Mount Hood Chapter, Pacific Crest Trail Association
Activity Report
1/1/2008 to 12/31/2008 (Generated 1/25/2009)

Activity Summary

Administration: 509
Meeting: 301
Scouting: 158
Signing: 49
Teaching: 95
Tools: 56
Trail Maintenance (Feeder): 415
Trail Maintenance (Other): 605
Trail Maintenance (PCT): 4853
Trail Protection: 39
Training: 255


Total Volunteer Hours: 7335

Activity Detail (most recent on top)

Project Date: 12/7/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 5
Carr, Pete 6
Hawley, Bill 6
Marriott, Tyler 5
Nelson, Brian 3
Nelson, Heather 3

Project Total: 28

Project Date: 11/30/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 7

Project Total: 7

Project Date: 11/3/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Ruth Weston
Location: Oneanta trail head to Triple Falls Bridge
Description: Dismantled Triple Falls bridge. Brushed for one mile further up the trail. Saved planks and rails for the new bridge and stashed them.

Volunteers

Hours
Beard, Dennis 8
Brown, Maureen 8
Carr, Pete 8
Cobb, Roberta 8
Davidson, Tom 8
Hanes, Douglas 8
Hawley, Bill 8
Hilbert, Johanna 8
Hilbert, Justin 8
Nemchick, Hal 8
Ranganathan, Nandini 8
Warner, Sam 9
Weston, Ruth 8

Project Total: 105

Project Date: 10/28/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: 3 miles south of Crest Camp
Description: Cleared 30" rotten log. Cleaned and rebuilt 7 drain dips, power brushed 3/4 mile of huckleberry and vine maple near Bill Butte.

Volunteers

Hours
Carr, Pete 8
Hawley, Bill 9

Project Total: 17

Project Date: 10/15/2008 to 10/17/2008
Agency: Hood River Ranger District
Activity Type: Trail Protection
Leader: David Roe
Location: Indian Mountain
Description: EIS review. Review plans to relocate and make permanent Indian Mountain repeater site. Determined maintenance requirements for Indian Springs Trail. Determined maintenance requirements for PCT south of Buck Peak.

Volunteers

Hours
Roe, David 27

Project Total: 27

Project Date: 10/10/2008 to 10/12/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Berry Mountain
Description: Logged out 1 tree, built or cleaned 19 drain dips, repaired 3 water bars, brushed 1.25 miles of huckleberry and small conifers, widened 800 feet of tread.

Volunteers

Hours
Carr, Pete 22
Chelin, Chuck 21
Cunningham, John 30
Doyle, Tim 15
Hawley, Bill 45
Jaroch, Eric 22

Project Total: 155

Project Date: 10/9/2008 to 10/12/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: Road 4220 south for 1/2 mile
Description: Removed 4 trees, repaired 1 rock slide, 2 root wads and 1/2 mile of tread.

Volunteers

Hours
Gehring, Dave 30
Gehring, Lance 30
Gehring, Mikah 30
Henderson, Blake 30
Strahm, Ernie 30

Project Total: 150

Project Date: 10/8/2008 to 10/9/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Drainage maintenance (8 water bars) south of Warm Springs River. Documented current conditions at Triangle Lake Horse Camp.

Volunteers

Hours
Roe, David 20

Project Total: 20

Project Date: 10/1/2008 to 10/2/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Indian Heaven
Description: Logged 20 trees and cleaned out over 100 drain dips from road 24 to Junction Lake.

Volunteers

Hours
Hawley, Bill 21
Winkel, Jeannette 11

Project Total: 32

Project Date: 9/29/2008
Agency: Zig Zag Ranger District
Activity Type: Signing
Leader: Ron Goodwin
Location: Timberline Lodge
Description: Removed PCT signs a junctions before the snows come and groomers come over the area. Numbered each post and sleeve for easy locating next summer.

Volunteers

Hours
Goodwin, Ron 6
Weston, Ruth 6

Project Total: 12

Project Date: 9/26/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Cleaned 90 drain dips and 21 water bars. Repaired 100' of tread.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 9/24/2008 to 9/28/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Sheep Lake Trail Relocation
Description: Completed relocation of trail.

Volunteers

Hours
Anderson, Jim 13
Arkes, Bob 20
Arkes, Jane 7
Barberis, Joe 18
Beard, Dennis 27
Carr, Pete 29
Chelin, Chuck 26
Cobb, Roberta 12
Cunningham, John 18
Gifford, Bill 18
Hammack, Brice 18
Hawley, Bill 56
Hawley, Karla 29
Heid, David 17
Hite, Don 9
Hovin, Leif 12
Irwin, Mark 18
Linde, Tom 6
Merrifield, John 18
Mikol, Greg 17
Tyler, Kerri 12
Webb, Jim 18
Winkel, Jeannette 9

Project Total: 427

Project Date: 9/21/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: North Face crew. Cleared ivy, logs and pre-cut brsh for 1/2 mile. Rebuilt tread slide damage at stup at top of Tanner Creek switchbacks. Cut low-hanging limbs. Built 30' macadam with drainage at spring crossing and top with 3/4- gravel.

Volunteers

Hours
Adelman, Jeff 10
Adelman, LT 10
Brueggermeyer, Marcia 9
Cunningham, John 11
Hawley, Bill 15
Leahy, Erin 10
Nelson, Joan 11
O'Donnell, Erin 10

Project Total: 86

Project Date: 9/20/2008
Agency: Hood River Ranger District
Activity Type: Scouting
Leader: John Vhay
Location: Chinidere shortcut to PCT from Eagle Creek
Description: Scouiting trip to evaluate possible American Hiking Society Volunteer Vacation work party in 2009.

Volunteers

Hours
Karlgaard, Karl 7
Vhay, John 7

Project Total: 14

Project Date: 9/19/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: Material and tools pickup.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 9/18/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Olallie Lake to Big Lake
Description: Repaired 36 drain dips and 6 water bars.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 9/16/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: Power brushing and removing dead fall. Cut out 4 ivy-covered leaner/overhangs.

Volunteers

Hours
Hawley, Bill 9
Martiny, Chuck 9

Project Total: 18

Project Date: 9/16/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Protection
Leader: Brice Hammack
Location: Gifford Pinchot headquarters
Description: Inventory of private parcels within ½ mile of the Pacific Crest Trail in Gifford Pinchot NF.

Volunteers

Hours
Hammack, Brice 4
Hawley, Bill 4
Linde, Tom 4

Project Total: 12

Project Date: 9/13/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jerry Bentz
Location: Breitenbush Lake to Park Ridge
Description: Removed 1 tree, cleaned 20 drain dips and 5 water bars.

Volunteers

Hours
Bentz, Jerry 11
Bonitz, Joe 11
LaBelle, Rich 11
Marshall, Ron 11
Nelson, Brian 11

Project Total: 55

Project Date: 9/13/2008 to 9/14/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Falls and Sandy River
Description: Repaired/created drainage system to divert active spring water from trail in area of annual slide area. Carried materials for Sandy River Guard Station repair.

Volunteers

Hours
Bishop, Glenn 15
Curtain, Gavin 15
Curtain, Joe 15
Gorman, Brian 15
Owen, Kim 19
Pekeider, Jay 15
Philichi, Chris 15
Philichi, Dylan 15
Rhodehamel, Derek 15

Project Total: 139

Project Date: 9/12/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: Clearing. Measuring. Materials List.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 9/10/2008
Agency: N/A
Activity Type: Meeting
Leader: Jack Konner
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 10 caretakers attended the September caretaker meeting at REI Clackamas Town Center. Also in attendance, Kim Gerhardt as a guest of Ruth Weston.

Volunteers

Hours
Bentz, Jerry 4
Cobb, Roberta 4
Hammack, Brice 4
Hawley, Bill 4
Konner, Jack 4
Owen, Pam 4
Plant, Steve 4
Webb, Jim 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 40

Project Date: 9/8/2008
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: Scouting. Cleared 3 small logs. Cut low hanging limbs.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 9/7/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Lolo Pass northbound
Description: Filled and repaired sunken trail just before cliff; removed slough and leveled trail 100'; cleared uphill side brush 25 feet; repaired two sections of trail past cliff where the tread was beginning to fail.

Volunteers

Hours
Chelin, Chuck 6
Cobb, Roberta 7
Gifford, Bill 9
Sakshaug, Arvid 8

Project Total: 30

Project Date: 9/2/2008 to 9/5/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Trail Relocation near Sheep Lake
Description: Flagging and brushing to avoid cutting several large trees. Removed all stumps in the north half of the relocated trail (80+). Cleared and formed over 400' of tread. Removed 12 small leaners for equestrians. Built 14 drain dips. Installed 3 water bars and 4 check steps. Cut back uphill huckleberry and low hanging limbs. Removed bermand filled tread as neeed.

Volunteers

Hours
Anderson, Jim 12
Arkes, Bob 30
Beard, Dennis 12
Brueggermeyer, Marcia 10
Carr, Pete 31
Cobb, Roberta 13
Gurwell, Bill 16
Hawley, Bill 40
Hawley, Karla 27
Mikol, Greg 12
Warner, Sam 13
Webb, Jim 10

Project Total: 226

Project Date: 9/1/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Trail Relocation near Sheep Lake
Description: Cleared 1/4 mile of forest for trail relocation.

Volunteers

Hours
Hawley, Bill 13
Martiny, Chuck 13
Winkel, Jeannette 13

Project Total: 39

Project Date: 9/1/2008
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Bill Hawley
Location: Trail 400 west of Tanner Creek
Description: Scouting.

Volunteers

Hours
Hawley, Bill 9

Project Total: 9

Project Date: 8/30/2008 to 9/1/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Removed 30 trees, cleaned 15 drain dips and 6 water bars, repaired 1 slide damage and 1 mile of tread.

Volunteers

Hours
Strahm, Ernie 26
Strahm, Lori 26

Project Total: 52

Project Date: 8/29/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Trail Relocation near Sheep Lake
Description: Cleared 1/4 mile of forest for trail relocation.

Volunteers

Hours
Hawley, Bill 13
Martiny, Chuck 13

Project Total: 26

Project Date: 8/26/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: John Vhay
Location: Wahtum Lake
Description: Cleared 8 trees, cleaned 12 drain dips and repaired 2 slides. Brushed 800'.

Volunteers

Hours
Arkes, Bob 10
Fong, April Ann 10
Karlgaard, Karl 10
Murray, Michael 11
Regehr, Don 10
Riley, Dave 10
Vhay, John 10

Project Total: 71

Project Date: 8/25/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag Canyon
Description: Cleared 2 trees, cleaned 82 drain dips and 6 water bars. Erected sign 16A behind Timberline Lodge. Removed sign 16 by amphitheater.

Volunteers

Hours
Weston, Ruth 8

Project Total: 8

Project Date: 8/23/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Mount Hood Wilderness Boundary
Description: Cleared 40 trees, cleared 10 drain dips and 15 water bars, repared tread creep in areas along switchbacks. Used power brusher for 1/4 mile along Muddy Fork and detour. Repaired tread on the newly brushed section. Pink ribbon installed along detour and muddy area planked over. New signs installed at Top Spur, Ramona loop and both ends of the detour.

Volunteers

Hours
Carter, Patty 11
Chelin, Chuck 9
Cobb, Roberta 11
Hanes, Douglas 11
Konner, Jack 11
Martiny, Chuck 11
O'Neil, Geoff 11
Plant, Steve 11
Ranganathan, Nandini 11
Settlemeyer, Lois 11
Stevenson, John 11

Project Total: 119

Project Date: 8/20/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Three Corner Rock to Carpenter Lake Trail Junction
Description: Log out.

Volunteers

Hours
Crouse, Bill 11
Hammack, Brice 12
Martiny, Chuck 12
Murphy, Des 11
Walker, Richard 11

Project Total: 57

Project Date: 8/19/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bob Arkes
Location: Williams Mine Trail to Stagman Ridge Trail
Description: Cleared 22 threes. Minor brushing, water bar cleaning and tread repair accomplished.

Volunteers

Hours
Arkes, Bob 14
Hawley, Bill 14
Hilands, Bill 14
Sakshaug, Arvid 14
Vhay, John 14
Warner, Sam 14
Webb, Jim 11

Project Total: 95

Project Date: 8/18/2008 to 8/20/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass to Wahtum Lake
Description: Cleared over 60 trees (biggest 32"). Brushed where logs were and filled a few holes.

Volunteers

Hours
Adams, Barb 25
Adams, Dave 25
Kenny, Harold 26
Schembs, Jim 7

Project Total: 83

Project Date: 8/14/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Ramona Falls parking lot
Description: Removed 9 small trees. Scouting.

Volunteers

Hours
Corwin, Susan 6
Konner, Jack 8

Project Total: 14

Project Date: 8/13/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 9 caretakers attended the August caretaker meeting at REI Clackamas Town Center. Also in attendance, Dana Berthold (PCTA regional representative) and Ron Northway (Trailkeepers of Oregon executive director).

Volunteers

Hours
Arkes, Bob 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Konner, Jack 4
Queen, Steve 4
Vhay, John 4
Webb, Jim 4
Wolf, Becky 4

Project Total: 36

Project Date: 8/9/2008 to 8/13/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to North Paradise Park Trail Junction
Description: Extensive tread repair in and north of Zig Zag Canyon.

Volunteers

Hours
Bartley, Michael 53
Cobb, Roberta 18
Gerhardt, Kim 45
Lee, Patty 53
Nordyke, Jay 53
Nordyke, Thomas 53
Owen, Kim 53
Person, Bill 59
Weston, Ruth 53

Project Total: 440

Project Date: 8/8/2008 to 8/10/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Junction Lake south
Description: Cleared 38 trees using crosscut saws. Cleaned 22 draindipts and installed 11 log and/or rock check-steps with drainage. Brushed half mile of huckleberry and fir. Widened and filled 450' of tread.

Volunteers

Hours
Carr, Pete 27
Cunningham, John 22
Hawley, Bill 33
Hawley, Karla 33
Irwin, Mark 22
Lameka, Ann 17
Shefler, Gerald 14
Winkel, Jeannette 14

Project Total: 182

Project Date: 8/8/2008 to 8/9/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: John Vhay
Location: Wahtum Lake
Description: Logged out 45 trees using crosscut saws. Repaired 6 water bars at springs, brushed and improved trtead for 150'.

Volunteers

Hours
Koppy, Larry 23
Marriott, Tyler 14
Pederson, Reed 21
Regehr, Don 23
Vhay, John 23
West, Duane 21

Project Total: 125

Project Date: 8/4/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: North of Crest Camp
Description: Cleared 5 trees using crosscut saw. Delivered cool drinks to AmeriCorps crew.

Volunteers

Hours
Hawley, Bill 8
Hawley, Karla 8
Legg, Stuart 8

Project Total: 24

Project Date: 8/4/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park
Description: Worked upheill tread at Zig Zag Canyon bridge. Removed 2 large rocks near bridge. Removed 18 trees and repaired 2 drain dips and 50' of tread.

Volunteers

Hours
Carr, Pete 13
Corwin, Susan 12
Vhay, John 13
Weston, Ruth 13

Project Total: 51

Project Date: 8/1/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Indian Heaven
Description: AmeriCorps crew orientation.

Volunteers

Hours
Hawley, Bill 7

Project Total: 7

Project Date: 7/31/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Indian Heaven
Description: Removed 6 trees (8" to 22") in Wilderness.

Volunteers

Hours
Hawley, Bill 13
Hawley, Karla 11
Shefler, Gerald 13
Winkel, Jeannette 13

Project Total: 50

Project Date: 7/29/2008
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Ruth Weston
Location: Timberline Lodge to 1/4 mile beyond "BEE" trail
Description: Scouting. Cleared 6 tree <12".

Volunteers

Hours
Weston, Ruth 9

Project Total: 9

Project Date: 7/28/2008
Agency: Zig Zag Ranger District
Activity Type: Signing
Leader: Ron Goodwin
Location: Timberline Lodge
Description: Replaced 7 PCT signs, stashed 3 signs to be installed in sleeves in 2 weeks because of snow covering trails leading to PCT.

Volunteers

Hours
Goodwin, Katie 5
Goodwin, Ron 5
Weston, Ruth 5

Project Total: 15

Project Date: 7/27/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Lolo Pass (and Top Spur Trail)
Description: Cleared 28 trees, brushed 1 miles, filled holes and removed debris.

Volunteers

Hours
Beard, Dennis 9
Carter, Patty 9
Hanes, Douglas 9
Konner, Jack 9
Martiny, Chuck 9
O'Neil, Geoff 9
Plant, Steve 9
Ranganathan, Nandini 9
Squires, Bob 9
Vhay, John 9
Weston, Ruth 9

Project Total: 99

Project Date: 7/23/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: East Crater Trail and Road 60
Description: Cleared trees.

Volunteers

Hours
Hawley, Bill 12
Hawley, Karla 11
Martiny, Chuck 9
Winkel, Jeannette 9

Project Total: 41

Project Date: 7/19/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: cleared 34 trees and cleaned 6 drain dips and 11 water bars. Extensive brushing and minor tread repair.

Volunteers

Hours
Creelman, Kevin 11
Goodwin, Ron 11
Hanes, Douglas 11
Luyan, Melissa 11
Plant, Steve 11
Ranganathan, Nandini 11
Stevenson, John 11

Project Total: 77

Project Date: 7/18/2008 to 7/20/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Cleared 25 trees. Repaired 36 drain dips and 3 water bars. Brushed 200 yards and repaired 20 feet of tread.

Volunteers

Hours
Auerbach, Paul 21
Cunningham, John 22
Fong, April Ann 21
Kirchmiller, Christie 19
Kirchmiller, Robert 19
Owen, Kim 14
Roe, David 18
Young, Lee 22

Project Total: 156

Project Date: 7/18/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass
Description: Minor drainage repair. Cleaned one culvert. Cleaned one water bar.

Volunteers

Hours
Adams, Barb 4
Adams, Dave 4
Adams, Julie 4

Project Total: 12

Project Date: 7/17/2008
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Scouting.

Volunteers

Hours
Goodwin, Katie 10
Goodwin, Ron 10

Project Total: 20

Project Date: 7/14/2008 to 7/17/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Road 2090 to Road 2000
Description: Completely refurbished trail with crew of high school students form the Forest Youth Success Program working out of Carson Washington.

Volunteers

Hours
Hammack, Brice 28

Project Total: 28

Project Date: 7/14/2008
Agency: Hood River Ranger District
Activity Type: Scouting
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 7/13/2008
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Ruth Weston
Location: Timberline Lodge
Description: Scouting. . . SNOW!

Volunteers

Hours
Van Gundy, Jackie 5
Weston, Ruth 5

Project Total: 10

Project Date: 7/12/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Logout (20 trees) and drainage maintenance (26 drainage dips and 8 water bars) between Pinhead Saddle trailhead and north slope of North Pinhead Butte.

Volunteers

Hours
Roe, David 19

Project Total: 19

Project Date: 7/11/2008
Agency: Clackamas River Ranger District
Activity Type: Scouting
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Guided two representatives of BARK to document conditions of Skyline Road and PCT in vicinity of Pinhead Buttes

Volunteers

Hours
Roe, David 8

Project Total: 8

Project Date: 7/11/2008 to 7/12/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Lemiti Creek to Pinhead overlook
Description: Removed 32 trees.

Volunteers

Hours
Gonzalas, Brittney 22
Gonzalas, David 22
Levy, Kathy 13
Whitmyer, Dennis 22
Wolf, Becky 8

Project Total: 87

Project Date: 7/11/2008 to 7/12/2008
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Olallie Lake area and Triangle Lake Campground
Description: Removed 20 logs under 14". Brushed out huckleberry and removed rocks from the trail bed. Removed damaged corral poles from campground and cleaned up all the manure.

Volunteers

Hours
Chemarin, Renee 16
Heeter, Carol 10
Lister, Norlene 13
Patterson, Bob 16
Schlitt, Barbara 16
Turner, Linda 13
Turner, Vince 13
Warren, Jack 16
Wilson, Carl 16

Project Total: 129

Project Date: 7/10/2008 to 7/12/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Falls to Sandy River
Description: Cleared 8 trees (6" to 10"). Repaired 10 drain dips, 100 yard of slide damage, 100 yards of brushing and 300 yards of tread.

Volunteers

Hours
Cohoe, Kelly 26
Cohoe, Michael 23
Cohoe, Philip 23
Janzen, Andrew 23
Janzen, Paul 23
Jespersen, Kyle 23
Johnson, Gabriel 23
Owen, Kim 26
Sathrum, John 23
Smith, Greg 23
Smith, Tom 23

Project Total: 259

Project Date: 7/10/2008
Agency: Clackamas River Ranger District
Activity Type: Scouting
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Flagged trail from Lemiti Bute to Lemiti Meadows for tomorrow's work party.

Volunteers

Hours
Roe, David 8

Project Total: 8

Project Date: 7/9/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 5 caretakers attended the July caretaker meeting at REI Clackamas Town Center. Also in attendance was Jennifer Tripp (PCTA main office in Sacramento).

Volunteers

Hours
Allen, Eric 4
Bentz, Jerry 4
Goodwin, Ron 4
Plant, Steve 4
Queen, Steve 4

Project Total: 20

Project Date: 7/7/2008 to 7/9/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bob Arkes
Location: Road #23 to Wilderness Boundary
Description: Cleared 18 trees. Repaired 49 drain dips, brushed a mile and repaired a half mile of tread to Williams Mine.

Volunteers

Hours
Arkes, Bob 27
Barberis, Joe 18
Merrifield, John 18
Vhay, John 18

Project Total: 81

Project Date: 7/6/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: East Crater Trail and Road 60
Description: Cleared trees up to snow line.

Volunteers

Hours
Hawley, Bill 8
Winkel, Jeannette 8

Project Total: 16

Project Date: 7/6/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Cleared 60 trees in 3 miles, 8" to 12". Light brushing.

Volunteers

Hours
Cobb, Roberta 9
Martiny, Chuck 10
Towill, Elizabeth 9

Project Total: 28

Project Date: 7/4/2008 to 7/6/2008
Agency: Clackamas River Ranger District
Activity Type: Scouting
Leader: David Roe
Location: Warm Spring Indian Reservation
Description: Scouting work between Warm Spring River and Lemiti Butte

Volunteers

Hours
Roe, David 20

Project Total: 20

Project Date: 7/3/2008 to 7/4/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Cleared 6 logs.

Volunteers

Hours
Owen, Kim 17
Owen, Pam 17

Project Total: 34

Project Date: 7/2/2008
Agency: Hood River Ranger District
Activity Type: Meeting
Leader: Roberta Cobb
Location: Hood River Ranger Station
Description: Meeting to discuss bike races between Twin Lakes and Palmateer.

Volunteers

Hours
Adams, Barb 7
Cobb, Roberta 8
Vhay, John 8

Project Total: 23

Project Date: 7/2/2008
Agency: Hood River Ranger District
Activity Type: Scouting
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 6/30/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Frog Lake north
Description: Cloeared 18 trees in two miles (< 8"). Posted logs at the junction with Frog Lake trail, at the junction to the trailhead spur, and at the Hwy 26 crossing (just a sticker, did not have the ful size platic logo). Picked up lots of litter.

Volunteers

Hours
Cobb, Roberta 10
Weston, Ruth 9

Project Total: 19

Project Date: 6/29/2008 to 7/2/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Road 2090 to Sedum Ridge
Description: Trail work with AmeriCorps crew.

Volunteers

Hours
Hammack, Brice 41

Project Total: 41

Project Date: 6/28/2008
Agency: Mount Adams Ranger District
Activity Type: Teaching
Leader: Bill Hawley
Location: Crosscut and chainsaw certification (Road 2070)
Description: Certified sawyers in chainsaw and croscut saw use.

Volunteers

Hours
Cunningham, John 4
Hawley, Bill 12
Owen, Kim 9

Project Total: 25

Project Date: 6/28/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Road 2090 south
Description: Cleared 32 trees (24: 4"-10", 8: 10"-18")

Volunteers

Hours
Anderson, Roger 11
Arkes, Bob 11
Cobb, Roberta 11
Cunningham, John 7
Hawley, Bill 3
Hawley, Karla 13
Owen, Kim 2
Sakshaug, Arvid 11
Vhay, John 11
Winkel, Jeannette 12

Project Total: 92

Project Date: 6/25/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Road 2090 to Road 2070
Description: Cleared 52 trees, repaired drain dips, 2 slides, 1 root wad and light with spot brushing and tread repair.

Volunteers

Hours
Doty, Pat 10
Hammack, Brice 10
Martiny, Chuck 10
Murphy, Des 10
Walker, Richard 10

Project Total: 50

Project Date: 6/15/2008
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Cleared 8 trees. Brushed rhododendron and vine maple for half mile.

Volunteers

Hours
Moore, Mickey 10
Walker, Ford 10
Walker, Penny 10
Walker, Richard 10

Project Total: 40

Project Date: 6/15/2008
Agency: N/A
Activity Type: Training
Leader: Kim Owen
Location: Badger Creek Wilderness
Description: Crosscut saw training

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 6/14/2008
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Brice Hammack
Location: Road 2090 to Three Corner Rock
Description: Scouted Road 2090 to Three Corner Rock. More than n ormal nukmber of trees down.

Volunteers

Hours
Hammack, Brice 10
McLaughlin, Larry 10

Project Total: 20

Project Date: 6/13/2008 to 8/15/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Crest Camp to Panther Creek
Description: Miscellaneous hours reported by Tom Linde for June 13, 19, 23, July 11, 28, 29, August 7, 12, 14, 15.

Volunteers

Hours
Linde, Tom 94

Project Total: 94

Project Date: 6/11/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 10 caretakers attended the June caretaker meeting at REI Clackamas Town Center.

Volunteers

Hours
Arkes, Bob 4
Bentz, Jerry 4
Cobb, Roberta 4
Konner, Jack 4
Owen, Kim 4
Owen, Pam 4
Plant, Steve 4
Queen, Steve 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 40

Project Date: 6/8/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Bridge of the Gods to I-84 Overpass
Description: Reshaped 200 feet of steep side slope tread, rebuilt 2 drainages ways, removed 1 root wad, power brushed 200 yards of trail, removed barbed wire and old crushed fencing, installed roofing on steps leading down from bridge, removed invasive plants (ivy), removed organics, widened tread and installed base rock in wet problem areas, layed geo-clothe in problem areas, installed 4x4 PT border and pinned with 1/2" rebar, spread 12 yards of gravel and compaced with plate compactor, dressed with 1/4" gravel.

Volunteers

Hours
Arkes, Bob 9
Arkes, Jane 9
Chelin, Chuck 10
Cobb, Roberta 9
Goodwin, Katie 9
Goodwin, Ron 9
Hawley, Bill 39
Hawley, Karla 5
Hilands, Bill 9
Koppy, Larry 9
Lameka, Ann 9
Marriott, Tyler 9
Matzke, Jim 10
Niece, Ron 11
Queen, Steve 7
Settlemeyer, Lois 5
Sohler, Don 9

Project Total: 177

Project Date: 5/26/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Road 2000 south
Description: Cleared 43 logs (20: <8", 23: 8" - 24")

Volunteers

Hours
Cunningham, John 9
Hawley, Bill 10

Project Total: 19

Project Date: 5/24/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Chainsaw certification (Road 2070)
Description: 6 volunteers participated in a chainsaw re-certification session.

Volunteers

Hours
Chelin, Chuck 10
Cobb, Roberta 7
Doty, Pat 11
Maddox, Ken 9
Owen, Kim 8
Owen, Pam 8

Project Total: 53

Project Date: 5/24/2008
Agency: Mount Adams Ranger District
Activity Type: Signing
Leader: Bill Hawley
Location: Chainsaw certification (Road 2070)
Description: 2 volunteers re-certifed other volunteers

Volunteers

Hours
Cunningham, John 11
Hawley, Bill 11

Project Total: 22

Project Date: 5/24/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Road 2070 north
Description: Cleared 60 logs north until the snow made the trail impassible.

Volunteers

Hours
Queen, Steve 11
Sakshaug, Arvid 11

Project Total: 22

Project Date: 5/18/2008
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Frog Lake
Description: Cleared 2 trees from Frog Lake to the first switchback at which point snow prevented further progress.

Volunteers

Hours
Cobb, Roberta 5

Project Total: 5

Project Date: 5/16/2008 to 5/18/2008
Agency: N/A
Activity Type: Teaching
Leader: Kim Owen
Location: Westfir - High Cascades Training
Description: Developed curriculm for training and certifying crosscut sawyers at the A and B level for wilderness log outs on the PCT. During the Westfir even, re-certified two sawyers at the B level and certified five new crosscut sawyers at the A level.

Volunteers

Hours
Hawley, Bill 38
Owen, Kim 32

Project Total: 70

Project Date: 5/14/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 16 caretakers attended the May caretaker meeting at REI Clackamas Town Center.

Volunteers

Hours
Allen, Eric 3
Arkes, Bob 3
Bentz, Jerry 3
Cunningham, John 3
Goodwin, Ron 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 3
Owen, Kim 3
Plant, Steve 3
Queen, Steve 3
Vhay, John 3
Webb, Jim 3
Weston, Ruth 3
Wolf, Becky 3

Project Total: 45

Project Date: 5/13/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Herman Creek to Wilderness Boundary
Description: Cleared limbs and logs. Emoved a large hanging log. Cleared to the snow at 2800'.

Volunteers

Hours
Carr, Pete 10
Chelin, Chuck 10
Hawley, Bill 10
Martiny, Chuck 10

Project Total: 40

Project Date: 5/10/2008
Agency: Mount Adams Ranger District
Activity Type: Training
Leader: Bill Hawley
Location: Chainsaw Certification (Wind River)
Description: Wind River chainsaw certification II

Volunteers

Hours
Beard, Dennis 8
Carter, Patty 9
Hawley, Bill 13
Heid, David 9
Konner, Jack 9
Linde, Tom 8
Moeller, Dan 6
O'Neil, Geoff 9

Project Total: 71

Project Date: 5/10/2008
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Brice Hammack
Location: Road 43 to Wind River Road
Description: Cleared 29 trees. General brushing.

Volunteers

Hours
Hammack, Brice 10
Martiny, Chuck 10
McLaughlin, Larry 10
Mullen, David 10
Murphy, Des 10

Project Total: 50

Project Date: 5/3/2008
Agency: Clackamas River Ranger District
Activity Type: Training
Leader: David Roe
Location: Clackamas River ranger district
Description: Chainsaw recertificaton at Estacada Ranger Station.

Volunteers

Hours
Roe, David 9

Project Total: 9

Project Date: 4/27/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Bill Hawley
Location: Trail 400 (PCT to Eagle Creek)
Description: Repaired 7 drain dips and 4 minor rock slides (70'). Brushed for 1 mile and repaired tread at multiple locations (1/4 mile total)

Volunteers

Hours
Bronsein, Bill 8
Chelin, Chuck 9
Cunningham, John 10
Dods, Jane 11
Echter, Anna 9
Gifford, Bill 8
Hawley, Bill 11

Project Total: 66

Project Date: 4/19/2008
Agency: Mount Adams Ranger District
Activity Type: Training
Leader: Bill Hawley
Location: Chainsaw Certification (Wind River Work Center)
Description: 9 volunteers participated in a chainsaw recertification course at the Wind River Work Center.

Volunteers

Hours
Arkes, Bob 8
Cunningham, John 8
Goodwin, Ron 6
Hammack, Brice 6
Hawley, Bill 9
Martiny, Chuck 8
McLaughlin, Larry 6
Walker, Richard 6
Webb, Jim 6

Project Total: 63

Project Date: 4/18/2008
Agency: Clackamas River Ranger District
Activity Type: Training
Leader: Becky Wolf
Location: Clackama River trail
Description: Trail maintenance workshop. Focus on drainage. Roger Bell on site.

Volunteers

Hours
DeVall, Marty 9
Roe, David 10
Sischo, Gary 9
Wolf, Becky 9

Project Total: 37

Project Date: 4/14/2008
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Bill Hawley
Location: Herman Creek to Hatfield Wilderness
Description: Scouted Herman Creek to Hatfield Wilderness. Maps and crew planning.

Volunteers

Hours
Hawley, Bill 11

Project Total: 11

Project Date: 4/13/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Herman Creek junction to Hatfield Wilderness
Description: Cleared 24 trees (1: 26", 2: 14", 7: 6"-12", 14: <6"). Cleaned 25 drain dips. Brushed vine maple throughout.

Volunteers

Hours
Carr, Pete 11
Chelin, Chuck 11
Hawley, Bill 14
Martiny, Chuck 10

Project Total: 46

Project Date: 4/10/2008
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Bill Hawley
Location: Wind River, Trail 400
Description: Delivered tools to Wind River tool cache. Took inventory. Scouted Brice's section looking for logs for 4/19 project. Scouted Trail 400

Volunteers

Hours
Hawley, Bill 9

Project Total: 9

Project Date: 4/9/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 15 caretakers attended the April caretaker meeting at REI Clackamas Town Center.

Volunteers

Hours
Bentz, Jerry 3
Berthold, Dana 4
Goodwin, Ron 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 3
McLaughlin, Larry 3
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 3
Settlemeyer, Lois 3
Vhay, John 3
Walker, Richard 3
Weston, Ruth 3

Project Total: 46

Project Date: 4/3/2008 to 4/4/2008
Agency: N/A
Activity Type: Tools
Leader: Bill Hawley
Location: Portland tool cache
Description: Cleaned, sharpened, repaired and returned tools. Finished painting north cache tools and sharpened.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 3/25/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Bill Hawley
Location: Trail 400 at Moffett Creek
Description: Cleared 9 trees, repaired 16 drain dips, 3 slides and 1 mile of tread,, and brushed 1/mile overhead and 3/4 mile on the ground with power brusher.

Volunteers

Hours
Carr, Pete 9
Chelin, Chuck 9
Fantz, Heather 8
Hanes, Douglas 10
Hawley, Bill 11
Martiny, Chuck 10
Weston, Ruth 9

Project Total: 66

Project Date: 3/22/2008
Agency: Clackamas River Ranger District
Activity Type: Training
Leader: Becky Wolf
Location: Estacad Ranger Station
Description: CPR Training

Volunteers

Hours
Farrier, Bruce 8
Farrier, Melissa 8
Lister, Norlene 8
Livermore, Stacey 8
Schlitt, Barbara 8
Turner, Linda 8
Wolf, Becky 7

Project Total: 55

Project Date: 3/22/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Fort Rains
Description: Cleared 15 trees, repaired 5 drain dips, brushed 3/4 mile of blackberry with power brusher, widened 1/2 mile of tread removing creep and popping rocks to even tread.

Volunteers

Hours
Brueggermeyer, Marcia 7
Chelin, Chuck 9
Covey, Kathy 10
Covey, Randy 10
Cunningham, John 9
Hawley, Bill 10
Martiny, Chuck 9
Park, Yon 9
Settlemeyer, Lois 6
Warner, Sam 9

Project Total: 88

Project Date: 3/12/2008
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: 17 caretakers attended the March caretaker meeting at REI Clackamas Town Center.

Volunteers

Hours
Adams, Barb 3
Allen, Eric 3
Arkes, Bob 3
Bentz, Jerry 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 3
McLaughlin, Larry 3
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 3
Vhay, John 3
Webb, Jim 3
Wolf, Becky 3

Project Total: 51

Project Date: 3/11/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Tamanous Trail to Gillette Lake
Description: Cleared 9 trees (4" - 8"). Trimmed branches of 4 threes to open trail. Installed lock box at Cascade Locks caches. Posted new assurance markers in new clear cut.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 3/7/2008 to 3/9/2008
Agency: N/A
Activity Type: Tools
Leader: Bill Hawley
Location: Portland tool cache
Description: Sharpened all hand tools (#120), installed handles on 16 new Reinharts, built new racks to hold additional tools, sorted tools for distribution to north tool cache, reorganized tools and supplies, sotred kitchen equipment in attic, assembled new tools, cleaned.

Volunteers

Hours
Arkes, Bob 8
Cobb, Roberta 9
Hammack, Brice 8
Hawley, Bill 15
Owen, Kim 10

Project Total: 50

Project Date: 3/6/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Dry Creek (south)
Description: Cleared 9 logs (5: 4-10"; 4: 10"+). Repaired 1 large root wad. Reparied 30' of tread.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 11
Vetter, Dick 10

Project Total: 33

Project Date: 2/29/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Chuck Martiny
Location: Tanner Creek to Bridge of the Gods
Description: Removed 9 logs (10" to 24"). Restored tread around a 10' root wad.

Volunteers

Hours
Martiny, Chuck 11
Vetter, Dick 11

Project Total: 22

Project Date: 2/24/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Steve Queen
Location: Clearcut north of Gillette Lake to Greenleaf Creek
Description: Repaired tread damage caused by recent Longview Fibre clear cut. Flagged and bordered trail that coincides with gas line road that no longer has trees on which to put markers. Cut back vine maple that would have grown over the trail in the summer (did same with 100 yard stretch north of Gillette Lake). Performed annual drainage maintenance on the north side of Greenleaf Creek.

Volunteers

Hours
Arkes, Bob 8
Coggswell, Don 8
Hawley, Bill 8
Mikol, Greg 8
Queen, Steve 8
Sakshaug, Arvid 8
Warner, Sam 8

Project Total: 56

Project Date: 2/23/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Ruth Weston
Location: Eagle Creek Trail
Description: Removed most of 36" tree (passable now). Repaired many slides.

Volunteers

Hours
Abell, Chris 9
Bunting, Clint 9
Carr, Pete 9
Cobb, Roberta 9
Hawley, Bill 9
Kliewer, Dave 9
Marriott, Tyler 9
Weston, Ruth 9

Project Total: 72

Project Date: 2/16/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Bill Hawley
Location: Elowah Falls
Description: Completed construction of a 15' stone wall that supports 20' of trail in the switchback just west of Elowah Falls. Removed 7 logs, repaired 4 drain dips and 2 slidees. Brushed 80 feet of blackberry and salmon berry.

Volunteers

Hours
Carr, Pete 9
Chelin, Chuck 9
Hawley, Bill 10
Maddox, Ken 8
Park, Yon 9
Vetter, Dick 9

Project Total: 54

Project Date: 2/11/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Ruth Weston
Location: Elowah Falls Trail
Description: Cleared 14 trees, reapired 200' of narrow, eroded trail, built rock wall, brushed three miles, repaired 2 switchbacks.

Volunteers

Hours
Bogue, Willie 9
Carr, Pete 9
Chelin, Chuck 9
Cobb, Roberta 9
Covey, Randy 9
Davidson, Tom 9
Hawley, Bill 9
Jack, Boyd 10
Martiny, Chuck 9
Settlemeyer, Lois 9
Vetter, Dick 9
Weston, Ruth 9

Project Total: 109

Project Date: 2/10/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Roberta Cobb
Location: Trails in the Columbia River Gorge
Description: 45 logs cleared. 45 areas of vine maple cleared. 18 miles of trail cleared: Latoral Falls for 1 mile. Angels Rest to Wahkeena Springs. Multnoma Falls to Horsetail Jct and to Oneonta trailhead. Horsetail Falls to Triple Falls bridge. Eagle Creek past Punchbolw for 2.25 miles one way. Cleared over 18 miles of trail; 80 logs plus we cleared another 45 areas of broken vine maple blocking the trail. Locations: Latorell Trail 1 mile Angels Rest Trail 4.8 miles Wahkeena Trail 2.8 miles Larch Mtn Trail (to Multnomah Falls and beyond the junction with Wahekeena Trail) 2 miles Gorge Trail 400/Oneonta Trail between Multnomah Falls and Oneonta Gorge 2.5 miles Trailhead spur of Oneonta Trail 0.2 miles Oneonta Trail from Trail 400 junction to a little past Triple Falls Bridge 1.3 miles Horsetail Falls 1.3 miles Eagle Creek Trail to a little past Punchbowl 2.5 mile

Volunteers

Hours
Barberis, Joe 11
Cather, Robert 8
Chelin, Chuck 8
Cobb, Roberta 9
Cunningham, John 8
Goodwin, Ron 7
Hawley, Bill 9
Maddox, Ken 6
Martiny, Chuck 11
Roe, David 11
Squires, Bob 6
Vetter, Dick 9
Warner, Sam 9

Project Total: 112

Project Date: 2/9/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Kim Owen
Location: Multomah and Wakeena Falls Loop
Description: Removed 35 trees, repaired 1 slide damage and 1 root wad.

Volunteers

Hours
Chelin, Chuck 9
Owen, Kim 9
Queen, Steve 9
Sakshaug, Arvid 9

Project Total: 36

Project Date: 1/26/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Roberta Cobb
Location: Elowah Falls and McCord Creek Trails
Description: Removed 2 small trees, 0.8 mile brushing with power brush cutter. Cleared 3 culverts, closed shortcuts to avoid switchbacks.

Volunteers

Hours
Abell, Chris 10
Beard, Dennis 9
Chelin, Chuck 9
Cobb, Roberta 8
Hald, Bryan 9
Marriott, Tyler 10
Martiny, Chuck 10
Panter, Henry 6
Robbins, Kyle 8
Schomburg, Dan 9
Vetter, Dick 8
Vhay, John 9

Project Total: 105

Project Date: 1/12/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Kim Owen
Location: Oneonta Trail
Description: Removed a large root wad. Repaired 30 feet of tread.

Volunteers

Hours
Owen, Kim 9
Richard, Jeff 9

Project Total: 18

Project Date: 1/7/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Roberta Cobb
Location: Eagle Creek Trail
Description: Repaired 6 slides on first 1/4 mile of trail. Finished building the 26' bridge, filled in approaches, cleared the trail on approaches. Cleared ditches and culverts along same stretch.

Volunteers

Hours
Carr, Pete 9
Cather, Robert 9
Chelin, Chuck 8
Cobb, Roberta 8
Hammack, Brice 9
McLaughlin, Larry 9
Weston, Ruth 8

Project Total: 60

Project Date: 1/3/2008 to 1/4/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Roberta Cobb
Location: Eagle Creek Trail
Description: Rebuilt 26' steel beam bridge. Cleared 50' of landslide.

Volunteers

Hours
Carr, Pete 18
Chelin, Chuck 17
Cobb, Roberta 9
Hawley, Bill 19
Nelson, David 8
Owen, Kim 8

Project Total: 79

Project Date: 1/1/2008
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Greenleaf Creek to Table Mountain
Description: Cleared 11 trees (3: 14"-24"; 8: 6"-14"). Repaired 4 drain dips, 2 water bars and 2 slides. Performed general brushing, repaired 200' of creep and rebuilt 40 fee of trail that gave way.

Volunteers

Hours
Carr, Pete 10
Chelin, Chuck 10
Douglass, Alan 10
Hawley, Bill 11
Martiny, Chuck 10
Nelson, David 10
Robbins, Kyle 10
Sakshaug, Arvid 10
Warner, Sam 10

Project Total: 91

Project Date: 1/1/2008 to 9/30/2008
Agency: N/A
Activity Type: Administration
Leader: Steve Queen
Location: Administration
Description: Administration

Volunteers

Hours
Cobb, Roberta 19
Konner, Jack 300
Queen, Steve 150
Vhay, John 6
Weston, Ruth 34

Project Total: 509