Volunteer Projects — Pacific Crest Trail Association
Mount Hood National Forest (Hood River, Zig Zag and Clackamas River Ranger Districts)
10/1/2009 to 9/30/2010
Activity Summary |
Scouting: | 69 |
Trail Maintenance (PCT): | 1539 |
Total Volunteer Hours: | 1608 |
Activity Detail (most recent on top) |
Project Date: | 9/11/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Timberline Lodge to Barlow Pass |
Description: | Cleaned 70 drain dips and 30 water bars. Brushed 300' huckleberry, 60' mountain hemlock and 50' of fir branches. Repaied 300' of tread. |
Volunteers |
Hours |
Duncan, Tim | 10 |
Goodwin, Ron | 10 |
Halladay, Robert | 10 |
Hanes, Douglas | 10 |
Smith, Curtis | 10 |
Smith, Nyssa | 10 |
Turner, Tammy | 10 |
Wankowicz, Bex | 10 |
Project Total: 80 |
Project Date: | 8/7/2010 to 8/8/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to west side Roraring River Canyon |
Description: | Logged out 4 trees (22", 2x18", 12"). Cleaned 6 drain dips. Repaired 2 slides: 1) 10' section on west side Roaring River Canyon, tread restored; 2) 10' section right above previous one; water damage plus rocks. Reconnected trail at Lost Creen and Roaring River to discourage the creek going down the trail about 100' each of repair. Filled a hole on west side of Zig Zag Canyon as the trail leads out of the canyon. |
Volunteers |
Hours |
Cobb, Roberta | 19 |
Hanes, Douglas | 19 |
Ranganathan, Nandini | 19 |
Weston, Ruth | 19 |
Project Total: 76 |
Project Date: | 7/26/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline lodge to North Parasdise Park Junction |
Description: | Logged out four trees. Cut back willows at junction of North Paradise Park. Limbed one log so hikers could get by easily. |
Volunteers |
Hours |
Turner, Tammy | 11 |
Weston, Ruth | 11 |
Project Total: 22 |
Project Date: | 7/24/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Road 58 to Little Crater Lake |
Description: | Logged out 12 trees. Cleaned 5 drain dips and 4 water bars. Spot brushing of huckleberry and tree saplins. |
Volunteers |
Hours |
Plant, Steve | 9 |
Price, Tracy | 9 |
Project Total: 18 |
Project Date: | 7/22/2010 to 7/24/2010 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Indian Springs to Indian Mountain |
Description: | Cleaned 6 drain dips. Brushed and repaired tread on 1000' of trail. Constructred 180 feet of rock retaining wall on both sides of trail and 220 feet of single (uphill) retaining wall per Ken Kollas. |
Volunteers |
Hours |
Barnett, AJ | 11 |
Donovan, Katie | 11 |
Hopkins, Levi | 11 |
Koppy, Larry | 20 |
Melander, David | 26 |
Miller, Garth | 11 |
Nanson, Sarah | 11 |
Regehr, Don | 11 |
Vhay, John | 26 |
Project Total: 138 |
Project Date: | 7/19/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to Zig Zag River |
Description: | Logged out 9 trees. Cleaned six drain dips. Brushed 100' by the wet wall. |
Volunteers |
Hours |
Beckwith, Bozeb | 7 |
Carr, Pete | 9 |
Hanes, Douglas | 9 |
Koppy, Larry | 10 |
Meador, Corey | 14 |
Pikkola, Dane | 8 |
Ranganathan, Nandini | 8 |
Weston, Ruth | 8 |
Project Total: 73 |
Project Date: | 7/17/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Patty Carter |
Location: | Lolo Pass to Muddy Fork |
Description: | Logged out 6 trees. |
Volunteers |
Hours |
Carter, Patty | 10 |
O'Neil, Geoff | 10 |
Project Total: 20 |
Project Date: | 7/16/2010 to 7/18/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Ernie Strahm |
Location: | Jude Lake to Jefferson Wilderness Boundary |
Description: | Logged out 95 trees (3"-18"). Cleaned 5 waterbars and repaired 1 slide. |
Volunteers |
Hours |
Cuerden-Robertson, Becky | 18 |
Robertson, Clyde | 18 |
Strahm, Ernie | 20 |
Ugrai, Miklos | 17 |
Project Total: 73 |
Project Date: | 7/15/2010 to 7/17/2010 |
Agency: | Hood River Ranger District |
Leader: | John Vhay |
Location: | Indian Springs to Indian Mountain |
Description: | Cleaned 4 drain dips and 3 water bars. Rebuilt 100 feet of tread installing 3 feet of retaining rock wall and lower wall to hold tread. Filled trail and compacted soil. Decommissioned illegal campsites at Wahtum Lake. |
Volunteers |
Hours |
Hanes, Douglas | 21 |
Squires, Bob | 9 |
Vhay, John | 21 |
Project Total: 51 |
Project Date: | 7/13/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge to east rim of Zig Zag Canyon |
Description: | Scouting. |
Volunteers |
Hours |
Weston, Ruth | 7 |
Project Total: 7 |
Project Date: | 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Patty Carter |
Location: | Lolo Pass to Muddy Fork |
Description: | Scouting. 6 small and 2 large trees moved from the trail. |
Volunteers |
Hours |
Carter, Patty | 10 |
O'Neil, Geoff | 10 |
Project Total: 20 |
Project Date: | 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass ot Road 240 |
Description: | Logged out 9 trees (6" to 24"). Cleaned 4 drain dips and 3 water bars. Spot brushing of huckleberry on lower 1 mile of trails and rhododendron on upper. |
Volunteers |
Hours |
Plant, Steve | 10 |
Price, Tracy | 10 |
Project Total: 20 |
Project Date: | 7/9/2010 to 7/10/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Ramona Falls to Paradise Park |
Description: | Logged out 15 trees (1: 28", 10: 12"-20", 4: <12"). Cleaned 33 drain dips. Brushed 1.25 miles from 4200' to 4800'. Worked on boggy slope near spring to control sliding mud. Removed berm in several areas of cupped trail. |
Volunteers |
Hours |
Cunningham, John | 17 |
Hovin, Leif | 17 |
Koppy, Larry | 18 |
Legg, Nick | 17 |
O'Donnell, Erin | 17 |
Owen, Kim | 23 |
Owen, Pam | 19 |
Schmidt, Rick | 15 |
Smith, Curtis | 17 |
Weston, Ruth | 17 |
Project Total: 177 |
Project Date: | 7/8/2010 to 7/10/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Lemiti Meadows |
Description: | Trail maintenance. |
Volunteers |
Hours |
Boeckman, Renee | 19 |
Hunt, Donna | 13 |
Levy, Kathy | 19 |
Patterson, Bob | 13 |
Project Total: 64 |
Project Date: | 7/8/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Logged out 25 trees (8: 4"-8"), 12: 9"-15"), 5: 16"-25"). Cleaned 30 drain dips and 7 waterbars. Cut back 50' of inside slope on lower slide area. Brushed 150' of huckleberry and vine maple. Repaired 25' of tread. Limbed 75' to 8x10 standard. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Hanes, Douglas | 9 |
Hansen, Kara | 9 |
Melander, David | 9 |
Project Total: 45 |
Project Date: | 7/8/2010 to 7/9/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Olallie Lake to Lodgepole acess trail |
Description: | Logged out 12 trees on 7/8 and 25 trees on 7/9. |
Volunteers |
Hours |
Bentz, Jerry | 9 |
Bowen, Steve | 16 |
Farrier, Bruce | 16 |
Farrier, Melissa | 16 |
Heath, Kirk | 9 |
Lister, Norlene | 9 |
Livermore, Rich | 16 |
Livermore, Stacy | 16 |
Schlitt, Barbara | 16 |
Stockman, Bonnie | 9 |
Warren, Jack | 16 |
Project Total: 148 |
Project Date: | 7/8/2010 to 7/10/2010 |
Agency: | Clackamas River Ranger District |
Leader: | Becky Wolf |
Location: | Timpothy Lake to Pinhead Saddle |
Description: | Logged out 45 trees. |
Volunteers |
Hours |
DeVall, Dolores | 20 |
DeVall, Marty | 20 |
Hunt, Bob | 22 |
Hunt, Pat | 22 |
Kinish, Korinne | 20 |
McBurnie, Mary Ann | 14 |
Sischo, Gary | 21 |
Sischo, Peg | 21 |
Stodick, Katie | 14 |
Wolf, Becky | 23 |
Project Total: 197 |
Project Date: | 7/5/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ruth Weston |
Location: | Timberline Lodge |
Description: | Aborted scouting (too much snow). |
Volunteers |
Hours |
Weston, Ruth | 4 |
Project Total: 4 |
Project Date: | 7/2/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Ron Goodwin |
Location: | Barlow Pass to Timberline Lodge |
Description: | Scouting. Removed 6 small trees with a hand saw. |
Volunteers |
Hours |
Goodwin, Katie | 9 |
Goodwin, Ron | 9 |
Project Total: 18 |
Project Date: | 6/20/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Barlow Pass south |
Description: | Logged out 25 trees (5: B logs, 20 A logs). |
Volunteers |
Hours |
Caldwell, Robert | 8 |
Cobb, Roberta | 12 |
Covey, Kathy | 9 |
Hanes, Douglas | 8 |
Koppy, Larry | 10 |
Mater, James | 8 |
McKinstry, Mindy | 8 |
Ranganathan, Nandini | 8 |
Project Total: 71 |
Project Date: | 6/12/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Rushing Water Creek |
Description: | Scouting |
Volunteers |
Hours |
O'Neil, Geoff | 11 |
Project Total: 11 |
Project Date: | 6/12/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Kim Owen |
Location: | Sandy River crossing |
Description: | Tread rehab. |
Volunteers |
Hours |
Curtain, Gavin | 12 |
Curtain, Joe | 12 |
Gustafson, Nicholas | 12 |
Owen, Kim | 17 |
Phillips, Luke | 12 |
Phillips, Mark | 12 |
Phillips, Tom | 12 |
Pool, Chris | 12 |
Pool, Fred | 12 |
Reichle, Dave | 12 |
Whalen, Dan | 12 |
Whalen, Jeff | 12 |
Project Total: 149 |
Project Date: | 5/30/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Road 58 area |
Description: | Logged out 13 trees (all under 6" with axe and hand saw). Brushed huckleberry for 2.5 miles. |
Volunteers |
Hours |
Plant, Steve | 8 |
Price, Tracy | 8 |
Project Total: 16 |
Project Date: | 5/23/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Logged out 3 trees (2 A on the PCT and 1 B on the Twin Lakes Trail). |
Volunteers |
Hours |
Ames, Julie | 5 |
Cobb, Roberta | 6 |
Project Total: 11 |
Project Date: | 5/17/2010 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Logged out 7 trees (6 A size, 1 small B) |
Volunteers |
Hours |
Brown, Maureen | 6 |
Cobb, Roberta | 6 |
Neitch, Ulli | 6 |
Project Total: 18 |
Project Date: | 5/14/2010 |
Agency: | Zig Zag Ranger District |
Leader: | Steve Plant |
Location: | Wapinitia Pass to Little Crater Lake |
Description: | Scouting. |
Volunteers |
Hours |
Plant, Steve | 9 |
Project Total: 9 |
Project Date: | 10/4/2009 |
Agency: | Hood River Ranger District |
Leader: | Roberta Cobb |
Location: | Frog Lake north |
Description: | Repaired many drain dips, light brushing and slough removal for 3 miles. |
Volunteers |
Hours |
Booth, Jeff | 9 |
Bunting, Clint | 9 |
Carr, Pete | 9 |
Cather, Robert | 9 |
Cobb, Roberta | 8 |
Covey, Kathy | 10 |
Dolinar, Brian | 9 |
Spartis, Diana | 9 |
Project Total: 72 |