5/18/2008 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake |
Description: | Cleared 2 trees from Frog Lake to the first switchback at which point snow prevented further progress. |
Volunteers |
Hours |
Cobb, Roberta | 5 |
Project Total: 5 |
Project Date: | 5/3/2008 |
Agency: | Clackamas River Ranger District |
Leader: | David Roe |
Location: | Clackamas River ranger district |
Description: | Chainsaw recertificaton at Estacada Ranger Station. |
Volunteers |
Hours |
Roe, David | 9 |
Project Total: 9 |
Project Date: | 4/18/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Clackama River trail |
Description: | Trail maintenance workshop. Focus on drainage. Roger Bell on site. |
Volunteers |
Hours |
DeVall, Marty | 9 |
Roe, David | 10 |
Sischo, Gary | 9 |
Wolf, Becky | 9 |
Project Total: 37 |
Project Date: | 3/22/2008 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Estacad Ranger Station |
Description: | CPR Training |
Volunteers |
Hours |
Farrier, Bruce | 8 |
Farrier, Melissa | 8 |
Lister, Norlene | 8 |
Livermore, Stacey | 8 |
Schlitt, Barbara | 8 |
Turner, Linda | 8 |
Wolf, Becky | 7 |
Project Total: 55 |
Project Date: | 11/16/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls loop |
Description: | Removed 2 trees (14" and 18"). Repaired 6 water bars and 1 root wad damage. Cleaned under Ramona Creek log bridge. |
Volunteers |
Hours |
Owen, Kim | 10 |
Richard, Jeff | 10 |
Project Total: 20 |
Project Date: | 10/15/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge area |
Description: | Removed and lay down locked signs before snow grooming machines operate. |
Volunteers |
Hours |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 10 |