Volunteer Projects — Pacific Crest Trail Association
Hood River Ranger District
10/1/2008 to 9/30/2009

Activity Summary

Scouting: 25
Trail Maintenance (Feeder): 533
Trail Maintenance (PCT): 470
Trail Protection: 27


Total Volunteer Hours: 1055

Activity Detail (most recent on top)

Project Date: 9/25/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: ALDHA-West Gathering project. Cleaned many drain dips, spot brushed and slough removal for two miles as needed.

Volunteers

Hours
Artman, Alan 10
Bakkar, Lindy 8
Caldwell, Robert 10
Christensen, Garret 9
Cobb, Roberta 9
MacDermat, Gordon 7
McCarron, Patrick 5
Owen, Pam 10
Rostad, Linda 8
Rowat, Nona 8
Shinney, Rob 10
Spartis, Diana 9
Turner, Bob 5

Project Total: 108

Project Date: 8/31/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Cleaned 4 drain dips and brushed 800 feet of huckleberry and vine maple.

Volunteers

Hours
Riley, Dave 10
Vhay, John 10
Webb, Jim 8

Project Total: 28

Project Date: 8/1/2009 to 8/10/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: East Fork Eagle Creek
Description: Major tread and stream crossing repairs.

Volunteers

Hours
Arkes, Bob 10
Artman, Alan 10
Bacon, Don 54
Carr, Pete 10
Durgan, Felicia 54
Ferguson, Roy 40
Fulsom, Katrina 54
Griffin, Anita 54
Karlgaard, Karl 9
Lameka, Ann 8
Vhay, John 70

Project Total: 373

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lol Pass
Description: Logged out 10 trees (crosscut saws). Cleaned 10 drain dips and 5 water bars. Brushed and widened 50 yards of trail.

Volunteers

Hours
Gifford, Bill 10
Hanes, Douglas 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Pikkola, Dane 10
Turner, Tammy 10
Wankowicz, Bex 10

Project Total: 80

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake, East Eagle
Description: Improved passage over log jam at outlet of Wahtum Lake.

Volunteers

Hours
Barnett, A. J. 10
Mendez, Colleen 11
Riley, Dave 9
Vhay, John 11
Winkel, Jeannette 11

Project Total: 52

Project Date: 7/15/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Corwin, Susan 5
Konner, Jack 7

Project Total: 12

Project Date: 7/11/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Logged out 18 trees (4: 30"+, 4: 20"-30", 6: 20"-20", 6: <10"). Repaired 1 10' slide using a rock retaining wall. Brushed and repaired tread on 200' of trail.

Volunteers

Hours
Hovin, Leif 11
Marriott, Tyler 11
Mendez, Colleen 15
Mikol, Greg 12
Vhay, John 15

Project Total: 64

Project Date: 7/7/2009 to 7/9/2009
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Hatfield Wilderness to south of Buck Peak
Description: Logged out 38 logs. Cleared trail.

Volunteers

Hours
Adams, Barb 20
Adams, Dave 20

Project Total: 40

Project Date: 6/29/2009 to 6/30/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake to Indian Springs
Description: Logged out 10 trees (2 30", 3 20"-30", 5 10"-20"). Repaired 1 5' root wad. Burshed 100' of vine maple and overgrowth.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 10
Roe, David 11
Squires, Bob 8
Vhay, John 21
Winkel, Jeannette 10

Project Total: 72

Project Date: 6/21/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Logged out 62 trees. Posted reassurance makers at Barlow Pass and Palmateer junction.

Volunteers

Hours
Beard, Dennis 11
Cobb, Roberta 11
Covey, Kathy 11
Covey, Randy 11
Hanes, Douglas 10
Kliewer, Dave 11
Koppy, Larry 11
Ranganathan, Nandini 10
Roe, David 11
White, Hal 11

Project Total: 108

Project Date: 6/14/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Scouting: Over 60 logs down.

Volunteers

Hours
Cobb, Roberta 8

Project Total: 8

Project Date: 6/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Logged out 19 trees (12 on PCT, 7 on Twin Lakes trail with chainsaw)

Volunteers

Hours
Artman, Alan 10
Cobb, Roberta 13
Koppy, Larry 10
Weston, Ruth 10

Project Total: 43

Project Date: 5/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Scouting

Volunteers

Hours
Cobb, Roberta 5

Project Total: 5

Project Date: 12/7/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 5
Carr, Pete 6
Hawley, Bill 6
Marriott, Tyler 5
Nelson, Brian 3
Nelson, Heather 3

Project Total: 28

Project Date: 11/30/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 7

Project Total: 7

Project Date: 10/15/2008 to 10/17/2008
Agency: Hood River Ranger District
Leader: David Roe
Location: Indian Mountain
Description: EIS review. Review plans to relocate and make permanent Indian Mountain repeater site. Determined maintenance requirements for Indian Springs Trail. Determined maintenance requirements for PCT south of Buck Peak.

Volunteers

Hours
Roe, David 27

Project Total: 27