Volunteer Projects — Pacific Crest Trail Association
All Agencies
10/1/2009 to 9/30/2010
Activity Summary |
Administration: | 70 |
Meeting: | 613 |
Recruiting: | 32 |
Scouting: | 144 |
Tools: | 113 |
Trail Maintenance (Feeder): | 23 |
Trail Maintenance (PCT): | 3494 |
Training: | 301 |
Total Volunteer Hours: | 4790 |
Activity Detail (most recent on top) |
Project Date: | 9/18/2010 to 9/19/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Horsetail Creek Trail |
Description: | Crosscut logout with Pete Voodre, CRGNSA to promote agency partner collaboration and deomonstrate PCTA volunteer skills level. Logged out 30 logs and clened a few drain dips and brushing. |
Volunteers |
Hours |
Owen, Kim | 22 |
Owen, Pam | 20 |
Smith, Curtis | 20 |
Project Total: 62 |
Project Date: | 9/11/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Cleaned 70 drain dips and 30 water bars. Brushed 300' huckleberry, 60' mountain hemlock and 50' of fir branches. Repaied 300' of tread. |
Volunteers |
Hours |
Duncan, Tim | 10 |
Goodwin, Ron | 10 |
Halladay, Robert | 10 |
Hanes, Douglas | 10 |
Smith, Curtis | 10 |
Smith, Nyssa | 10 |
Turner, Tammy | 10 |
Wankowicz, Bex | 10 |
Project Total: 80 |
Project Date: | 9/8/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | September caretaker meeting. Guests: None. |
Volunteers |
Hours |
Arkes, Bob | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Goodwin, Ron | 4 |
Hawley, Bill | 4 |
Hovin, Leif | 4 |
Konner, Jack | 4 |
O'Neil, Geoff | 4 |
Owen, Kim | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Webb, Jim | 4 |
Weston, Ruth | 4 |
Project Total: 52 |
Project Date: | 9/1/2010 to 9/5/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Riley Creek, Mount Adams |
Description: | Logged out 2 trees. Cleaned 25 and built 18 drain dips. Cleared 50' of slide damage. Repaired misc. bad spots of tread over two miles north of Riley Creek. Installed 17 new stone check steps. Armored and filled 144 existing stone check steps. Cleaned and restructured 7 creek crossings; armored approaches with stone. Reconstructred exposed metal culvers; armored with stone. Cleaned 6 culverts. Bill Hawley participated as a PCTA employee. |
Volunteers |
Hours |
Booth, Jeff | 59 |
Cobb, Roberta | 41 |
Hawley, Karla | 46 |
Hovin, Leif | 59 |
Winkel, Jeannette | 35 |
Project Total: 240 |
Project Date: | 8/28/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | PCT Day - Between Road 2000 and 2090 |
Description: | Logged out 12 trees. Reconstructed 4 culverts. Removed 3 root wads. Cleared 8x10 corridor for 1.25 miles. |
Volunteers |
Hours |
Benware, Virginia | 10 |
Caldwell, Robert | 9 |
Caputo, Mike | 10 |
Crouse, Bill | 9 |
Cunningham, John | 11 |
Fairchild, Lana | 11 |
Falkenberg, Humaira | 8 |
Garber, Jon | 10 |
Heyl, Jonathan | 10 |
Kelsheimer, Elle | 10 |
Kelsheimer, Sara | 10 |
LaPonite, Daniel | 10 |
Murtaugh, Nikii | 11 |
Owen, Kim | 11 |
Pikkola, Dane | 10 |
Queen, Steve | 11 |
Schooley, Sara | 10 |
Turner, Tammy | 10 |
Vhay, John | 11 |
Webb, Jim | 9 |
Woycechowsky, Doug | 10 |
Project Total: 211 |
Project Date: | 8/28/2010 |
Agency: | N/A |
Leader: | Dennis Beard |
Location: | PCT Day - Outreach and volunteer solicitation |
Description: | Outreach and volunteer solicitation |
Volunteers |
Hours |
Beard, Dennis | 8 |
Brueggermeyer, Marcia | 6 |
Hammack, Brice | 6 |
Linde, Tom | 6 |
Matzke, Liz | 6 |
Project Total: 32 |
Project Date: | 8/22/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Road 2090 to Three Corner Rock |
Description: | Logged out 4 6" trees. Cleaned 20 drain dips. |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 8/11/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | August caretaker meeting (July was canceled). Guests: None. |
Volunteers |
Hours |
Beard, Dennis | 4 |
Cobb, Roberta | 4 |
Goodwin, Ron | 4 |
Hovin, Leif | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Owen, Pam | 4 |
Queen, Steve | 4 |
Vhay, John | 4 |
Weston, Ruth | 4 |
Wolf, Becky | 4 |
Project Total: 44 |
Project Date: | 8/7/2010 to 8/8/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to west side Roraring River Canyon |
Description: | Logged out 4 trees (22", 2x18", 12"). Cleaned 6 drain dips. Repaired 2 slides: 1) 10' section on west side Roaring River Canyon, tread restored; 2) 10' section right above previous one; water damage plus rocks. Reconnected trail at Lost Creen and Roaring River to discourage the creek going down the trail about 100' each of repair. Filled a hole on west side of Zig Zag Canyon as the trail leads out of the canyon. |
Volunteers |
Hours |
Cobb, Roberta | 19 |
Hanes, Douglas | 19 |
Ranganathan, Nandini | 19 |
Weston, Ruth | 19 |
Project Total: 76 |
Project Date: | 7/30/2010 to 8/1/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Road 23 to Horseshoe Meadow |
Description: | Logged out 20 trees. Cleaned 125 drain dips. Brushed overstory. Repaired 200 yards of trail between Road 23 and Williams Min Trailhead. Check step repair and instalation of climb area 1/4 mile above junction of trail 64A. Installed PCT logs from Road 23 to junction of trail 64A. |
Volunteers |
Hours |
Arkes, Bob | 34 |
Arkes, Jane | 34 |
Carr, Pete | 27 |
Cooper, Neil | 19 |
Daly, Keith | 25 |
Koppy, Larry | 23 |
Mater, James | 14 |
Mowrey, Kevin | 25 |
Project Total: 201 |
Project Date: | 7/26/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline lodge to North Parasdise Park Junction |
Description: | Logged out four trees. Cut back willows at junction of North Paradise Park. Limbed one log so hikers could get by easily. |
Volunteers |
Hours |
Turner, Tammy | 11 |
Weston, Ruth | 11 |
Project Total: 22 |
Project Date: | 7/24/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Road 58 to Little Crater Lake |
Description: | Logged out 12 trees. Cleaned 5 drain dips and 4 water bars. Spot brushing of huckleberry and tree saplins. |
Volunteers |
Hours |
Plant, Steve | 9 |
Price, Tracy | 9 |
Project Total: 18 |
Project Date: | 7/22/2010 to 7/24/2010 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Indian Springs to Indian Mountain |
Description: | Cleaned 6 drain dips. Brushed and repaired tread on 1000' of trail. Constructred 180 feet of rock retaining wall on both sides of trail and 220 feet of single (uphill) retaining wall per Ken Kollas. |
Volunteers |
Hours |
Barnett, AJ | 11 |
Donovan, Katie | 11 |
Hopkins, Levi | 11 |
Koppy, Larry | 20 |
Melander, David | 26 |
Miller, Garth | 11 |
Nanson, Sarah | 11 |
Regehr, Don | 11 |
Vhay, John | 26 |
Project Total: 138 |
Project Date: | 7/19/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag River |
Description: | Logged out 9 trees. Cleaned six drain dips. Brushed 100' by the wet wall. |
Volunteers |
Hours |
Beckwith, Bozeb | 7 |
Carr, Pete | 9 |
Hanes, Douglas | 9 |
Koppy, Larry | 10 |
Meador, Corey | 14 |
Pikkola, Dane | 8 |
Ranganathan, Nandini | 8 |
Weston, Ruth | 8 |
Project Total: 73 |
Project Date: | 7/17/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Patty Carter |
Location: | Lolo Pass to Muddy Fork |
Description: | Logged out 6 trees. |
Volunteers |
Hours |
Carter, Patty | 10 |
O'Neil, Geoff | 10 |
Project Total: 20 |
Project Date: | 7/16/2010 to 7/18/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Ernie Strahm |
Location: | Jude Lake to Jefferson Wilderness Boundary |
Description: | Logged out 95 trees (3"-18"). Cleaned 5 waterbars and repaired 1 slide. |
Volunteers |
Hours |
Cuerden-Robertson, Becky | 18 |
Robertson, Clyde | 18 |
Strahm, Ernie | 20 |
Ugrai, Miklos | 17 |
Project Total: 73 |
Project Date: | 7/16/2010 to 7/17/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Indian Heaven - Blue Lake |
Description: | Logged out 52 trees (32: <6", 9: 6"-12", 11: >12"). |
Volunteers |
Hours |
Hawley, Karla | 16 |
Hovin, Leif | 12 |
Winkel, Jeannette | 12 |
Project Total: 40 |
Project Date: | 7/15/2010 to 7/17/2010 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Indian Springs to Indian Mountain |
Description: | Cleaned 4 drain dips and 3 water bars. Rebuilt 100 feet of tread installing 3 feet of retaining rock wall and lower wall to hold tread. Filled trail and compacted soil. Decommissioned illegal campsites at Wahtum Lake. |
Volunteers |
Hours |
Hanes, Douglas | 21 |
Squires, Bob | 9 |
Vhay, John | 21 |
Project Total: 51 |
Project Date: | 7/13/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to east rim of Zig Zag Canyon |
Description: | Scouting. |
Volunteers |
Hours |
Weston, Ruth | 7 |
Project Total: 7 |
Project Date: | 7/13/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Jim Webb |
Location: | Trout Creek toward Sedum Ridge |
Description: | Brushing and limbing with group. |
Volunteers |
Hours |
Webb, Jim | 10 |
Project Total: 10 |
Project Date: | 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass ot Road 240 |
Description: | Logged out 9 trees (6" to 24"). Cleaned 4 drain dips and 3 water bars. Spot brushing of huckleberry on lower 1 mile of trails and rhododendron on upper. |
Volunteers |
Hours |
Plant, Steve | 10 |
Price, Tracy | 10 |
Project Total: 20 |
Project Date: | 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Patty Carter |
Location: | Lolo Pass to Muddy Fork |
Description: | Scouting. 6 small and 2 large trees moved from the trail. |
Volunteers |
Hours |
Carter, Patty | 10 |
O'Neil, Geoff | 10 |
Project Total: 20 |
Project Date: | 7/9/2010 to 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Paradise Park |
Description: | Logged out 15 trees (1: 28", 10: 12"-20", 4: <12"). Cleaned 33 drain dips. Brushed 1.25 miles from 4200' to 4800'. Worked on boggy slope near spring to control sliding mud. Removed berm in several areas of cupped trail. |
Volunteers |
Hours |
Cunningham, John | 17 |
Hovin, Leif | 17 |
Koppy, Larry | 18 |
Legg, Nick | 17 |
O'Donnell, Erin | 17 |
Owen, Kim | 23 |
Owen, Pam | 19 |
Schmidt, Rick | 15 |
Smith, Curtis | 17 |
Weston, Ruth | 17 |
Project Total: 177 |
Project Date: | 7/8/2010 to 7/10/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Lemiti Meadows |
Description: | Trail maintenance. |
Volunteers |
Hours |
Boeckman, Renee | 19 |
Hunt, Donna | 13 |
Levy, Kathy | 19 |
Patterson, Bob | 13 |
Project Total: 64 |
Project Date: | 7/8/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Logged out 25 trees (8: 4"-8"), 12: 9"-15"), 5: 16"-25"). Cleaned 30 drain dips and 7 waterbars. Cut back 50' of inside slope on lower slide area. Brushed 150' of huckleberry and vine maple. Repaired 25' of tread. Limbed 75' to 8x10 standard. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Hanes, Douglas | 9 |
Hansen, Kara | 9 |
Melander, David | 9 |
Project Total: 45 |
Project Date: | 7/8/2010 to 7/10/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Timpothy Lake to Pinhead Saddle |
Description: | Logged out 45 trees. |
Volunteers |
Hours |
DeVall, Dolores | 20 |
DeVall, Marty | 20 |
Hunt, Bob | 22 |
Hunt, Pat | 22 |
Kinish, Korinne | 20 |
McBurnie, Mary Ann | 14 |
Sischo, Gary | 21 |
Sischo, Peg | 21 |
Stodick, Katie | 14 |
Wolf, Becky | 23 |
Project Total: 197 |
Project Date: | 7/8/2010 to 7/9/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Olallie Lake to Lodgepole acess trail |
Description: | Logged out 12 trees on 7/8 and 25 trees on 7/9. |
Volunteers |
Hours |
Bentz, Jerry | 9 |
Bowen, Steve | 16 |
Farrier, Bruce | 16 |
Farrier, Melissa | 16 |
Heath, Kirk | 9 |
Lister, Norlene | 9 |
Livermore, Rich | 16 |
Livermore, Stacy | 16 |
Schlitt, Barbara | 16 |
Stockman, Bonnie | 9 |
Warren, Jack | 16 |
Project Total: 148 |
Project Date: | 7/5/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge |
Description: | Aborted scouting (too much snow). |
Volunteers |
Hours |
Weston, Ruth | 4 |
Project Total: 4 |
Project Date: | 7/2/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Scouting. Removed 6 small trees with a hand saw. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Project Total: 18 |
Project Date: | 7/1/2010 to 7/3/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Sedum Ridge |
Description: | Cleaned up 3 rotten logs. Cut and removed 3 logs (8" to 14"). 1.25 miles of brushing with a power brusher (3/4 mile was heavy). |
Volunteers |
Hours |
Carr, Pete | 19 |
Hansen, Kara | 11 |
Hawley, Karla | 9 |
Hovin, Leif | 9 |
Lillesand, Mike | 19 |
Mater, James | 9 |
Owen, Kim | 9 |
Rosenberg, Rae | 9 |
Von Jenef, Amy | 9 |
Webb, Jim | 9 |
Project Total: 112 |
Project Date: | 6/27/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Nick Eaton Ridge |
Description: | Logout. Accompanied by Pete Voodre. |
Volunteers |
Hours |
Owen, Kim | 13 |
Owen, Pam | 10 |
Project Total: 23 |
Project Date: | 6/23/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek bridge |
Description: | Installed 9' gabion with curb log to stabilize slide area. Bill Hawley participated as PCTA staff. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Carr, Pete | 11 |
Cunningham, John | 12 |
Garber, Jon | 9 |
Gifford, Bill | 9 |
Hilands, Bill | 10 |
Turner, Tammy | 9 |
Project Total: 70 |
Project Date: | 6/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Road 23 to Mount Adams Wilderness boundary |
Description: | Logged out 9 trees (6" to 20"). Cleaned drain dips, brushed, tread repair. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Hawley, Bill | 10 |
Mikol, Greg | 10 |
Murray, Michael | 10 |
Squires, Bob | 8 |
Turner, Tammy | 10 |
Weston, Ruth | 10 |
Project Total: 68 |
Project Date: | 6/20/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass south |
Description: | Logged out 25 trees (5: B logs, 20 A logs). |
Volunteers |
Hours |
Caldwell, Robert | 8 |
Cobb, Roberta | 12 |
Covey, Kathy | 9 |
Hanes, Douglas | 8 |
Koppy, Larry | 10 |
Mater, James | 8 |
McKinstry, Mindy | 8 |
Ranganathan, Nandini | 8 |
Project Total: 71 |
Project Date: | 6/12/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River crossing |
Description: | Tread rehab. |
Volunteers |
Hours |
Curtain, Gavin | 12 |
Curtain, Joe | 12 |
Gustafson, Nicholas | 12 |
Owen, Kim | 17 |
Phillips, Luke | 12 |
Phillips, Mark | 12 |
Phillips, Tom | 12 |
Pool, Chris | 12 |
Pool, Fred | 12 |
Reichle, Dave | 12 |
Whalen, Dan | 12 |
Whalen, Jeff | 12 |
Project Total: 149 |
Project Date: | 6/12/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Rushing Water Creek |
Description: | Scouting |
Volunteers |
Hours |
O'Neil, Geoff | 11 |
Project Total: 11 |
Project Date: | 6/11/2010 to 6/12/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Crest Camp to Big Huckleberry Mountain |
Description: | Loggeed out 17 trees (9: < 10", 8: 10"-18"). Cleaned 22 drain dips. Brushed 3/4 mile with power brusher. Spot berm removal, widening and grading on 1.5 miles. |
Volunteers |
Hours |
Appling, Bob | 22 |
Bilyeu, Katherine | 22 |
Booth, Jeff | 21 |
Carr, Pete | 22 |
Garber, Jon | 13 |
Hawley, Bill | 51 |
Hawley, Karla | 37 |
Hovin, Leif | 21 |
Koppy, Larry | 22 |
Mater, Elana | 6 |
Mater, James | 17 |
Mikol, Greg | 13 |
Pikkola, Dane | 21 |
Turner, Tammy | 13 |
Warner, Ray | 14 |
Warner, Sam | 14 |
Winkel, Jeannette | 21 |
Project Total: 350 |
Project Date: | 6/9/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | June caretaker meeting. Guests: None. |
Volunteers |
Hours |
Appling, Bob | 4 |
Arkes, Bob | 4 |
Bentz, Jerry | 4 |
Bilyeu, Katherine | 4 |
Cobb, Roberta | 4 |
Hawley, Bill | 4 |
Hovin, Leif | 4 |
Owen, Kim | 4 |
Owen, Pam | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Webb, Jim | 4 |
Weston, Ruth | 4 |
Project Total: 52 |
Project Date: | 5/30/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Road 58 area |
Description: | Logged out 13 trees (all under 6" with axe and hand saw). Brushed huckleberry for 2.5 miles. |
Volunteers |
Hours |
Plant, Steve | 8 |
Price, Tracy | 8 |
Project Total: 16 |
Project Date: | 5/23/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Logged out 3 trees (2 A on the PCT and 1 B on the Twin Lakes Trail). |
Volunteers |
Hours |
Ames, Julie | 5 |
Cobb, Roberta | 6 |
Project Total: 11 |
Project Date: | 5/21/2010 to 5/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Sabler to Bridge of the Gods |
Description: | Scouting. Cleared 16 logs 3"-10". |
Volunteers |
Hours |
Owen, Kim | 21 |
Owen, Pam | 21 |
Project Total: 42 |
Project Date: | 5/17/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Logged out 7 trees (6 A size, 1 small B) |
Volunteers |
Hours |
Brown, Maureen | 6 |
Cobb, Roberta | 6 |
Neitch, Ulli | 6 |
Project Total: 18 |
Project Date: | 5/14/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | Scouting. |
Volunteers |
Hours |
Plant, Steve | 9 |
Project Total: 9 |
Project Date: | 5/13/2010 to 5/14/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Saw training at Trout Lake |
Description: | NWSA crosscut saw training and certification |
Volunteers |
Hours |
Owen, Kim | 19 |
Project Total: 19 |
Project Date: | 5/12/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | May caretaker meeting. Guests: None. |
Volunteers |
Hours |
Cobb, Roberta | 4 |
Hawley, Bill | 4 |
Hovin, Leif | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Weston, Ruth | 4 |
Wolf, Becky | 4 |
Project Total: 36 |
Project Date: | 5/2/2010 |
Agency: | N/A |
Leader: | Kim Owen |
Location: | Radio programming |
Description: | Programmed radios for Dana Berthold |
Volunteers |
Hours |
Owen, Kim | 3 |
Project Total: 3 |
Project Date: | 4/14/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | April caretaker meeting. Guests: None. |
Volunteers |
Hours |
Appling, Bob | 4 |
Beard, Dennis | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Goodwin, Ron | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Weston, Ruth | 4 |
Project Total: 44 |
Project Date: | 4/10/2010 |
Agency: | Columbia River Gorge |
Leader: | Steve Queen |
Location: | Greenleaf Creek to swale below Carpenters Lake trail junction |
Description: | Performed 600' of tread rehab in the swale. Removed 18" log. Cut back vine maple from the switchback climbing northbound out of the swale. Removed rotten bridge below swale. Repaired water bars and wing ditches on north side of Greenleaf Creek bridge and the perenial spring between there and the swale. Also cut out a many branched tree that was an annual trail encroachment problem. Installed signs at the clearcut south of Greenleaf Creek. |
Volunteers |
Hours |
Booth, Jeff | 10 |
Cather, Robert | 10 |
Cobb, Dave | 10 |
Dolinar, Brian | 10 |
Dolinar, Lynn | 10 |
Hawley, Bill | 10 |
Kliewer, Dave | 10 |
Mater, James | 10 |
Pikkola, Dane | 10 |
Queen, Steve | 10 |
Warner, Sam | 10 |
Project Total: 110 |
Project Date: | 4/3/2010 |
Agency: | Columbia River Gorge |
Leader: | Steve Queen |
Location: | Bridge of the Gods to Herman Bridge trail junction |
Description: | Two crews improved trail through rock slide sections. Another crew posted new signs at Moody Street and Dry Creek. Accompined by Bruce Dungey. |
Volunteers |
Hours |
Bronstein, Bill | 9 |
Caldwell, Robert | 9 |
Cobb, Dave | 9 |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Osborne, Jordan | 7 |
Pikkola, Dane | 9 |
Queen, Steve | 9 |
Squires, Bob | 9 |
Project Total: 79 |
Project Date: | 4/1/2010 to 4/30/2010 |
Agency: | N/A |
Leader: | Kim Owen |
Location: | Admin |
Description: | Budget prep and management |
Volunteers |
Hours |
Owen, Kim | 7 |
Project Total: 7 |
Project Date: | 3/18/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Radio testing in Columbia Gorge |
Description: | Radio programming and field testing in the Columbia River Gorge NSA. |
Volunteers |
Hours |
Owen, Kim | 14 |
Owen, Pam | 7 |
Project Total: 21 |
Project Date: | 3/17/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek to Carpenters Lake Junction |
Description: | Scouted for trail maintenance and crew needs. In attendance: Jim Proctor. |
Volunteers |
Hours |
Hawley, Bill | 11 |
Project Total: 11 |
Project Date: | 3/17/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Radio dispatch meeting at GPNF headquarters |
Description: | PCTA/USFS radio dispatch meeting |
Volunteers |
Hours |
Arkes, Bob | 5 |
Owen, Kim | 8 |
Roe, David | 5 |
Project Total: 18 |
Project Date: | 3/10/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | March caretaker meeting. Guests: None. |
Volunteers |
Hours |
Beard, Dennis | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Webb, Jim | 5 |
Wolf, Becky | 4 |
Project Total: 37 |
Project Date: | 3/8/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 68 to Big Huckleberry Mountain |
Description: | Logged out 11 trees (3: 12"-24", 8: 4"-12"). Repaired 4 slides (20'-40'). Brushed 8x10 corridor. 1/8 mile slough removal. |
Volunteers |
Hours |
Arkes, Bob | 13 |
Carr, Pete | 13 |
Hawley, Bill | 19 |
Hawley, Karla | 2 |
Martiny, Chuck | 13 |
Warner, Sam | 13 |
Webb, Jim | 13 |
Project Total: 86 |
Project Date: | 2/27/2010 |
Agency: | N/A |
Leader: | Roberta Cobb |
Location: | Portland Tool Cache |
Description: | Checked first aid kits and replaced expired meds.Sharpened tools. Engraved cross-cut saws. Inventoried all tools. Checked for broken or misfitting tools. Put together new hard hats. Reefilled chainsaw cas containers. Painted handles. Improved storage systems. |
Volunteers |
Hours |
Arkes, Bob | 6 |
Beard, Dennis | 5 |
Bentz, Jerry | 6 |
Cobb, Roberta | 8 |
Hammack, Brice | 6 |
Hawley, Bill | 2 |
Vhay, John | 6 |
Weston, Ruth | 2 |
Project Total: 41 |
Project Date: | 2/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 2070 |
Description: | Logged out 11 trees (7 - under 10", 3 - 10" to 24", 1 - rotton 30"), cleared 5 slides between 15' and 20' each. Trimmed 8x10 corridor. Repaired tread where crushed by log. |
Volunteers |
Hours |
Hawley, Bill | 12 |
Martiny, Chuck | 12 |
Warner, Sam | 12 |
Project Total: 36 |
Project Date: | 2/13/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Annual Meeting, Gifford Pinchot NF Headquarters |
Description: |
Volunteers |
Hours |
Arkes, Bob | 14 |
Beard, Dennis | 6 |
Cobb, Roberta | 7 |
Goodwin, Ron | 4 |
Hawley, Bill | 19 |
Hawley, Karla | 5 |
Konner, Jack | 5 |
Owen, Kim | 4 |
Owen, Pam | 4 |
Plant, Steve | 4 |
Queen, Steve | 19 |
Vhay, John | 4 |
Webb, Jim | 7 |
Wolf, Becky | 4 |
Project Total: 106 |
Project Date: | 2/10/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | February caretaker meeting. Guests: None. |
Volunteers |
Hours |
Arkes, Bob | 4 |
Beard, Dennis | 4 |
Goodwin, Ron | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Queen, Steve | 4 |
Webb, Jim | 5 |
Project Total: 29 |
Project Date: | 1/21/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Road 2000 to Sedum Ridge |
Description: | Scouting. Removed 6 small logs, scattered branches and many loose rocks. Cleaned large pooling drain dip. |
Volunteers |
Hours |
Owen, Kim | 7 |
Owen, Pam | 7 |
Project Total: 14 |
Project Date: | 1/18/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Jim Webb |
Location: | Trout Creek toward Sedum Ridge |
Description: | Scouting. General cleanup of brush, rock and small log removal. |
Volunteers |
Hours |
Webb, Jim | 7 |
Project Total: 7 |
Project Date: | 1/13/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | January caretaker meeting. Guests: Dana Berthold, Isaac Daniel. |
Volunteers |
Hours |
Arkes, Bob | 4 |
Beard, Dennis | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Goodwin, Ron | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Queen, Steve | 4 |
Vhay, John | 4 |
Webb, Jim | 5 |
Wolf, Becky | 4 |
Project Total: 49 |
Project Date: | 1/6/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Annual meeting committee meeting |
Description: | Committee meeting at Bob Arke's house |
Volunteers |
Hours |
Arkes, Bob | 2 |
Hawley, Bill | 4 |
Turner, Tammy | 4 |
Project Total: 10 |
Project Date: | 1/1/2010 to 9/30/2010 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Administration |
Description: | Administration |
Volunteers |
Hours |
Goodwin, Ron | 18 |
Owen, Kim | 13 |
Project Total: 31 |
Project Date: | 12/9/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | December caretaker meeting. Guests: None. |
Volunteers |
Hours |
Beard, Dennis | 4 |
Bentz, Jerry | 4 |
Cobb, Roberta | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Weston, Ruth | 4 |
Project Total: 36 |
Project Date: | 11/18/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Annual meeting committee meeting |
Description: | Committee meeting at Steve Queen's house |
Volunteers |
Hours |
Arkes, Bob | 8 |
Hawley, Bill | 8 |
Queen, Steve | 8 |
Turner, Tammy | 8 |
Project Total: 32 |
Project Date: | 11/13/2009 to 11/15/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Cispus Learning Center (Wilderness First Aid Training) |
Description: | WMI wilderness first aid training at Cispus Learning Center outside Randle, WA. |
Volunteers |
Hours |
Adams, Barb | 26 |
Bentz, Jerry | 26 |
Carr, Pete | 26 |
Owen, Kim | 26 |
Queen, Steve | 22 |
Vhay, John | 22 |
Weston, Ruth | 22 |
Wolf, Becky | 22 |
Project Total: 192 |
Project Date: | 11/11/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | November caretaker meeting. Guests: None. |
Volunteers |
Hours |
Arkes, Bob | 4 |
Bentz, Jerry | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Owen, Kim | 4 |
Plant, Steve | 4 |
Queen, Steve | 4 |
Project Total: 28 |
Project Date: | 11/9/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek north |
Description: | Removed 21 logs, cleaned drain dips, brushed for 3/4 mile. |
Volunteers |
Hours |
Appling, Bob | 12 |
Arkes, Bob | 10 |
Beard, Dennis | 10 |
Bilyeu, Katherine | 12 |
Davidson, Tom | 10 |
Hawley, Bill | 11 |
Hilands, Bill | 10 |
Kremer, Terry | 11 |
Martiny, Chuck | 11 |
Spartis, Diana | 10 |
Project Total: 107 |
Project Date: | 11/7/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Hopewell house (Wilderness First Aid Training) |
Description: | Wilderness first aid training with Mason Marsh |
Volunteers |
Hours |
Arkes, Bob | 10 |
Beard, Dennis | 10 |
Camper, Bill | 10 |
Cobb, Roberta | 10 |
Hanes, Douglas | 10 |
Hawley, Bill | 10 |
Konner, Jack | 10 |
Ranganathan, Nandini | 10 |
Turner, Tammy | 10 |
Project Total: 90 |
Project Date: | 11/6/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek north |
Description: | Scouting |
Volunteers |
Hours |
Warner, Sam | 8 |
Project Total: 8 |
Project Date: | 10/28/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Dry Creek to Hatfield Wilderness boundary |
Description: | Removed 4 small logs. Miscellaneous limb removal. Repaired 3 small slides caused by elk and deer. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 10/22/2009 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Wind River tool cache |
Description: | Tool purchase and repair |
Volunteers |
Hours |
Arkes, Bob | 7 |
Hawley, Bill | 7 |
Project Total: 14 |
Project Date: | 10/21/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Annual meeting committee meeting |
Description: | Committee meeting at Steve Queen's house |
Volunteers |
Hours |
Arkes, Bob | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Queen, Steve | 2 |
Project Total: 14 |
Project Date: | 10/14/2009 |
Agency: | N/A |
Leader: | Bob Arkes |
Location: | Trout Lake tool cache |
Description: | Cleaned, sharpened and stored tools for the winter. Power tools and first aid kits returned to Portland for winter storage. |
Volunteers |
Hours |
Arkes, Bob | 9 |
Hammack, Brice | 9 |
Hawley, Bill | 9 |
Webb, Jim | 7 |
Project Total: 34 |
Project Date: | 10/14/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | REI Clackamas Town Center (Caretaker meeting) |
Description: | October caretaker meeting. Guests: Jeff Booth, Bob Appling, Katherine Bilyeu, Brice Hammack. |
Volunteers |
Hours |
Appling, Bob | 4 |
Arkes, Bob | 4 |
Bentz, Jerry | 4 |
Bilyeu, Katherine | 4 |
Booth, Jeff | 4 |
Hammack, Brice | 4 |
Hawley, Bill | 4 |
Konner, Jack | 4 |
Queen, Steve | 4 |
Webb, Jim | 4 |
Weston, Ruth | 4 |
Project Total: 44 |
Project Date: | 10/10/2009 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Greenleaf Bridge |
Description: | Armored the west bridge footing of the bridge over Greenleaf Creek. Dug a trench, placed large boulders in it, laid som wire fencing to provide erosion controo, and then piled many boulders and rocks up the slope. Decommissioned the use trail that led down that side. Cleaned the bridge. |
Volunteers |
Hours |
Budnick, Debi | 11 |
Carr, Pete | 12 |
Cobb, Roberta | 11 |
Covey, Kathy | 13 |
Gifford, Bill | 11 |
Hawley, Bill | 13 |
Koskamp, David | 13 |
Martin, Greg | 11 |
Smith, Curtis | 12 |
Warner, Sam | 11 |
Project Total: 118 |
Project Date: | 10/4/2009 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Repaired many drain dips, light brushing and slough removal for 3 miles. |
Volunteers |
Hours |
Booth, Jeff | 9 |
Bunting, Clint | 9 |
Carr, Pete | 9 |
Cather, Robert | 9 |
Cobb, Roberta | 8 |
Covey, Kathy | 10 |
Dolinar, Brian | 9 |
Spartis, Diana | 9 |
Project Total: 72 |
Project Date: | 10/2/2009 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Greenleaf Bridge |
Description: | Scouting |
Volunteers |
Hours |
Cobb, Roberta | 4 |
Project Total: 4 |
Project Date: | 10/1/2009 to 12/31/2009 |
Agency: | N/A |
Leader: | Steve Queen |
Location: | Administration |
Description: | Administration |
Volunteers |
Hours |
Cobb, Roberta | 16 |
Hawley, Bill | 16 |
Project Total: 32 |