Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2007 to 9/30/2008
Activity Summary |
Scouting: | 39 |
Signing: | 37 |
Trail Maintenance (PCT): | 1373 |
Total Volunteer Hours: | 1449 |
Activity Detail (most recent on top) |
Project Date: | 9/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Removed PCT signs a junctions before the snows come and groomers come over the area. Numbered each post and sleeve for easy locating next summer. |
Volunteers |
Hours |
Goodwin, Ron | 6 |
Weston, Ruth | 6 |
Project Total: 12 |
Project Date: | 9/26/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Cleaned 90 drain dips and 21 water bars. Repaired 100' of tread. |
Volunteers |
Hours |
Goodwin, Katie | 8 |
Goodwin, Ron | 8 |
Project Total: 16 |
Project Date: | 9/13/2008 to 9/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls and Sandy River |
Description: | Repaired/created drainage system to divert active spring water from trail in area of annual slide area. Carried materials for Sandy River Guard Station repair. |
Volunteers |
Hours |
Bishop, Glenn | 15 |
Curtain, Gavin | 15 |
Curtain, Joe | 15 |
Gorman, Brian | 15 |
Owen, Kim | 19 |
Pekeider, Jay | 15 |
Philichi, Chris | 15 |
Philichi, Dylan | 15 |
Rhodehamel, Derek | 15 |
Project Total: 139 |
Project Date: | 8/25/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag Canyon |
Description: | Cleared 2 trees, cleaned 82 drain dips and 6 water bars. Erected sign 16A behind Timberline Lodge. Removed sign 16 by amphitheater. |
Volunteers |
Hours |
Weston, Ruth | 8 |
Project Total: 8 |
Project Date: | 8/23/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Mount Hood Wilderness Boundary |
Description: | Cleared 40 trees, cleared 10 drain dips and 15 water bars, repared tread creep in areas along switchbacks. Used power brusher for 1/4 mile along Muddy Fork and detour. Repaired tread on the newly brushed section. Pink ribbon installed along detour and muddy area planked over. New signs installed at Top Spur, Ramona loop and both ends of the detour. |
Volunteers |
Hours |
Carter, Patty | 11 |
Chelin, Chuck | 9 |
Cobb, Roberta | 11 |
Hanes, Douglas | 11 |
Konner, Jack | 11 |
Martiny, Chuck | 11 |
O'Neil, Geoff | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Settlemeyer, Lois | 11 |
Stevenson, John | 11 |
Project Total: 119 |
Project Date: | 8/14/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Jack Konner |
Location: | Top Spur to Ramona Falls parking lot |
Description: | Removed 9 small trees. Scouting. |
Volunteers |
Hours |
Corwin, Susan | 6 |
Konner, Jack | 8 |
Project Total: 14 |
Project Date: | 8/9/2008 to 8/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to North Paradise Park Trail Junction |
Description: | Extensive tread repair in and north of Zig Zag Canyon. |
Volunteers |
Hours |
Bartley, Michael | 53 |
Cobb, Roberta | 18 |
Gerhardt, Kim | 45 |
Lee, Patty | 53 |
Nordyke, Jay | 53 |
Nordyke, Thomas | 53 |
Owen, Kim | 53 |
Person, Bill | 59 |
Weston, Ruth | 53 |
Project Total: 440 |
Project Date: | 8/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Paradise Park |
Description: | Worked upheill tread at Zig Zag Canyon bridge. Removed 2 large rocks near bridge. Removed 18 trees and repaired 2 drain dips and 50' of tread. |
Volunteers |
Hours |
Carr, Pete | 13 |
Corwin, Susan | 12 |
Vhay, John | 13 |
Weston, Ruth | 13 |
Project Total: 51 |
Project Date: | 7/29/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to 1/4 mile beyond "BEE" trail |
Description: | Scouting. Cleared 6 tree <12". |
Volunteers |
Hours |
Weston, Ruth | 9 |
Project Total: 9 |
Project Date: | 7/28/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge |
Description: | Replaced 7 PCT signs, stashed 3 signs to be installed in sleeves in 2 weeks because of snow covering trails leading to PCT. |
Volunteers |
Hours |
Goodwin, Katie | 5 |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 15 |
Project Date: | 7/19/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | cleared 34 trees and cleaned 6 drain dips and 11 water bars. Extensive brushing and minor tread repair. |
Volunteers |
Hours |
Creelman, Kevin | 11 |
Goodwin, Ron | 11 |
Hanes, Douglas | 11 |
Luyan, Melissa | 11 |
Plant, Steve | 11 |
Ranganathan, Nandini | 11 |
Stevenson, John | 11 |
Project Total: 77 |
Project Date: | 7/18/2008 to 7/20/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 25 trees. Repaired 36 drain dips and 3 water bars. Brushed 200 yards and repaired 20 feet of tread. |
Volunteers |
Hours |
Auerbach, Paul | 21 |
Cunningham, John | 22 |
Fong, April Ann | 21 |
Kirchmiller, Christie | 19 |
Kirchmiller, Robert | 19 |
Owen, Kim | 14 |
Roe, David | 18 |
Young, Lee | 22 |
Project Total: 156 |
Project Date: | 7/17/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Scouting. |
Volunteers |
Hours |
Goodwin, Katie | 10 |
Goodwin, Ron | 10 |
Project Total: 20 |
Project Date: | 7/13/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge |
Description: | Scouting. . . SNOW! |
Volunteers |
Hours |
Van Gundy, Jackie | 5 |
Weston, Ruth | 5 |
Project Total: 10 |
Project Date: | 7/10/2008 to 7/12/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Sandy River |
Description: | Cleared 8 trees (6" to 10"). Repaired 10 drain dips, 100 yard of slide damage, 100 yards of brushing and 300 yards of tread. |
Volunteers |
Hours |
Cohoe, Kelly | 26 |
Cohoe, Michael | 23 |
Cohoe, Philip | 23 |
Janzen, Andrew | 23 |
Janzen, Paul | 23 |
Jespersen, Kyle | 23 |
Johnson, Gabriel | 23 |
Owen, Kim | 26 |
Sathrum, John | 23 |
Smith, Greg | 23 |
Smith, Tom | 23 |
Project Total: 259 |
Project Date: | 7/3/2008 to 7/4/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River to Paradise Park |
Description: | Cleared 6 logs. |
Volunteers |
Hours |
Owen, Kim | 17 |
Owen, Pam | 17 |
Project Total: 34 |
Project Date: | 6/15/2008 |
Agency: | Zig Zag Ranger District |
Leader: | Richard Walker |
Location: | Little Crater Lake to Road 42 |
Description: | Cleared 8 trees. Brushed rhododendron and vine maple for half mile. |
Volunteers |
Hours |
Moore, Mickey | 10 |
Walker, Ford | 10 |
Walker, Penny | 10 |
Walker, Richard | 10 |
Project Total: 40 |
Project Date: | 11/16/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls loop |
Description: | Removed 2 trees (14" and 18"). Repaired 6 water bars and 1 root wad damage. Cleaned under Ramona Creek log bridge. |
Volunteers |
Hours |
Owen, Kim | 10 |
Richard, Jeff | 10 |
Project Total: 20 |
Project Date: | 10/15/2007 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge area |
Description: | Removed and lay down locked signs before snow grooming machines operate. |
Volunteers |
Hours |
Goodwin, Ron | 5 |
Weston, Ruth | 5 |
Project Total: 10 |