Volunteer Projects — Pacific Crest Trail Association
Mount Adams Ranger District
10/1/2009 to 9/30/2010

Activity Summary

Scouting: 49
Tools: 14
Trail Maintenance (PCT): 1161
Training: 19


Total Volunteer Hours: 1243

Activity Detail (most recent on top)

Project Date: 9/1/2010 to 9/5/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Riley Creek, Mount Adams
Description: Logged out 2 trees. Cleaned 25 and built 18 drain dips. Cleared 50' of slide damage. Repaired misc. bad spots of tread over two miles north of Riley Creek. Installed 17 new stone check steps. Armored and filled 144 existing stone check steps. Cleaned and restructured 7 creek crossings; armored approaches with stone. Reconstructred exposed metal culvers; armored with stone. Cleaned 6 culverts. Bill Hawley participated as a PCTA employee.

Volunteers

Hours
Booth, Jeff 59
Cobb, Roberta 41
Hawley, Karla 46
Hovin, Leif 59
Winkel, Jeannette 35

Project Total: 240

Project Date: 7/30/2010 to 8/1/2010
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Road 23 to Horseshoe Meadow
Description: Logged out 20 trees. Cleaned 125 drain dips. Brushed overstory. Repaired 200 yards of trail between Road 23 and Williams Min Trailhead. Check step repair and instalation of climb area 1/4 mile above junction of trail 64A. Installed PCT logs from Road 23 to junction of trail 64A.

Volunteers

Hours
Arkes, Bob 34
Arkes, Jane 34
Carr, Pete 27
Cooper, Neil 19
Daly, Keith 25
Koppy, Larry 23
Mater, James 14
Mowrey, Kevin 25

Project Total: 201

Project Date: 7/16/2010 to 7/17/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Indian Heaven - Blue Lake
Description: Logged out 52 trees (32: <6", 9: 6"-12", 11: >12").

Volunteers

Hours
Hawley, Karla 16
Hovin, Leif 12
Winkel, Jeannette 12

Project Total: 40

Project Date: 7/13/2010
Agency: Mount Adams Ranger District
Leader: Jim Webb
Location: Trout Creek toward Sedum Ridge
Description: Brushing and limbing with group.

Volunteers

Hours
Webb, Jim 10

Project Total: 10

Project Date: 7/1/2010 to 7/3/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Sedum Ridge
Description: Cleaned up 3 rotten logs. Cut and removed 3 logs (8" to 14"). 1.25 miles of brushing with a power brusher (3/4 mile was heavy).

Volunteers

Hours
Carr, Pete 19
Hansen, Kara 11
Hawley, Karla 9
Hovin, Leif 9
Lillesand, Mike 19
Mater, James 9
Owen, Kim 9
Rosenberg, Rae 9
Von Jenef, Amy 9
Webb, Jim 9

Project Total: 112

Project Date: 6/22/2010
Agency: Mount Adams Ranger District
Leader: Bob Arkes
Location: Road 23 to Mount Adams Wilderness boundary
Description: Logged out 9 trees (6" to 20"). Cleaned drain dips, brushed, tread repair.

Volunteers

Hours
Arkes, Bob 10
Hawley, Bill 10
Mikol, Greg 10
Murray, Michael 10
Squires, Bob 8
Turner, Tammy 10
Weston, Ruth 10

Project Total: 68

Project Date: 6/11/2010 to 6/12/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Crest Camp to Big Huckleberry Mountain
Description: Loggeed out 17 trees (9: < 10", 8: 10"-18"). Cleaned 22 drain dips. Brushed 3/4 mile with power brusher. Spot berm removal, widening and grading on 1.5 miles.

Volunteers

Hours
Appling, Bob 22
Bilyeu, Katherine 22
Booth, Jeff 21
Carr, Pete 22
Garber, Jon 13
Hawley, Bill 51
Hawley, Karla 37
Hovin, Leif 21
Koppy, Larry 22
Mater, Elana 6
Mater, James 17
Mikol, Greg 13
Pikkola, Dane 21
Turner, Tammy 13
Warner, Ray 14
Warner, Sam 14
Winkel, Jeannette 21

Project Total: 350

Project Date: 5/21/2010 to 5/22/2010
Agency: Mount Adams Ranger District
Leader: Kim Owen
Location: Sabler to Bridge of the Gods
Description: Scouting. Cleared 16 logs 3"-10".

Volunteers

Hours
Owen, Kim 21
Owen, Pam 21

Project Total: 42

Project Date: 5/13/2010 to 5/14/2010
Agency: Mount Adams Ranger District
Leader: Kim Owen
Location: Saw training at Trout Lake
Description: NWSA crosscut saw training and certification

Volunteers

Hours
Owen, Kim 19

Project Total: 19

Project Date: 3/17/2010
Agency: Mount Adams Ranger District
Leader: Kim Owen
Location: Radio dispatch meeting at GPNF headquarters
Description: PCTA/USFS radio dispatch meeting

Volunteers

Hours
Arkes, Bob 5
Owen, Kim 8
Roe, David 5

Project Total: 18

Project Date: 3/8/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 68 to Big Huckleberry Mountain
Description: Logged out 11 trees (3: 12"-24", 8: 4"-12"). Repaired 4 slides (20'-40'). Brushed 8x10 corridor. 1/8 mile slough removal.

Volunteers

Hours
Arkes, Bob 13
Carr, Pete 13
Hawley, Bill 19
Hawley, Karla 2
Martiny, Chuck 13
Warner, Sam 13
Webb, Jim 13

Project Total: 86

Project Date: 2/22/2010
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 2070
Description: Logged out 11 trees (7 - under 10", 3 - 10" to 24", 1 - rotton 30"), cleared 5 slides between 15' and 20' each. Trimmed 8x10 corridor. Repaired tread where crushed by log.

Volunteers

Hours
Hawley, Bill 12
Martiny, Chuck 12
Warner, Sam 12

Project Total: 36

Project Date: 1/18/2010
Agency: Mount Adams Ranger District
Leader: Jim Webb
Location: Trout Creek toward Sedum Ridge
Description: Scouting. General cleanup of brush, rock and small log removal.

Volunteers

Hours
Webb, Jim 7

Project Total: 7

Project Date: 10/22/2009
Agency: Mount Adams Ranger District
Leader: Bill Hawley
Location: Wind River tool cache
Description: Tool purchase and repair

Volunteers

Hours
Arkes, Bob 7
Hawley, Bill 7

Project Total: 14