Volunteer Projects — Pacific Crest Trail Association
Mount Hood National Forest (Hood River, Zig Zag and Clackamas River Ranger Districts)
10/1/2008 to 9/30/2009

Activity Summary

Scouting: 113
Trail Maintenance (Feeder): 549
Trail Maintenance (Other): 219
Trail Maintenance (PCT): 2601
Trail Protection: 27


Total Volunteer Hours: 3509

Activity Detail (most recent on top)

Project Date: 9/25/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: ALDHA-West Gathering project. Cleaned many drain dips, spot brushed and slough removal for two miles as needed.

Volunteers

Hours
Artman, Alan 10
Bakkar, Lindy 8
Caldwell, Robert 10
Christensen, Garret 9
Cobb, Roberta 9
MacDermat, Gordon 7
McCarron, Patrick 5
Owen, Pam 10
Rostad, Linda 8
Rowat, Nona 8
Shinney, Rob 10
Spartis, Diana 9
Turner, Bob 5

Project Total: 108

Project Date: 9/19/2009 to 9/20/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Cleaned 87 drain dips and 11 water bars. Repaired 30' of slide damage and 40' of tread.

Volunteers

Hours
Owen, Kim 19
Owen, Pam 19

Project Total: 38

Project Date: 9/16/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Repaired 45 drain dips and 25 water bars. Brushed 150' of vine maple, small hemlock and mountain ash. Widened 600' of tread to 24", 150' taking ouside berm off.

Volunteers

Hours
Carr, Pete 9
Goodwin, Katie 8
Goodwin, Ron 8
Hammack, Brice 10
Hanes, Douglas 9
Mikol, Greg 9
Mikol, Joanne 9
Murphy, Des 10
Murray, Michael 10
Ranganathan, Nandini 9

Project Total: 91

Project Date: 8/31/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Cleaned 4 drain dips and brushed 800 feet of huckleberry and vine maple.

Volunteers

Hours
Riley, Dave 10
Vhay, John 10
Webb, Jim 8

Project Total: 28

Project Date: 8/17/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag River
Description: Cleaned 30 drain dips, 2 water bars and wing ditches. Repaired 3 slide areas, each about 50' wide, spot brushing.

Volunteers

Hours
Hanes, Douglas 10
Martiny, Chuck 10
Meador, Corey 15
Ranganathan, Nandini 10
Ruprecht, Dan 10
Weston, Ruth 10

Project Total: 65

Project Date: 8/15/2009
Agency: Clackamas River Ranger District
Leader: Jerry Bentz
Location: Breitenbush Lake to Park Ridge
Description: Built approaches for bridge. Used 2 mules to haul in 6 x 6 timbers. Logged out 12 trees, repaired 30 drain dips, 20 water bars and a rock slide. Brushed 50' and repaired 30' of tread.

Volunteers

Hours
Bentz, Jerry 10
Corey, Arden 7
Kitzhaber, Jim 7
Morin, Michelle 10
Orchard, Del 10
Orchard, Marlene 10
Stroup, Don 8
Stroup, Lisa 8

Project Total: 70

Project Date: 8/10/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Road 5896
Description: Logged out 16 trees. Cleaned 4 drain dips and 8 water bars. Brushed 100 yards.

Volunteers

Hours
Plant, Steve 9
Price, Tracy 9

Project Total: 18

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge northbound
Description: Logged out 1 tree (18"). Overhead limbing. Filled a hole.

Volunteers

Hours
Helm, George 10
Helm, Robin 10
Maffei, Andy 11
Weston, Ruth 11

Project Total: 42

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls Loop
Description: Logged out 20 trees, cleaned 30 drain dips and 20 water bars. Spot brushing and tread repair over 4 miles. Focused brusing and tread repair for 100 yards.

Volunteers

Hours
Booth, Jeff 10
Carter, Patty 10
Cobb, Roberta 10
Goodwin, Ron 10
Hanes, Douglas 10
Kirchmiller, Robert 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Ranganathan, Nandini 10

Project Total: 100

Project Date: 8/7/2009 to 8/9/2009
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 6 trees, cleaned 25 drain dips, 15 water bars and buil6 2 new check dams. Repaired 4 slide damage areas, brushed and repaired tread for 2 miles.

Volunteers

Hours
Adams, Frosti 42
Boundy, Jenna 54
Davidson, Leslie 42
Erickson, Randy 38
Gehring, Dave 54
Gehring, Lance 54
Gehring, Mikah 54
Jones, Larry 42
Lung, Julie 38
Marshall, Gary 42
Strahm, Ernie 61
Strahm, Lori 54
Welliver, Don 38
Welliver, Kevin 38

Project Total: 651

Project Date: 8/1/2009 to 8/10/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: East Fork Eagle Creek
Description: Major tread and stream crossing repairs.

Volunteers

Hours
Arkes, Bob 10
Artman, Alan 10
Bacon, Don 54
Carr, Pete 10
Durgan, Felicia 54
Ferguson, Roy 40
Fulsom, Katrina 54
Griffin, Anita 54
Karlgaard, Karl 9
Lameka, Ann 8
Vhay, John 70

Project Total: 373

Project Date: 7/31/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Ramona Falls
Description: Scouting

Volunteers

Hours
Weston, Ruth 11

Project Total: 11

Project Date: 7/27/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail 778
Description: Logged out 16 trees (4" to 44")

Volunteers

Hours
Cobb, Roberta 12
Koppy, Larry 14
Laird, Sye 12
Roe, David 12
Weston, Ruth 13
Woltzen, Hugh 12

Project Total: 75

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake, East Eagle
Description: Improved passage over log jam at outlet of Wahtum Lake.

Volunteers

Hours
Barnett, A. J. 10
Mendez, Colleen 11
Riley, Dave 9
Vhay, John 11
Winkel, Jeannette 11

Project Total: 52

Project Date: 7/25/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lol Pass
Description: Logged out 10 trees (crosscut saws). Cleaned 10 drain dips and 5 water bars. Brushed and widened 50 yards of trail.

Volunteers

Hours
Gifford, Bill 10
Hanes, Douglas 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Pikkola, Dane 10
Turner, Tammy 10
Wankowicz, Bex 10

Project Total: 80

Project Date: 7/21/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Trail 7778 to Paradise Park Loop North
Description: Scouting

Volunteers

Hours
Weston, Ruth 9

Project Total: 9

Project Date: 7/20/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail #778
Description: Scouting

Volunteers

Hours
Van Gundy, Jackie 9
Weston, Ruth 9

Project Total: 18

Project Date: 7/19/2009
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Breitenbush Lake
Description: Logged out 35 trees. Spot tread repair over 2 miles.

Volunteers

Hours
Sheldon, Hal 16
Strahm, Ernie 16

Project Total: 32

Project Date: 7/16/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Road 5890
Description: Logged out 10 trees. Repaired 1 root wad damage.

Volunteers

Hours
Plant, Steve 10
Seith, Larry 10

Project Total: 20

Project Date: 7/15/2009
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Corwin, Susan 5
Konner, Jack 7

Project Total: 12

Project Date: 7/12/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitial Pass to Little Crater Lake
Description: Logged out 7 trees, cleaned 3 drain dips and 2 water bars, repaired 1 root wad damage, brushed 200 yards.

Volunteers

Hours
Lujan, Melissa 11
Plant, Steve 11
Price, Tracy 11

Project Total: 33

Project Date: 7/11/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Logged out 18 trees (4: 30"+, 4: 20"-30", 6: 20"-20", 6: <10"). Repaired 1 10' slide using a rock retaining wall. Brushed and repaired tread on 200' of trail.

Volunteers

Hours
Hovin, Leif 11
Marriott, Tyler 11
Mendez, Colleen 15
Mikol, Greg 12
Vhay, John 15

Project Total: 64

Project Date: 7/10/2009 to 7/11/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Joe Graham Horse Camp to Pinhead Saddle
Description: July 10: Joe Graham Horse Camp to Warm Springs River July 11: Warm Springs River to Pinhead Saddle Logged out 71 trees. Repaired root wad damage.

Volunteers

Hours
DeVall, Marty 17
Farrier, Bruce 9
Farrier, Melissa 9
Hunt, Bob 8
Hunt, Pat 8
Kinish, Korinne 15
Sischo, Gary 16
Sischo, Peg 16
Wolf, Becky 18

Project Total: 116

Project Date: 7/10/2009 to 7/11/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Horse Camp and PCT
Description: Logged out 20+ trees, cleaned many water bars and brushed huckleberry. Built and repaired 4 sets of horse corrals.

Volunteers

Hours
Bentz, Jerry 20
Heeter, Carol 13
Hunt, Donna 11
Lam, Diane 10
Lister, Norlene 11
Livermore, Rich 12
Livermore, Stacey 20
Patterson, Bob 11
Schlitt, Barbara 10
Turner, Linda 11
Uhl, Ron 11
Warren, Jack 20

Project Total: 160

Project Date: 7/9/2009 to 7/12/2009
Agency: Clackamas River Ranger District
Leader: David Roe
Location: Pinhead Saddle area
Description: July 9: Lemiti Meadow area July 10: Lemiti Meadow to Pinhead Saddle July 11: Lemiti Meadow south July 12: Near Warm Springs River

Volunteers

Hours
Boeckman, Renee 23
Levy, Kathy 22
Roe, David 29
Whitmyer, Dennis 26
Whitmyer, Earl 26
Whitmyer, Larry 23

Project Total: 149

Project Date: 7/7/2009 to 7/9/2009
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Hatfield Wilderness to south of Buck Peak
Description: Logged out 38 logs. Cleared trail.

Volunteers

Hours
Adams, Barb 20
Adams, Dave 20

Project Total: 40

Project Date: 7/6/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Wapinitia Pass
Description: Scouting

Volunteers

Hours
Plant, Steve 6
Price, Tracy 6

Project Total: 12

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls
Description: Scouting

Volunteers

Hours
Corwin, Susan 7
Konner, Jack 9

Project Total: 16

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Logged out 5 trees, cleaned 14 drain dips and 6 water bars.

Volunteers

Hours
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 18

Project Date: 6/29/2009 to 6/30/2009
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake to Indian Springs
Description: Logged out 10 trees (2 30", 3 20"-30", 5 10"-20"). Repaired 1 5' root wad. Burshed 100' of vine maple and overgrowth.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 10
Roe, David 11
Squires, Bob 8
Vhay, John 21
Winkel, Jeannette 10

Project Total: 72

Project Date: 6/26/2009 to 6/28/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy Guard Station to Paradise Park
Description: Logged out 15 logs (1-25", 3-18", 2-15", 4-12", 6<8"). Cleaned 20 drain dips, repaired 1 slide, removed 2 root wads, repaired 800 yards of tread along the Sandr River Canyon.

Volunteers

Hours
Fong, April Ann 26
Irwin, Mark 26
McNew, Dave 26
O'Donnell, Erin 26
Owen, Kim 44
Owen, Pam 30
Schmidt, Rick 19
Young, Lee 29

Project Total: 226

Project Date: 6/21/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Logged out 62 trees. Posted reassurance makers at Barlow Pass and Palmateer junction.

Volunteers

Hours
Beard, Dennis 11
Cobb, Roberta 11
Covey, Kathy 11
Covey, Randy 11
Hanes, Douglas 10
Kliewer, Dave 11
Koppy, Larry 11
Ranganathan, Nandini 10
Roe, David 11
White, Hal 11

Project Total: 108

Project Date: 6/21/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Scouting

Volunteers

Hours
Owen, Kim 11
Owen, Pam 11

Project Total: 22

Project Date: 6/19/2009 to 6/20/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Campground and PCT access
Description: Corral and campground work

Volunteers

Hours
Bentz, Jerry 12
Boeckman, Renee 14
Hunt, Donna 12
Jones, Guy 12
Levy, Kathy 14
Lister, Norlene 14
McGregor, Jenny 12
Patterson, Bob 12
Roe, David 7
Schlitt, Barbara 14
Shafer, Devonne 11
Turner, Linda 12
Turner, Vince 12
Van Tassel, Brandon 14
Whitmyer, Dennis 17
Wilson, Clint 14
Wolf, Becky 16

Project Total: 219

Project Date: 6/14/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Scouting: Over 60 logs down.

Volunteers

Hours
Cobb, Roberta 8

Project Total: 8

Project Date: 6/13/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 12 trees (6" - 24").

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11

Project Total: 23

Project Date: 6/12/2009
Agency: Clackamas River Ranger District
Leader: Becky Wolf
Location: Triangle Lake Campground and PCT access
Description: Prep work for corral and campground maintenance

Volunteers

Hours
Bentz, Jerry 8
Wolf, Becky 8

Project Total: 16

Project Date: 6/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Logged out 19 trees (12 on PCT, 7 on Twin Lakes trail with chainsaw)

Volunteers

Hours
Artman, Alan 10
Cobb, Roberta 13
Koppy, Larry 10
Weston, Ruth 10

Project Total: 43

Project Date: 5/23/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 15 trees (8" - 36"). General brushing.

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11
Schmeltzen, Molly 11

Project Total: 34

Project Date: 5/9/2009
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Scouting

Volunteers

Hours
Cobb, Roberta 5

Project Total: 5

Project Date: 12/7/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 5
Carr, Pete 6
Hawley, Bill 6
Marriott, Tyler 5
Nelson, Brian 3
Nelson, Heather 3

Project Total: 28

Project Date: 11/30/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Cleaned culverts, water bars and drain ditches.

Volunteers

Hours
Adams, Barb 7

Project Total: 7

Project Date: 10/15/2008 to 10/17/2008
Agency: Hood River Ranger District
Leader: David Roe
Location: Indian Mountain
Description: EIS review. Review plans to relocate and make permanent Indian Mountain repeater site. Determined maintenance requirements for Indian Springs Trail. Determined maintenance requirements for PCT south of Buck Peak.

Volunteers

Hours
Roe, David 27

Project Total: 27

Project Date: 10/9/2008 to 10/12/2008
Agency: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Road 4220 south for 1/2 mile
Description: Removed 4 trees, repaired 1 rock slide, 2 root wads and 1/2 mile of tread.

Volunteers

Hours
Gehring, Dave 30
Gehring, Lance 30
Gehring, Mikah 30
Henderson, Blake 30
Strahm, Ernie 30

Project Total: 150

Project Date: 10/8/2008 to 10/9/2008
Agency: Clackamas River Ranger District
Leader: David Roe
Location: Warm Springs Indian Reservation
Description: Drainage maintenance (8 water bars) south of Warm Springs River. Documented current conditions at Triangle Lake Horse Camp.

Volunteers

Hours
Roe, David 20

Project Total: 20