Volunteer Projects — Pacific Crest Trail Association
Columbia River Gorge
10/1/2009 to 9/30/2010

Activity Summary

Scouting: 26
Tools: 21
Trail Maintenance (Feeder): 23
Trail Maintenance (PCT): 794


Total Volunteer Hours: 864

Activity Detail (most recent on top)

Project Date: 9/18/2010 to 9/19/2010
Agency: Columbia River Gorge
Leader: Kim Owen
Location: Horsetail Creek Trail
Description: Crosscut logout with Pete Voodre, CRGNSA to promote agency partner collaboration and deomonstrate PCTA volunteer skills level. Logged out 30 logs and clened a few drain dips and brushing.

Volunteers

Hours
Owen, Kim 22
Owen, Pam 20
Smith, Curtis 20

Project Total: 62

Project Date: 8/28/2010
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: PCT Day - Between Road 2000 and 2090
Description: Logged out 12 trees. Reconstructed 4 culverts. Removed 3 root wads. Cleared 8x10 corridor for 1.25 miles.

Volunteers

Hours
Benware, Virginia 10
Caldwell, Robert 9
Caputo, Mike 10
Crouse, Bill 9
Cunningham, John 11
Fairchild, Lana 11
Falkenberg, Humaira 8
Garber, Jon 10
Heyl, Jonathan 10
Kelsheimer, Elle 10
Kelsheimer, Sara 10
LaPonite, Daniel 10
Murtaugh, Nikii 11
Owen, Kim 11
Pikkola, Dane 10
Queen, Steve 11
Schooley, Sara 10
Turner, Tammy 10
Vhay, John 11
Webb, Jim 9
Woycechowsky, Doug 10

Project Total: 211

Project Date: 8/22/2010
Agency: Columbia River Gorge
Leader: Kim Owen
Location: Road 2090 to Three Corner Rock
Description: Logged out 4 6" trees. Cleaned 20 drain dips.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 6/27/2010
Agency: Columbia River Gorge
Leader: Kim Owen
Location: Nick Eaton Ridge
Description: Logout. Accompanied by Pete Voodre.

Volunteers

Hours
Owen, Kim 13
Owen, Pam 10

Project Total: 23

Project Date: 6/23/2010
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Greenleaf Creek bridge
Description: Installed 9' gabion with curb log to stabilize slide area. Bill Hawley participated as PCTA staff.

Volunteers

Hours
Arkes, Bob 10
Carr, Pete 11
Cunningham, John 12
Garber, Jon 9
Gifford, Bill 9
Hilands, Bill 10
Turner, Tammy 9

Project Total: 70

Project Date: 4/10/2010
Agency: Columbia River Gorge
Leader: Steve Queen
Location: Greenleaf Creek to swale below Carpenters Lake trail junction
Description: Performed 600' of tread rehab in the swale. Removed 18" log. Cut back vine maple from the switchback climbing northbound out of the swale. Removed rotten bridge below swale. Repaired water bars and wing ditches on north side of Greenleaf Creek bridge and the perenial spring between there and the swale. Also cut out a many branched tree that was an annual trail encroachment problem. Installed signs at the clearcut south of Greenleaf Creek.

Volunteers

Hours
Booth, Jeff 10
Cather, Robert 10
Cobb, Dave 10
Dolinar, Brian 10
Dolinar, Lynn 10
Hawley, Bill 10
Kliewer, Dave 10
Mater, James 10
Pikkola, Dane 10
Queen, Steve 10
Warner, Sam 10

Project Total: 110

Project Date: 4/3/2010
Agency: Columbia River Gorge
Leader: Steve Queen
Location: Bridge of the Gods to Herman Bridge trail junction
Description: Two crews improved trail through rock slide sections. Another crew posted new signs at Moody Street and Dry Creek. Accompined by Bruce Dungey.

Volunteers

Hours
Bronstein, Bill 9
Caldwell, Robert 9
Cobb, Dave 9
Goodwin, Katie 9
Goodwin, Ron 9
Osborne, Jordan 7
Pikkola, Dane 9
Queen, Steve 9
Squires, Bob 9

Project Total: 79

Project Date: 3/18/2010
Agency: Columbia River Gorge
Leader: Kim Owen
Location: Radio testing in Columbia Gorge
Description: Radio programming and field testing in the Columbia River Gorge NSA.

Volunteers

Hours
Owen, Kim 14
Owen, Pam 7

Project Total: 21

Project Date: 3/17/2010
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Greenleaf Creek to Carpenters Lake Junction
Description: Scouted for trail maintenance and crew needs. In attendance: Jim Proctor.

Volunteers

Hours
Hawley, Bill 11

Project Total: 11

Project Date: 1/21/2010
Agency: Columbia River Gorge
Leader: Kim Owen
Location: Road 2000 to Sedum Ridge
Description: Scouting. Removed 6 small logs, scattered branches and many loose rocks. Cleaned large pooling drain dip.

Volunteers

Hours
Owen, Kim 7
Owen, Pam 7

Project Total: 14

Project Date: 11/9/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Greenleaf Creek north
Description: Removed 21 logs, cleaned drain dips, brushed for 3/4 mile.

Volunteers

Hours
Appling, Bob 12
Arkes, Bob 10
Beard, Dennis 10
Bilyeu, Katherine 12
Davidson, Tom 10
Hawley, Bill 11
Hilands, Bill 10
Kremer, Terry 11
Martiny, Chuck 11
Spartis, Diana 10

Project Total: 107

Project Date: 11/6/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Greenleaf Creek north
Description: Scouting

Volunteers

Hours
Warner, Sam 8

Project Total: 8

Project Date: 10/28/2009
Agency: Columbia River Gorge
Leader: Bill Hawley
Location: Dry Creek to Hatfield Wilderness boundary
Description: Removed 4 small logs. Miscellaneous limb removal. Repaired 3 small slides caused by elk and deer.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 10/10/2009
Agency: Columbia River Gorge
Leader: Roberta Cobb
Location: Greenleaf Bridge
Description: Armored the west bridge footing of the bridge over Greenleaf Creek. Dug a trench, placed large boulders in it, laid som wire fencing to provide erosion controo, and then piled many boulders and rocks up the slope. Decommissioned the use trail that led down that side. Cleaned the bridge.

Volunteers

Hours
Budnick, Debi 11
Carr, Pete 12
Cobb, Roberta 11
Covey, Kathy 13
Gifford, Bill 11
Hawley, Bill 13
Koskamp, David 13
Martin, Greg 11
Smith, Curtis 12
Warner, Sam 11

Project Total: 118

Project Date: 10/2/2009
Agency: Columbia River Gorge
Leader: Roberta Cobb
Location: Greenleaf Bridge
Description: Scouting

Volunteers

Hours
Cobb, Roberta 4

Project Total: 4