10/1/2009 to 9/30/2010
Activity Summary |
Scouting: | 49 |
Tools: | 14 |
Trail Maintenance (PCT): | 1161 |
Training: | 19 |
Total Volunteer Hours: | 1243 |
Activity Detail (most recent on top) |
Project Date: | 9/1/2010 to 9/5/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Riley Creek, Mount Adams |
Description: | Logged out 2 trees. Cleaned 25 and built 18 drain dips. Cleared 50' of slide damage. Repaired misc. bad spots of tread over two miles north of Riley Creek. Installed 17 new stone check steps. Armored and filled 144 existing stone check steps. Cleaned and restructured 7 creek crossings; armored approaches with stone. Reconstructred exposed metal culvers; armored with stone. Cleaned 6 culverts. Bill Hawley participated as a PCTA employee. |
Volunteers |
Hours |
Booth, Jeff | 59 |
Cobb, Roberta | 41 |
Hawley, Karla | 46 |
Hovin, Leif | 59 |
Winkel, Jeannette | 35 |
Project Total: 240 |
Project Date: | 7/30/2010 to 8/1/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Road 23 to Horseshoe Meadow |
Description: | Logged out 20 trees. Cleaned 125 drain dips. Brushed overstory. Repaired 200 yards of trail between Road 23 and Williams Min Trailhead. Check step repair and instalation of climb area 1/4 mile above junction of trail 64A. Installed PCT logs from Road 23 to junction of trail 64A. |
Volunteers |
Hours |
Arkes, Bob | 34 |
Arkes, Jane | 34 |
Carr, Pete | 27 |
Cooper, Neil | 19 |
Daly, Keith | 25 |
Koppy, Larry | 23 |
Mater, James | 14 |
Mowrey, Kevin | 25 |
Project Total: 201 |
Project Date: | 7/16/2010 to 7/17/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Indian Heaven - Blue Lake |
Description: | Logged out 52 trees (32: <6", 9: 6"-12", 11: >12"). |
Volunteers |
Hours |
Hawley, Karla | 16 |
Hovin, Leif | 12 |
Winkel, Jeannette | 12 |
Project Total: 40 |
Project Date: | 7/13/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Jim Webb |
Location: | Trout Creek toward Sedum Ridge |
Description: | Brushing and limbing with group. |
Volunteers |
Hours |
Webb, Jim | 10 |
Project Total: 10 |
Project Date: | 7/1/2010 to 7/3/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Sedum Ridge |
Description: | Cleaned up 3 rotten logs. Cut and removed 3 logs (8" to 14"). 1.25 miles of brushing with a power brusher (3/4 mile was heavy). |
Volunteers |
Hours |
Carr, Pete | 19 |
Hansen, Kara | 11 |
Hawley, Karla | 9 |
Hovin, Leif | 9 |
Lillesand, Mike | 19 |
Mater, James | 9 |
Owen, Kim | 9 |
Rosenberg, Rae | 9 |
Von Jenef, Amy | 9 |
Webb, Jim | 9 |
Project Total: 112 |
Project Date: | 6/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bob Arkes |
Location: | Road 23 to Mount Adams Wilderness boundary |
Description: | Logged out 9 trees (6" to 20"). Cleaned drain dips, brushed, tread repair. |
Volunteers |
Hours |
Arkes, Bob | 10 |
Hawley, Bill | 10 |
Mikol, Greg | 10 |
Murray, Michael | 10 |
Squires, Bob | 8 |
Turner, Tammy | 10 |
Weston, Ruth | 10 |
Project Total: 68 |
Project Date: | 6/11/2010 to 6/12/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Crest Camp to Big Huckleberry Mountain |
Description: | Loggeed out 17 trees (9: < 10", 8: 10"-18"). Cleaned 22 drain dips. Brushed 3/4 mile with power brusher. Spot berm removal, widening and grading on 1.5 miles. |
Volunteers |
Hours |
Appling, Bob | 22 |
Bilyeu, Katherine | 22 |
Booth, Jeff | 21 |
Carr, Pete | 22 |
Garber, Jon | 13 |
Hawley, Bill | 51 |
Hawley, Karla | 37 |
Hovin, Leif | 21 |
Koppy, Larry | 22 |
Mater, Elana | 6 |
Mater, James | 17 |
Mikol, Greg | 13 |
Pikkola, Dane | 21 |
Turner, Tammy | 13 |
Warner, Ray | 14 |
Warner, Sam | 14 |
Winkel, Jeannette | 21 |
Project Total: 350 |
Project Date: | 5/21/2010 to 5/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Sabler to Bridge of the Gods |
Description: | Scouting. Cleared 16 logs 3"-10". |
Volunteers |
Hours |
Owen, Kim | 21 |
Owen, Pam | 21 |
Project Total: 42 |
Project Date: | 5/13/2010 to 5/14/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Saw training at Trout Lake |
Description: | NWSA crosscut saw training and certification |
Volunteers |
Hours |
Owen, Kim | 19 |
Project Total: 19 |
Project Date: | 3/17/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Kim Owen |
Location: | Radio dispatch meeting at GPNF headquarters |
Description: | PCTA/USFS radio dispatch meeting |
Volunteers |
Hours |
Arkes, Bob | 5 |
Owen, Kim | 8 |
Roe, David | 5 |
Project Total: 18 |
Project Date: | 3/8/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 68 to Big Huckleberry Mountain |
Description: | Logged out 11 trees (3: 12"-24", 8: 4"-12"). Repaired 4 slides (20'-40'). Brushed 8x10 corridor. 1/8 mile slough removal. |
Volunteers |
Hours |
Arkes, Bob | 13 |
Carr, Pete | 13 |
Hawley, Bill | 19 |
Hawley, Karla | 2 |
Martiny, Chuck | 13 |
Warner, Sam | 13 |
Webb, Jim | 13 |
Project Total: 86 |
Project Date: | 2/22/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Road 2070 |
Description: | Logged out 11 trees (7 - under 10", 3 - 10" to 24", 1 - rotton 30"), cleared 5 slides between 15' and 20' each. Trimmed 8x10 corridor. Repaired tread where crushed by log. |
Volunteers |
Hours |
Hawley, Bill | 12 |
Martiny, Chuck | 12 |
Warner, Sam | 12 |
Project Total: 36 |
Project Date: | 1/18/2010 |
Agency: | Mount Adams Ranger District |
Leader: | Jim Webb |
Location: | Trout Creek toward Sedum Ridge |
Description: | Scouting. General cleanup of brush, rock and small log removal. |
Volunteers |
Hours |
Webb, Jim | 7 |
Project Total: 7 |
Project Date: | 10/22/2009 |
Agency: | Mount Adams Ranger District |
Leader: | Bill Hawley |
Location: | Wind River tool cache |
Description: | Tool purchase and repair |
Volunteers |
Hours |
Arkes, Bob | 7 |
Hawley, Bill | 7 |
Project Total: 14 |