Volunteer Projects — Pacific Crest Trail Association
Columbia River Gorge
10/1/2009 to 9/30/2010
Activity Summary |
Scouting: | 26 |
Tools: | 21 |
Trail Maintenance (Feeder): | 23 |
Trail Maintenance (PCT): | 794 |
Total Volunteer Hours: | 864 |
Activity Detail (most recent on top) |
Project Date: | 9/18/2010 to 9/19/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Horsetail Creek Trail |
Description: | Crosscut logout with Pete Voodre, CRGNSA to promote agency partner collaboration and deomonstrate PCTA volunteer skills level. Logged out 30 logs and clened a few drain dips and brushing. |
Volunteers |
Hours |
Owen, Kim | 22 |
Owen, Pam | 20 |
Smith, Curtis | 20 |
Project Total: 62 |
Project Date: | 8/28/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | PCT Day - Between Road 2000 and 2090 |
Description: | Logged out 12 trees. Reconstructed 4 culverts. Removed 3 root wads. Cleared 8x10 corridor for 1.25 miles. |
Volunteers |
Hours |
Benware, Virginia | 10 |
Caldwell, Robert | 9 |
Caputo, Mike | 10 |
Crouse, Bill | 9 |
Cunningham, John | 11 |
Fairchild, Lana | 11 |
Falkenberg, Humaira | 8 |
Garber, Jon | 10 |
Heyl, Jonathan | 10 |
Kelsheimer, Elle | 10 |
Kelsheimer, Sara | 10 |
LaPonite, Daniel | 10 |
Murtaugh, Nikii | 11 |
Owen, Kim | 11 |
Pikkola, Dane | 10 |
Queen, Steve | 11 |
Schooley, Sara | 10 |
Turner, Tammy | 10 |
Vhay, John | 11 |
Webb, Jim | 9 |
Woycechowsky, Doug | 10 |
Project Total: 211 |
Project Date: | 8/22/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Road 2090 to Three Corner Rock |
Description: | Logged out 4 6" trees. Cleaned 20 drain dips. |
Volunteers |
Hours |
Owen, Kim | 10 |
Owen, Pam | 10 |
Project Total: 20 |
Project Date: | 6/27/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Nick Eaton Ridge |
Description: | Logout. Accompanied by Pete Voodre. |
Volunteers |
Hours |
Owen, Kim | 13 |
Owen, Pam | 10 |
Project Total: 23 |
Project Date: | 6/23/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek bridge |
Description: | Installed 9' gabion with curb log to stabilize slide area. Bill Hawley participated as PCTA staff. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Carr, Pete | 11 |
Cunningham, John | 12 |
Garber, Jon | 9 |
Gifford, Bill | 9 |
Hilands, Bill | 10 |
Turner, Tammy | 9 |
Project Total: 70 |
Project Date: | 4/10/2010 |
Agency: | Columbia River Gorge |
Leader: | Steve Queen |
Location: | Greenleaf Creek to swale below Carpenters Lake trail junction |
Description: | Performed 600' of tread rehab in the swale. Removed 18" log. Cut back vine maple from the switchback climbing northbound out of the swale. Removed rotten bridge below swale. Repaired water bars and wing ditches on north side of Greenleaf Creek bridge and the perenial spring between there and the swale. Also cut out a many branched tree that was an annual trail encroachment problem. Installed signs at the clearcut south of Greenleaf Creek. |
Volunteers |
Hours |
Booth, Jeff | 10 |
Cather, Robert | 10 |
Cobb, Dave | 10 |
Dolinar, Brian | 10 |
Dolinar, Lynn | 10 |
Hawley, Bill | 10 |
Kliewer, Dave | 10 |
Mater, James | 10 |
Pikkola, Dane | 10 |
Queen, Steve | 10 |
Warner, Sam | 10 |
Project Total: 110 |
Project Date: | 4/3/2010 |
Agency: | Columbia River Gorge |
Leader: | Steve Queen |
Location: | Bridge of the Gods to Herman Bridge trail junction |
Description: | Two crews improved trail through rock slide sections. Another crew posted new signs at Moody Street and Dry Creek. Accompined by Bruce Dungey. |
Volunteers |
Hours |
Bronstein, Bill | 9 |
Caldwell, Robert | 9 |
Cobb, Dave | 9 |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Osborne, Jordan | 7 |
Pikkola, Dane | 9 |
Queen, Steve | 9 |
Squires, Bob | 9 |
Project Total: 79 |
Project Date: | 3/18/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Radio testing in Columbia Gorge |
Description: | Radio programming and field testing in the Columbia River Gorge NSA. |
Volunteers |
Hours |
Owen, Kim | 14 |
Owen, Pam | 7 |
Project Total: 21 |
Project Date: | 3/17/2010 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek to Carpenters Lake Junction |
Description: | Scouted for trail maintenance and crew needs. In attendance: Jim Proctor. |
Volunteers |
Hours |
Hawley, Bill | 11 |
Project Total: 11 |
Project Date: | 1/21/2010 |
Agency: | Columbia River Gorge |
Leader: | Kim Owen |
Location: | Road 2000 to Sedum Ridge |
Description: | Scouting. Removed 6 small logs, scattered branches and many loose rocks. Cleaned large pooling drain dip. |
Volunteers |
Hours |
Owen, Kim | 7 |
Owen, Pam | 7 |
Project Total: 14 |
Project Date: | 11/9/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek north |
Description: | Removed 21 logs, cleaned drain dips, brushed for 3/4 mile. |
Volunteers |
Hours |
Appling, Bob | 12 |
Arkes, Bob | 10 |
Beard, Dennis | 10 |
Bilyeu, Katherine | 12 |
Davidson, Tom | 10 |
Hawley, Bill | 11 |
Hilands, Bill | 10 |
Kremer, Terry | 11 |
Martiny, Chuck | 11 |
Spartis, Diana | 10 |
Project Total: 107 |
Project Date: | 11/6/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Greenleaf Creek north |
Description: | Scouting |
Volunteers |
Hours |
Warner, Sam | 8 |
Project Total: 8 |
Project Date: | 10/28/2009 |
Agency: | Columbia River Gorge |
Leader: | Bill Hawley |
Location: | Dry Creek to Hatfield Wilderness boundary |
Description: | Removed 4 small logs. Miscellaneous limb removal. Repaired 3 small slides caused by elk and deer. |
Volunteers |
Hours |
Hawley, Bill | 6 |
Project Total: 6 |
Project Date: | 10/10/2009 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Greenleaf Bridge |
Description: | Armored the west bridge footing of the bridge over Greenleaf Creek. Dug a trench, placed large boulders in it, laid som wire fencing to provide erosion controo, and then piled many boulders and rocks up the slope. Decommissioned the use trail that led down that side. Cleaned the bridge. |
Volunteers |
Hours |
Budnick, Debi | 11 |
Carr, Pete | 12 |
Cobb, Roberta | 11 |
Covey, Kathy | 13 |
Gifford, Bill | 11 |
Hawley, Bill | 13 |
Koskamp, David | 13 |
Martin, Greg | 11 |
Smith, Curtis | 12 |
Warner, Sam | 11 |
Project Total: 118 |
Project Date: | 10/2/2009 |
Agency: | Columbia River Gorge |
Leader: | Roberta Cobb |
Location: | Greenleaf Bridge |
Description: | Scouting |
Volunteers |
Hours |
Cobb, Roberta | 4 |
Project Total: 4 |