Volunteer Projects — Pacific Crest Trail Association
All Agencies
10/1/2008 to 9/30/2009

Activity Summary

Administration: 589
Meeting: 300
Other: 8
Register Monitoring: 20
Scouting: 160
Tools: 94
Trail Maintenance (Feeder): 549
Trail Maintenance (Other): 498
Trail Maintenance (PCT): 4471
Trail Protection: 27
Training: 87
Training/Trail Maintenance: 278


Total Volunteer Hours: 7081

Activity Detail (most recent on top)

Project Date: 9/25/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: ALDHA-West Gathering project. Cleaned many drain dips, spot brushed and slough removal for two miles as needed.

Volunteers

Hours
Artman, Alan 10
Bakkar, Lindy 8
Caldwell, Robert 10
Christensen, Garret 9
Cobb, Roberta 9
MacDermat, Gordon 7
McCarron, Patrick 5
Owen, Pam 10
Rostad, Linda 8
Rowat, Nona 8
Shinney, Rob 10
Spartis, Diana 9
Turner, Bob 5

Project Total: 108

Project Date: 9/19/2009
Agency: Columbia River Gorge
Leader: Steve Queen
Location: Moody Street south
Description: Cleaned and improved 30 drain dips.

Volunteers

Hours
Golden, Meadow 3
Kelver, Brett 3
Marquardt, Ryan 3
Noble, Anthony 3
Queen, Steve 6

Project Total: 18

Project Date: 9/19/2009 to 9/20/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Cleaned 87 drain dips and 11 water bars. Repaired 30' of slide damage and 40' of tread.

Volunteers

Hours
Owen, Kim 19
Owen, Pam 19

Project Total: 38

Project Date: 9/18/2009 to 9/20/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Indian Heaven to Berry Mountain
Description: Cleaned 17 drain dips. Removed berm and graded tread for 1/4 mile. Installed 32 check steps through 1/4 mile section at the base of Berry Mountain to slow erosion and raise tread. Built 9 tread drains, and modified water bar drain dip.

Volunteers

Hours
Bentz, Jerry 11
Booth, Jeff 24
Carr, Pete 28
Cobb, Roberta 31
Hawley, Bill 75
Hawley, Karla 32
Mahoskey, Conner 24
Smith, Jeremy 24

Project Total: 249

Project Date: 9/16/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Repaired 45 drain dips and 25 water bars. Brushed 150' of vine maple, small hemlock and mountain ash. Widened 600' of tread to 24", 150' taking ouside berm off.

Volunteers

Hours
Carr, Pete 9
Goodwin, Katie 8
Goodwin, Ron 8
Hammack, Brice 10
Hanes, Douglas 9
Mikol, Greg 9
Mikol, Joanne 9
Murphy, Des 10
Murray, Michael 10
Ranganathan, Nandini 9

Project Total: 91

Project Date: 9/9/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: September caretaker meeting. Guests: None.

Volunteers

Hours
Bentz, Jerry 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Owen, Pam 4
Queen, Steve 4
Strahm, Ernie 4
Vhay, John 4
Wolf, Becky 4

Project Total: 36

Project Date: 9/4/2009
Agency: N/A
Leader: Tom Linde
Location: Wind River tool cache
Description: Install haz-mat storage in Wind River cache.

Volunteers

Hours
Linde, Tom 2

Project Total: 2

Project Date: 8/31/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Cleaned 4 drain dips and brushed 800 feet of huckleberry and vine maple.

Volunteers

Hours
Riley, Dave 10
Vhay, John 10
Webb, Jim 8

Project Total: 28

Project Date: 8/27/2009
Agency: N/A
Leader: Tom Linde
Location: Emergency assistance
Description: Assist through hikers with emergency.

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 8/18/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Logout recent blowdown.

Volunteers

Hours
Linde, Tom 6
Thompson, Frani 6
Ward, Norm 6

Project Total: 18

Project Date: 8/17/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag River
Description: Cleaned 30 drain dips, 2 water bars and wing ditches. Repaired 3 slide areas, each about 50' wide, spot brushing.

Volunteers

Hours
Hanes, Douglas 10
Martiny, Chuck 10
Meador, Corey 15
Ranganathan, Nandini 10
Ruprecht, Dan 10
Weston, Ruth 10

Project Total: 65

Project Date: 8/15/2009
Agency: Clackamas River Ranger District
Leader: Jerry Bentz
Location: Breitenbush Lake to Park Ridge
Description: Built approaches for bridge. Used 2 mules to haul in 6 x 6 timbers. Logged out 12 trees, repaired 30 drain dips, 20 water bars and a rock slide. Brushed 50' and repaired 30' of tread.

Volunteers

Hours
Bentz, Jerry 10
Corey, Arden 7
Kitzhaber, Jim 7
Morin, Michelle 10
Orchard, Del 10
Orchard, Marlene 10
Stroup, Don 8
Stroup, Lisa 8

Project Total: 70

Project Date: 8/12/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: August caretaker meeting. Guests: McKenzie Jensen and Jason Waicunas.

Volunteers

Hours
Beard, Dennis 4
Cobb, Roberta 4
Goodwin, Ron 4
Konner, Jack 4
Plant, Steve 4
Queen, Steve 4
Webb, Jim 4
Weston, Ruth 4

Project Total: 32

Project Date: 8/10/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Road 5896
Description: Logged out 16 trees. Cleaned 4 drain dips and 8 water bars. Brushed 100 yards.

Volunteers

Hours
Plant, Steve 9
Price, Tracy 9

Project Total: 18

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge northbound
Description: Logged out 1 tree (18"). Overhead limbing. Filled a hole.

Volunteers

Hours
Helm, George 10
Helm, Robin 10
Maffei, Andy 11
Weston, Ruth 11

Project Total: 42

Project Date: 8/8/2009 to 8/9/2009
Agency: Mount Adams Ranger District
Leader: Henry Panter
Location: Between Muddy Meadow and Potato Hill
Description: Reinstalled culvert

Volunteers

Hours
McMurtry, Joe 14
Panter, Henry 22

Project Total: 36

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls Loop
Description: Logged out 20 trees, cleaned 30 drain dips and 20 water bars. Spot brushing and tread repair over 4 miles. Focused brusing and tread repair for 100 yards.

Volunteers

Hours
Booth, Jeff 10
Carter, Patty 10
Cobb, Roberta 10
Goodwin, Ron 10
Hanes, Douglas 10
Kirchmiller, Robert 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Ranganathan, Nandini 10

Project Total: 100

Project Date: 8/7/2009 to 8/9/2009
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 6 trees, cleaned 25 drain dips, 15 water bars and buil6 2 new check dams. Repaired 4 slide damage areas, brushed and repaired tread for 2 miles.

Volunteers

Hours
Adams, Frosti 42
Boundy, Jenna 54
Davidson, Leslie 42
Erickson, Randy 38
Gehring, Dave 54
Gehring, Lance 54
Gehring, Mikah 54
Jones, Larry 42
Lung, Julie 38
Marshall, Gary 42
Strahm, Ernie 61
Strahm, Lori 54
Welliver, Don 38
Welliver, Kevin 38

Project Total: 651

Project Date: 8/1/2009 to 8/10/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: East Fork Eagle Creek
Description: Major tread and stream crossing repairs.

Volunteers

Hours
Arkes, Bob 10
Artman, Alan 10
Bacon, Don 54
Carr, Pete 10
Durgan, Felicia 54
Ferguson, Roy 40
Fulsom, Katrina 54
Griffin, Anita 54
Karlgaard, Karl 9
Lameka, Ann 8
Vhay, John 70

Project Total: 373

Project Date: 7/31/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Ramona Falls
Description: Scouting

Volunteers

Hours
Weston, Ruth 11

Project Total: 11

Project Date: 7/27/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail 778
Description: Logged out 16 trees (4" to 44")

Volunteers

Hours
Cobb, Roberta 12
Koppy, Larry 14
Laird, Sye 12
Roe, David 12
Weston, Ruth 13
Woltzen, Hugh 12

Project Total: 75

Project Date: 7/27/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing with student success crew on PCT.

Volunteers

Hours
Linde, Tom 11

Project Total: 11

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake, East Eagle
Description: Improved passage over log jam at outlet of Wahtum Lake.

Volunteers

Hours
Barnett, A. J. 10
Mendez, Colleen 11
Riley, Dave 9
Vhay, John 11
Winkel, Jeannette 11

Project Total: 52

Project Date: 7/25/2009 to 7/26/2009
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Road 23 to Horshoe Meadow
Description: Cleaned drain dips and brushed. Installed 14 new water bars about 2 miles from trailhead. Repaired about 1/3 mile of tread between wilderness boundary and Stagman Ridge Trail.

Volunteers

Hours
Arkes, Bob 19
Arkes, Jane 19
Booth, Jeff 19
Carr, Pete 19
Coppock, Cameron 19
Mikol, Greg 19

Project Total: 114

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lol Pass
Description: Logged out 10 trees (crosscut saws). Cleaned 10 drain dips and 5 water bars. Brushed and widened 50 yards of trail.

Volunteers

Hours
Gifford, Bill 10
Hanes, Douglas 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Pikkola, Dane 10
Turner, Tammy 10
Wankowicz, Bex 10

Project Total: 80

Project Date: 7/24/2009
Agency: N/A
Leader: Tom Linde
Location: Scouting for student success program
Description: Scouting for student success trail work.

Volunteers

Hours
Linde, Tom 6

Project Total: 6

Project Date: 7/23/2009
Agency: Mount Adams Ranger District
Leader: Jim Webb
Location: Trout Creen to Sedum Ridge
Description: Removed 1 6" log. Brushed 0.7 mile of salal.

Volunteers

Hours
Webb, Helen 7
Webb, Jim 7

Project Total: 14

Project Date: 7/21/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Trail 7778 to Paradise Park Loop North
Description: Scouting

Volunteers

Hours
Weston, Ruth 9

Project Total: 9

Project Date: 7/20/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail #778
Description: Scouting

Volunteers

Hours
Van Gundy, Jackie 9
Weston, Ruth 9

Project Total: 18

Project Date: 7/19/2009
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 35 trees. Spot tread repair over 2 miles.

Volunteers

Hours
Sheldon, Hal 16
Strahm, Ernie 16

Project Total: 32

Project Date: 7/16/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Road 5890
Description: Logged out 10 trees. Repaired 1 root wad damage.

Volunteers

Hours
Plant, Steve 10
Seith, Larry 10

Project Total: 20

Project Date: 7/15/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Corwin, Susan 5
Konner, Jack 7

Project Total: 12

Project Date: 7/12/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitial Pass to Little Crater Lake
Description: Logged out 7 trees, cleaned 3 drain dips and 2 water bars, repaired 1 root wad damage, brushed 200 yards.

Volunteers

Hours
Lujan, Melissa 11
Plant, Steve 11
Price, Tracy 11

Project Total: 33

Project Date: 7/11/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Logged out 18 trees (4: 30"+, 4: 20"-30", 6: 20"-20", 6: <10"). Repaired 1 10' slide using a rock retaining wall. Brushed and repaired tread on 200' of trail.

Volunteers

Hours
Hovin, Leif 11
Marriott, Tyler 11
Mendez, Colleen 15
Mikol, Greg 12
Vhay, John 15

Project Total: 64

Project Date: 7/11/2009
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Mt. Adams Trout Lake
Description: Scouting

Volunteers

Hours
Squires, Bob 6

Project Total: 6

Project Date: 7/10/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Indian Heaven Wilderness
Description: Logged out 12 trees, cleared 40 drain dips, repaired 1 root wad damage, brushed 1/2 mile of huckleberry and small fir north of Berry Mountain.

Volunteers

Hours
Booth, Jeff 13
Hawley, Bill 13
Hovin, Leif 13
Mater, James 13
Ojerio, Ryan 13
Winkel, Jeannette 15

Project Total: 80

Project Date: 7/10/2009 to 7/11/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Horse Camp and PCT
Description: Logged out 20+ trees, cleaned many water bars and brushed huckleberry. Built and repaired 4 sets of horse corrals.

Volunteers

Hours
Bentz, Jerry 20
Heeter, Carol 13
Hunt, Donna 11
Lam, Diane 10
Lister, Norlene 11
Livermore, Rich 12
Livermore, Stacey 20
Patterson, Bob 11
Schlitt, Barbara 10
Turner, Linda 11
Uhl, Ron 11
Warren, Jack 20

Project Total: 160

Project Date: 7/10/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing.

Volunteers

Hours
Linde, Tom 5
Ward, Norm 5

Project Total: 10

Project Date: 7/10/2009 to 7/11/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Joe Graham Horse Camp to Pinhead Saddle
Description: July 10: Joe Graham Horse Camp to Warm Springs River July 11: Warm Springs River to Pinhead Saddle Logged out 71 trees. Repaired root wad damage.

Volunteers

Hours
DeVall, Marty 17
Farrier, Bruce 9
Farrier, Melissa 9
Hunt, Bob 8
Hunt, Pat 8
Kinish, Korinne 15
Sischo, Gary 16
Sischo, Peg 16
Wolf, Becky 18

Project Total: 116

Project Date: 7/9/2009 to 7/12/2009
Agency: Clackamas River Ranger District
Leader: David Roe
Location: Pinhead Saddle area
Description: July 9: Lemiti Meadow area July 10: Lemiti Meadow to Pinhead Saddle July 11: Lemiti Meadow south July 12: Near Warm Springs River

Volunteers

Hours
Boeckman, Renee 23
Levy, Kathy 22
Roe, David 29
Whitmyer, Dennis 26
Whitmyer, Earl 26
Whitmyer, Larry 23

Project Total: 149

Project Date: 7/8/2009
Agency: Mount Adams Ranger District
Leader: Jim Webb
Location: Sedum Ridge to Trout Creek
Description: Logged out 31 trees. Improved 5 drain dipts and 1 water bar. Brushed vine maple, devil's club and overhanging limbs. Repaired 120- yard of tread.

Volunteers

Hours
Canessa, William 12
Crouse, Bill 12
Webb, Jim 12

Project Total: 36

Project Date: 7/8/2009
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Road 23 to north of Mt. Adams Wilderness boundary
Description: Logged out 7 trees, cleaned 118 drain dips, installed 5 water bars, brushed 1 mile and repaired 1/4 mile of tread between Road 23 to Road 521.

Volunteers

Hours
Arkes, Bob 10
Arkes, Jane 10
Bronstein, Bill 10
Cobb, Dave 8
Doty, Pat 10
Eastman, Erik 8
Eastman, Kathy 8
Halper, Gloria 10
Hammack, Brice 10
Moskovitz, Jay 10
Murphy, Des 10
Squires, Bob 8
Vetter, Dick 10
Vhay, John 10

Project Total: 132

Project Date: 7/8/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: July caretaker meeting. Guests: None.

Volunteers

Hours
Arkes, Bob 4
Beard, Dennis 4
Beckwith, Bozeb 4
Cobb, Roberta 4
Goodwin, Ron 4
Owen, Kim 4
Plant, Steve 4
Queen, Steve 4
Strahm, Ernie 4
Vhay, John 4
Wolf, Becky 4

Project Total: 44

Project Date: 7/7/2009 to 7/9/2009
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Hatfield Wilderness to south of Buck Peak
Description: Logged out 38 logs. Cleared trail.

Volunteers

Hours
Adams, Barb 20
Adams, Dave 20

Project Total: 40

Project Date: 7/6/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Wapinitia Pass
Description: Scouting

Volunteers

Hours
Plant, Steve 6
Price, Tracy 6

Project Total: 12

Project Date: 7/6/2009
Agency: N/A
Leader: Tom Linde
Location: Training for student success program
Description: Trail tool training for student success program for PCT work.

Volunteers

Hours
Linde, Tom 5

Project Total: 5

Project Date: 7/6/2009 to 7/10/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Big Huckleberry Mountain
Description: Led Skamania County Forest Youth Success Program. Cleaned 20 drain dips.

Volunteers

Hours
Hawley, Bill 52

Project Total: 52

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls
Description: Scouting

Volunteers

Hours
Corwin, Susan 7
Konner, Jack 9

Project Total: 16

Project Date: 7/3/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Cedar Creek trailhead
Description: Tree removal.

Volunteers

Hours
Hawley, Bill 9

Project Total: 9

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Logged out 5 trees, cleaned 14 drain dips and 6 water bars.

Volunteers

Hours
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 18

Project Date: 7/2/2009
Agency: Mount Adams Ranger District
Leader: Kim Owen
Location: Road 2000 to Sedum Ridge
Description: Removed 6 logs and light brushing. Cleaned drain dips.

Volunteers

Hours
Carr, Pete 11
Nelson, David 11
Owen, Kim 13
Owen, Pam 11

Project Total: 46

Project Date: 6/29/2009 to 6/30/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake to Indian Springs
Description: Logged out 10 trees (2 30", 3 20"-30", 5 10"-20"). Repaired 1 5' root wad. Burshed 100' of vine maple and overgrowth.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 10
Roe, David 11
Squires, Bob 8
Vhay, John 21
Winkel, Jeannette 10

Project Total: 72

Project Date: 6/26/2009 to 6/28/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy Guard Station to Paradise Park
Description: Logged out 15 logs (1-25", 3-18", 2-15", 4-12", 6<8"). Cleaned 20 drain dips, repaired 1 slide, removed 2 root wads, repaired 800 yards of tread along the Sandr River Canyon.

Volunteers

Hours
Fong, April Ann 26
Irwin, Mark 26
McNew, Dave 26
O'Donnell, Erin 26
Owen, Kim 44
Owen, Pam 30
Schmidt, Rick 19
Young, Lee 29

Project Total: 226

Project Date: 6/26/2009 to 6/28/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Crest Camp to Indian Heaven
Description: Logged out 40 trees (7: < 8", 27: 8"-24", 6: 24"-36"). Cleaned 18 drain dips. Repaired tread for two root wads. 1/4 mile of creep repair and grading.

Volunteers

Hours
Arkes, Bob 22
Booth, Jeff 34
Carr, Pete 34
Cunningham, John 19
Harrold, Ryan 17
Hawley, Bill 34
Hawley, Karla 38
Hovin, Leif 34
Mater, James 34
Mikol, Greg 34
Ojerio, Ryan 11
Webb, Jim 20

Project Total: 331

Project Date: 6/23/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Logout

Volunteers

Hours
Linde, Tom 2
Ward, Norm 2

Project Total: 4

Project Date: 6/22/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing

Volunteers

Hours
Linde, Tom 4
Thompson, Frani 3
Ward, Norm 3

Project Total: 10

Project Date: 6/21/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Logged out 62 trees. Posted reassurance makers at Barlow Pass and Palmateer junction.

Volunteers

Hours
Beard, Dennis 11
Cobb, Roberta 11
Covey, Kathy 11
Covey, Randy 11
Hanes, Douglas 10
Kliewer, Dave 11
Koppy, Larry 11
Ranganathan, Nandini 10
Roe, David 11
White, Hal 11

Project Total: 108

Project Date: 6/21/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Scouting

Volunteers

Hours
Owen, Kim 11
Owen, Pam 11

Project Total: 22

Project Date: 6/20/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing

Volunteers

Hours
Linde, Tom 4
Thompson, Frani 4

Project Total: 8

Project Date: 6/19/2009 to 6/20/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Campground and PCT access
Description: Corral and campground work

Volunteers

Hours
Bentz, Jerry 12
Boeckman, Renee 14
Hunt, Donna 12
Jones, Guy 12
Levy, Kathy 14
Lister, Norlene 14
McGregor, Jenny 12
Patterson, Bob 12
Roe, David 7
Schlitt, Barbara 14
Shafer, Devonne 11
Turner, Linda 12
Turner, Vince 12
Van Tassel, Brandon 14
Whitmyer, Dennis 17
Wilson, Clint 14
Wolf, Becky 16

Project Total: 219

Project Date: 6/19/2009 to 6/21/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 60 at Crest Camp (north and south)
Description: Logged out 39 trees. Cleaned 16 drain dips north of Crest Camp. Installed 22 check steps south of Sheep Lake. Repaired damage from 1 root wad. Brushed 3/4 mi. and removed berm.

Volunteers

Hours
Artman, Alan 20
Beckwith, Bozeb 24
Cather, Robert 23
Cunningham, John 13
Davis, Vicki 13
Hawley, Bill 41
Hawley, Karla 33
Martiny, Chuck 25
Pikkola, Dane 24
Webb, Jim 9

Project Total: 225

Project Date: 6/17/2009
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Mount Adams Ranger Station, Trout Lake
Description: Delivered tools to new cache

Volunteers

Hours
Arkes, Bob 8
Arkes, Jane 8

Project Total: 16

Project Date: 6/17/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing, drainage work.

Volunteers

Hours
Linde, Tom 4
Ward, Norm 4

Project Total: 8

Project Date: 6/14/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Scouting: Over 60 logs down.

Volunteers

Hours
Cobb, Roberta 8

Project Total: 8

Project Date: 6/14/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing, tread work.

Volunteers

Hours
Linde, Tom 3
Ward, Norm 3

Project Total: 6

Project Date: 6/13/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 12 trees (6" - 24").

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11

Project Total: 23

Project Date: 6/12/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Campground and PCT access
Description: Prep work for corral and campground maintenance

Volunteers

Hours
Bentz, Jerry 8
Wolf, Becky 8

Project Total: 16

Project Date: 6/10/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: June caretaker meeting. Guests: Dana Berthold.

Volunteers

Hours
Allen, Eric 4
Arkes, Bob 4
Bentz, Jerry 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Konner, Jack 4
Plant, Steve 4
Webb, Jim 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 44

Project Date: 6/10/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Logout

Volunteers

Hours
Johnson, Gary 9
Linde, Tom 8
Thompson, Frani 8

Project Total: 25

Project Date: 6/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Logged out 19 trees (12 on PCT, 7 on Twin Lakes trail with chainsaw)

Volunteers

Hours
Artman, Alan 10
Cobb, Roberta 13
Koppy, Larry 10
Weston, Ruth 10

Project Total: 43

Project Date: 6/9/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Logout

Volunteers

Hours
Johnson, Steve 6
Linde, Tom 6
Thompson, Frani 6
Ward, Norm 6

Project Total: 24

Project Date: 6/8/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 68 and Cedar Creek Trail
Description: Logged out 65 trees (4" - 16").

Volunteers

Hours
Hawley, Bill 11
Martiny, Chuck 11

Project Total: 22

Project Date: 6/7/2009
Agency: N/A
Leader: Tom Linde
Location: Trail Skills College prep
Description: Closing up/securing Training Center, sharpening and storing tools at Wind River Cache after skills college.

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 6/4/2009
Agency: N/A
Leader: Tom Linde
Location: Trail Skills College prep
Description: Setting up Training Center for skills college

Volunteers

Hours
Linde, Tom 3

Project Total: 3

Project Date: 6/1/2009 to 6/30/2009
Agency: N/A
Leader: Jerry Bentz
Location: Tool repair
Description: Built hangers for tool trailer, recondition tools from Forest Service, purchased and pickup crosscut saws.

Volunteers

Hours
Bentz, Jerry 18

Project Total: 18

Project Date: 5/29/2009
Agency: N/A
Leader: Tom Linde
Location: Trail Skills College prep
Description: Cleaning Training Center for skills college

Volunteers

Hours
Linde, Tom 3

Project Total: 3

Project Date: 5/29/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 68
Description: Tree removal

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 5/28/2009
Agency: N/A
Leader: Tom Linde
Location: Trail Skills College prep
Description: Reserving Training center for skills college.

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 5/23/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 15 trees (8" - 36"). General brushing.

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11
Schmeltzen, Molly 11

Project Total: 34

Project Date: 5/22/2009
Agency: Mount Adams Ranger District
Leader: Kim Owen
Location: Wind River Training Center
Description: Training for trainers

Volunteers

Hours
Hawley, Bill 11
Owen, Kim 12
Owen, Pam 11

Project Total: 34

Project Date: 5/19/2009
Agency: Columbia River Gorge
Leader: Tom Linde
Location: Road 2000 area
Description: Scouting and brushing for the Trails Skills College.

Volunteers

Hours
Linde, Tom 5

Project Total: 5

Project Date: 5/13/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: May caretaker meeting. Guests: None.

Volunteers

Hours
Arkes, Bob 4
Bentz, Jerry 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Konner, Jack 4
Owen, Kim 4
Owen, Pam 4
Plant, Steve 4
Queen, Steve 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 48

Project Date: 5/13/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Scouting and brushing

Volunteers

Hours
Johnson, Gary 5
Linde, Tom 5
Thompson, Frani 5

Project Total: 15

Project Date: 5/12/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Greenleaf Creek area
Description: Logged out 9 trees (5: <8", 8: 8"-24", 1: 24"=36"). Cleaned waterbars at Greenleaf Creek. Genreal brushing. Jim Proctor on site.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 10

Project Total: 22

Project Date: 5/10/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 2000
Description: Logged out 13 (8"-16) and 4 (16" - 24") with chainsaw. Logged out 5 (8" - 16") with crosscut saw.

Volunteers

Hours
Allen, Eric 10
Hawley, Bill 13
Plant, Steve 10

Project Total: 33

Project Date: 5/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Scouting

Volunteers

Hours
Cobb, Roberta 5

Project Total: 5

Project Date: 5/7/2009
Agency: N/A
Leader: Tom Linde
Location: Tool repair
Description: Tool repair and Wind River cache cleanup.

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 5/2/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Warren Gap
Description: Logged out 47 trees <18". Trail maintenance / training hybrid.

Volunteers

Hours
Arkes, Bob 9
Beard, Dennis 9
Carter, Patty 10
Cobb, Roberta 9
Covey, Kathy 9
Crouse, Bill 8
Cunningham, John 10
Goodwin, Ron 9
Hawley, Bill 17
Konner, Jack 10
Linde, Tom 8
O'Neil, Geoff 9
Owen, Kim 10
Queen, Steve 10
Webb, Jim 8

Project Total: 145

Project Date: 4/28/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing and drainage.

Volunteers

Hours
Johnson, Steve 5
Linde, Tom 5
Thompson, Frani 5
Ward, Norm 5

Project Total: 20

Project Date: 4/27/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Wind River Bridge
Description: Logged out 12 trees <14". Trail maintenance / training hybrid.

Volunteers

Hours
Carr, Pete 10
Hawley, Bill 13
Linde, Tom 6
Martiny, Chuck 10
Weston, Ruth 9

Project Total: 48

Project Date: 4/22/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Herman Bridge Junction north and south
Description: North Face Earth Day crew. Logged out 5 trees; 1 (>30"), 2 (10"), 2 (< 10"). Cleared two small landslides. Removed 2 root wads. Built rock retainer wall (25'), graded rocky tread (30") at creeek edge after log removal.

Volunteers

Hours
Adelman, Jeff 9
Cobb, Roberta 9
Cunningham, John 10
Hawley, Bill 10
Ireland, Francis 10
Logan, Patrick 9
Moore, Brittany 9

Project Total: 66

Project Date: 4/20/2009
Agency: N/A
Leader: Tom Linde
Location: Title 2 (RAC) grant meeting
Description:

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 4/18/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Road 2000 (north and south)
Description: Scouting

Volunteers

Hours
Hawley, Bill 8
Owen, Kim 8

Project Total: 16

Project Date: 4/17/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing

Volunteers

Hours
Johnson, Steve 3
Linde, Tom 3

Project Total: 6

Project Date: 4/15/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River area
Description: Brushing

Volunteers

Hours
Johnson, Steve 3
Linde, Tom 3

Project Total: 6

Project Date: 4/13/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Bridge of the Gods south
Description: Logged out 18 trees. 9 (< 8"), 7 (8" - 24"), 2 (24" - 36")

Volunteers

Hours
Cunningham, John 9
Hawley, Bill 9
Martiny, Chuck 9
Weston, Ruth 9

Project Total: 36

Project Date: 4/11/2009
Agency: N/A
Leader: Tom Linde
Location: Training
Description: Saw recert for Back Country Horsemen. This was for the BCH to do the work on the PCT.

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 4/10/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Bridge of the Gods north
Description: Scouting

Volunteers

Hours
Hawley, Bill 5

Project Total: 5

Project Date: 4/8/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: April caretaker meeting. Guests: Dana Berthold.

Volunteers

Hours
Allen, Eric 4
Arkes, Bob 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Konner, Jack 4
Plant, Steve 4
Queen, Steve 4
Webb, Jim 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 44

Project Date: 4/6/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Bridge of the Gods south
Description: Scouting

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 4/6/2009
Agency: N/A
Leader: Bob Arkes
Location: Trout Lake tool cache
Description: Setting up the new tool cache.

Volunteers

Hours
Arkes, Bob 7
Hawley, Bill 7

Project Total: 14

Project Date: 3/23/2009 to 3/27/2009
Agency: N/A
Leader: Tom Linde
Location: Saw training
Description: Saw training Service Academy, Saw training for trail crew leaders, These crews worked on the PCT from Southern California to northern Washington.

Volunteers

Hours
Linde, Tom 48

Project Total: 48

Project Date: 3/23/2009
Agency: Columbia River Gorge
Leader: Roberta Cobb
Location: Herman Creek Trail
Description: Logged out 5 large and 4 small trees ouside wilderness; 5 "B" size inside wilderness; 4 root wads removed. Tread repaired under 3 additional trees.

Volunteers

Hours
Beard, Dennis 10
Cobb, Roberta 10
Cunningham, John 12
Hawley, Bill 12
Martiny, Chuck 12
Weston, Ruth 11

Project Total: 67

Project Date: 3/18/2009
Agency: Mount Adams Ranger District
Leader: Tom Linde
Location: Scouting
Description: Scouting Wind River area

Volunteers

Hours
Johnson, Steve 4
Linde, Tom 4

Project Total: 8

Project Date: 3/11/2009
Agency: N/A
Leader: Steve Queen
Location: REI Clackamas Town Center (Caretaker meeting)
Description: March caretaker meeting. Guests: None.

Volunteers

Hours
Arkes, Bob 4
Bentz, Jerry 4
Cobb, Roberta 4
Goodwin, Ron 4
Hawley, Bill 4
Konner, Jack 4
Owen, Kim 4
Plant, Steve 4
Queen, Steve 4
Vhay, John 4
Webb, Jim 4
Weston, Ruth 4
Wolf, Becky 4

Project Total: 52

Project Date: 3/7/2009
Agency: N/A
Leader: Roberta Cobb
Location: Portland tool cache
Description: Performed tool maintenance

Volunteers

Hours
Arkes, Bob 5
Cobb, Roberta 10
Hammack, Brice 5
Hawley, Bill 5
Owen, Kim 5
Vhay, John 5
Weston, Ruth 5

Project Total: 40

Project Date: 2/20/2009
Agency: N/A
Leader: Tom Linde
Location: Title 2 (RAC) grant writing
Description:

Volunteers

Hours
Linde, Tom 6

Project Total: 6

Project Date: 2/16/2009
Agency: Columbia River Gorge
Leader: Roberta Cobb
Location: Hermann Bridge Trail to Hatfield Wilderness Boundary
Description: Logged out six trees

Volunteers

Hours
Marriott, Tyler 10
Queen, Steve 10
Vhay, John 10
Warner, Sam 10

Project Total: 40

Project Date: 2/16/2009
Agency: Columbia River Gorge
Leader: Roberta Cobb
Location: Gorge Trails
Description: Log out in Eagle Creek, Angels Rest and Latourell

Volunteers

Hours
Artman, Alan 9
Bronstein, Bill 9
Cobb, Roberta 9
Guzie, Andy 10
Hughes, Lisa 11
Martiny, Chuck 10
Owen, Pam 10
Roe, David 10
Vetter, Dick 10

Project Total: 88

Project Date: 1/23/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Multnomah Falls
Description: Logged out 13 trees.

Volunteers

Hours
Cunningham, John 7
Hawley, Bill 12

Project Total: 19

Project Date: 1/1/2009 to 9/30/2009
Agency: N/A
Leader: Steve Queen
Location: Administration
Description: Administration

Volunteers

Hours
Cobb, Roberta 14
Hawley, Bill 15
Konner, Jack 300
Owen, Kim 32
Queen, Steve 200

Project Total: 561

Project Date: 1/1/2009 to 9/30/2009
Agency: N/A
Leader: Jack Konner
Location: Register Monitoring
Description: Register monitoring hours.

Volunteers

Hours
Matzke, Jim 10
Matzke, Liz 10

Project Total: 20

Project Date: 12/7/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 5
Carr, Pete 6
Hawley, Bill 6
Marriott, Tyler 5
Nelson, Brian 3
Nelson, Heather 3

Project Total: 28

Project Date: 11/30/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 7

Project Total: 7

Project Date: 11/3/2008
Agency: Columbia River Gorge
Leader: Ruth Weston
Location: Oneanta trail head to Triple Falls Bridge
Description: Dismantled Triple Falls bridge. Brushed for one mile further up the trail. Saved planks and rails for the new bridge and stashed them.

Volunteers

Hours
Beard, Dennis 8
Brown, Maureen 8
Carr, Pete 8
Cobb, Roberta 8
Davidson, Tom 8
Hanes, Douglas 8
Hawley, Bill 8
Hilbert, Johanna 8
Hilbert, Justin 8
Nemchick, Hal 8
Ranganathan, Nandini 8
Warner, Sam 9
Weston, Ruth 8

Project Total: 105

Project Date: 10/28/2008
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: 3 miles south of Crest Camp
Description: Cleared 30" rotten log. Cleaned and rebuilt 7 drain dips, power brushed 3/4 mile of huckleberry and vine maple near Bill Butte.

Volunteers

Hours
Carr, Pete 8
Hawley, Bill 9

Project Total: 17

Project Date: 10/15/2008 to 10/17/2008
Agency: Hood River Ranger District
Leader: David Roe
Location: Indian Mountain
Description: EIS review. Review plans to relocate and make permanent Indian Mountain repeater site. Determined maintenance requirements for Indian Springs Trail. Determined maintenance requirements for PCT south of Buck Peak.

Volunteers

Hours
Roe, David 27

Project Total: 27

Project Date: 10/10/2008 to 10/12/2008
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Berry Mountain
Description: Logged out 1 tree, built or cleaned 19 drain dips, repaired 3 water bars, brushed 1.25 miles of huckleberry and small conifers, widened 800 feet of tread.

Volunteers

Hours
Carr, Pete 22
Chelin, Chuck 21
Cunningham, John 30
Doyle, Tim 15
Hawley, Bill 45
Jaroch, Eric 22

Project Total: 155

Project Date: 10/9/2008 to 10/12/2008
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Road 4220 south for 1/2 mile
Description: Removed 4 trees, repaired 1 rock slide, 2 root wads and 1/2 mile of tread.

Volunteers

Hours
Gehring, Dave 30
Gehring, Lance 30
Gehring, Mikah 30
Henderson, Blake 30
Strahm, Ernie 30

Project Total: 150

Project Date: 10/8/2008 to 10/9/2008
Agency: Clackamas River Ranger District
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Drainage maintenance (8 water bars) south of Warm Springs River. Documented current conditions at Triangle Lake Horse Camp.

Volunteers

Hours
Roe, David 20

Project Total: 20

Project Date: 10/1/2008 to 10/2/2008
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Indian Heaven
Description: Logged 20 trees and cleaned out over 100 drain dips from road 24 to Junction Lake.

Volunteers

Hours
Hawley, Bill 21
Winkel, Jeannette 11

Project Total: 32