Volunteer Projects — Pacific Crest Trail Association
Zig Zag Ranger District
10/1/2008 to 9/30/2009

Activity Summary

Scouting: 88
Trail Maintenance (PCT): 783


Total Volunteer Hours: 871

Activity Detail (most recent on top)

Project Date: 9/19/2009 to 9/20/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Cleaned 87 drain dips and 11 water bars. Repaired 30' of slide damage and 40' of tread.

Volunteers

Hours
Owen, Kim 19
Owen, Pam 19

Project Total: 38

Project Date: 9/16/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Repaired 45 drain dips and 25 water bars. Brushed 150' of vine maple, small hemlock and mountain ash. Widened 600' of tread to 24", 150' taking ouside berm off.

Volunteers

Hours
Carr, Pete 9
Goodwin, Katie 8
Goodwin, Ron 8
Hammack, Brice 10
Hanes, Douglas 9
Mikol, Greg 9
Mikol, Joanne 9
Murphy, Des 10
Murray, Michael 10
Ranganathan, Nandini 9

Project Total: 91

Project Date: 8/17/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag River
Description: Cleaned 30 drain dips, 2 water bars and wing ditches. Repaired 3 slide areas, each about 50' wide, spot brushing.

Volunteers

Hours
Hanes, Douglas 10
Martiny, Chuck 10
Meador, Corey 15
Ranganathan, Nandini 10
Ruprecht, Dan 10
Weston, Ruth 10

Project Total: 65

Project Date: 8/10/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Road 5896
Description: Logged out 16 trees. Cleaned 4 drain dips and 8 water bars. Brushed 100 yards.

Volunteers

Hours
Plant, Steve 9
Price, Tracy 9

Project Total: 18

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge northbound
Description: Logged out 1 tree (18"). Overhead limbing. Filled a hole.

Volunteers

Hours
Helm, George 10
Helm, Robin 10
Maffei, Andy 11
Weston, Ruth 11

Project Total: 42

Project Date: 8/8/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls Loop
Description: Logged out 20 trees, cleaned 30 drain dips and 20 water bars. Spot brushing and tread repair over 4 miles. Focused brusing and tread repair for 100 yards.

Volunteers

Hours
Booth, Jeff 10
Carter, Patty 10
Cobb, Roberta 10
Goodwin, Ron 10
Hanes, Douglas 10
Kirchmiller, Robert 10
Konner, Jack 10
Martiny, Chuck 10
O'Neil, Geoff 10
Ranganathan, Nandini 10

Project Total: 100

Project Date: 7/31/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Ramona Falls
Description: Scouting

Volunteers

Hours
Weston, Ruth 11

Project Total: 11

Project Date: 7/27/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail 778
Description: Logged out 16 trees (4" to 44")

Volunteers

Hours
Cobb, Roberta 12
Koppy, Larry 14
Laird, Sye 12
Roe, David 12
Weston, Ruth 13
Woltzen, Hugh 12

Project Total: 75

Project Date: 7/21/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Trail 7778 to Paradise Park Loop North
Description: Scouting

Volunteers

Hours
Weston, Ruth 9

Project Total: 9

Project Date: 7/20/2009
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Trail #778
Description: Scouting

Volunteers

Hours
Van Gundy, Jackie 9
Weston, Ruth 9

Project Total: 18

Project Date: 7/16/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Road 5890
Description: Logged out 10 trees. Repaired 1 root wad damage.

Volunteers

Hours
Plant, Steve 10
Seith, Larry 10

Project Total: 20

Project Date: 7/12/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitial Pass to Little Crater Lake
Description: Logged out 7 trees, cleaned 3 drain dips and 2 water bars, repaired 1 root wad damage, brushed 200 yards.

Volunteers

Hours
Lujan, Melissa 11
Plant, Steve 11
Price, Tracy 11

Project Total: 33

Project Date: 7/6/2009
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Road 240 to Wapinitia Pass
Description: Scouting

Volunteers

Hours
Plant, Steve 6
Price, Tracy 6

Project Total: 12

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls
Description: Scouting

Volunteers

Hours
Corwin, Susan 7
Konner, Jack 9

Project Total: 16

Project Date: 7/3/2009
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Logged out 5 trees, cleaned 14 drain dips and 6 water bars.

Volunteers

Hours
Goodwin, Katie 9
Goodwin, Ron 9

Project Total: 18

Project Date: 6/26/2009 to 6/28/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy Guard Station to Paradise Park
Description: Logged out 15 logs (1-25", 3-18", 2-15", 4-12", 6<8"). Cleaned 20 drain dips, repaired 1 slide, removed 2 root wads, repaired 800 yards of tread along the Sandr River Canyon.

Volunteers

Hours
Fong, April Ann 26
Irwin, Mark 26
McNew, Dave 26
O'Donnell, Erin 26
Owen, Kim 44
Owen, Pam 30
Schmidt, Rick 19
Young, Lee 29

Project Total: 226

Project Date: 6/21/2009
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park
Description: Scouting

Volunteers

Hours
Owen, Kim 11
Owen, Pam 11

Project Total: 22

Project Date: 6/13/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 12 trees (6" - 24").

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11

Project Total: 23

Project Date: 5/23/2009
Agency: Zig Zag Ranger District
Leader: Jerry Bentz
Location: Timothy Lake to Little Crater Lake
Description: Logged out 15 trees (8" - 36"). General brushing.

Volunteers

Hours
Bentz, Jerry 12
Schmeltzen, Jerry 11
Schmeltzen, Molly 11

Project Total: 34